Block 0305, lot 007
524 Geary St
- City’s use
- Multi-Family Residential
- Built
- 1923
- Stories
- 6
- Units
- 88
- Rooms
- 70 bathrooms
- Building
- 44,365 sq ft
- Lot
- 9,452 sq ft
- Zoning
- RC4
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
30 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 24, 2022 | Expired or cancelled cancelled Jan 2026 | 524 Geary St | to comply with accessible business entrance program, construct a power door operator in lieu of level landings adjoining exterrior and interiror door of (e) building required to be made accessible to persons with disabilities per da-05 automatic doors to comply with ansi/bhma a156Details
to comply with accessible business entrance program, construct a power door operator in lieu of level landings adjoining exterrior and interiror door of (e) building required to be made accessible to persons with disabilities per da-05 automatic doors to comply with ansi/bhma a156 | $8,500 | |
| Oct 1, 2021 | Never finaled issued Dec 2021, no final | 520 Geary St | American Alarm Co Inc | replace existing system sensor strobes&horn/strobes w/new system sensor l-series strobes&horn/strobes. replace existing system sendor mini-horns w/new system sensor l-series compact low frequency sounders.existing wiring&conduit to remain.no change to existing fire alarm control panel,extender panelDetails
replace existing system sensor strobes&horn/strobes w/new system sensor l-series strobes&horn/strobes. replace existing system sendor mini-horns w/new system sensor l-series compact low frequency sounders.existing wiring&conduit to remain.no change to existing fire alarm control panel,extender panel | $20,000 |
| Jan 14, 2021 | Never finaled filed Jan 2021, never issued | 520 Geary St | North Star Plumbing & Fire Protection | we urgently fire sprinkler head for units 307, 309, 403, 410, 606 & 607 remodelDetails
we urgently fire sprinkler head for units 307, 309, 403, 410, 606 & 607 remodel | $8,600 |
| Jun 12, 2020 | Completed final sign-off Jul 2020 | 520 Geary St | Bkr Services Inc Dba Bkr Construction Se | units 104, 402, 502, 503 & 505 - remove and replace kitchen cabinets in-kind, overlay plank flooring over existing wood floor, full unit paint install led light fixturesDetails
units 104, 402, 502, 503 & 505 - remove and replace kitchen cabinets in-kind, overlay plank flooring over existing wood floor, full unit paint install led light fixtures | $150,000 |
| Oct 24, 2019 | Completed final sign-off Jul 2022 | 520 Geary St | Hon's Construction Inc. | reno apt unit 507, 5th fl - new bedroom, new kitchen cabinet and plumbing fixtures. new washer/dryer & dishwasher. new lighting at (e) j-boxes. no change to mechanical. no exterior work, fire alarm, sprinkler or structural workDetails
reno apt unit 507, 5th fl - new bedroom, new kitchen cabinet and plumbing fixtures. new washer/dryer & dishwasher. new lighting at (e) j-boxes. no change to mechanical. no exterior work, fire alarm, sprinkler or structural work | $65,000 |
| Jul 26, 2019 | Expired or cancelled suspend Aug 2025 | 520 Geary St | Hon's Construction Inc. | renovation of 104 & 610. new: reconfigure (e) layouts-kitchen cabinets, plm fixtures, lighting at (e) jbox locations, dishwashers, w/d. bathroom: new non-load bearing partion wall, remove (e) door and create new bathroom door. remove/seal l/r door.no change to mech,ext or fa/sprinklers or sturcturalDetails
renovation of 104 & 610. new: reconfigure (e) layouts-kitchen cabinets, plm fixtures, lighting at (e) jbox locations, dishwashers, w/d. bathroom: new non-load bearing partion wall, remove (e) door and create new bathroom door. remove/seal l/r door.no change to mech,ext or fa/sprinklers or sturctural | $120,000 |
| Jul 17, 2019 | Completed final sign-off Oct 2022 | 516 Geary St | S & H Renovations | to comply with abe program construct a power door operator in lieu of level landing adjoin ext and int doors of (e) bld reqd to be made accessible to those with disabilities. automatic door to comply with ans.bhma a156319Details
to comply with abe program construct a power door operator in lieu of level landing adjoin ext and int doors of (e) bld reqd to be made accessible to those with disabilities. automatic door to comply with ans.bhma a156319 | $8,000 |
| Jul 1, 2019 | Completed final sign-off Dec 2020 | 520 Geary St | Hon's Construction Inc. | remodel 2 units: 110-1/f; 211 on 2/f:each unit-new flooiring, new plumbing fixtures. no change to plumbing locations, no change to mech. no ext work. no f/a or f/s work. no structural. remodel bathroom in-kind.Details
remodel 2 units: 110-1/f; 211 on 2/f:each unit-new flooiring, new plumbing fixtures. no change to plumbing locations, no change to mech. no ext work. no f/a or f/s work. no structural. remodel bathroom in-kind. | $90,000 |
| Jun 4, 2019 | Completed final sign-off Jun 2022 | 520 Geary St | Hon's Construction Inc. | renovation of units: 307,309,403,410,606,607. convert 307,309,403,606,607 from studio to 1 bedrm, remodel of 410. new kitchen cabinets, new plm fixtures, new dishwashers & w/d, new lighting @ (e) jboxes. no change to mech/ext/fa/sprinklers. no struct workDetails
renovation of units: 307,309,403,410,606,607. convert 307,309,403,606,607 from studio to 1 bedrm, remodel of 410. new kitchen cabinets, new plm fixtures, new dishwashers & w/d, new lighting @ (e) jboxes. no change to mech/ext/fa/sprinklers. no struct work | $210,000 |
| Jun 4, 2019 | Completed final sign-off Jun 2022 | 520 Geary St | Hon's Construction Inc. | renovation of 3 units: 411a on 4th level & units 508a & 511a on 5th level. all units to be remodeled with new flooring & new plumbing fixtures. no change to plumbing locations. no change to mech. no exterior work. no fire alarm/sprinkler work. no structural. remodel bathrooms in kind.Details
renovation of 3 units: 411a on 4th level & units 508a & 511a on 5th level. all units to be remodeled with new flooring & new plumbing fixtures. no change to plumbing locations. no change to mech. no exterior work. no fire alarm/sprinkler work. no structural. remodel bathrooms in kind. | $40,000 |
| Mar 28, 2019 | Never finaled issued Mar 2019, no final | 520 Geary St | Halyard Inc | exploratory demo at units 307,309,403,410,508a,511a for structural evaluation demo not to exceed 50 sq ft @each unit, repalce in kind not a permanent demo project will not violte ch41 of the sf admin codeDetails
exploratory demo at units 307,309,403,410,508a,511a for structural evaluation demo not to exceed 50 sq ft @each unit, repalce in kind not a permanent demo project will not violte ch41 of the sf admin code | $5,000 |
| Aug 31, 2018 | Never finaled issued Aug 2018, no final | 520 Geary St | to renew permits noted below to obtain final inspection for pa# 200708170186 & 201003168334Details
to renew permits noted below to obtain final inspection for pa# 200708170186 & 201003168334 | ||
| Apr 20, 2018 | Expired or cancelled cancelled Jan 2026 | 520 Geary St | unit #511a - rebovation -revise kitchen & bath no change to exteriorDetails
unit #511a - rebovation -revise kitchen & bath no change to exterior | $20,000 | |
| Jan 24, 2018 | Never finaled issued Jan 2018, no final | 520 Geary St | street spaceDetails
street space | ||
| Jul 25, 2017 | Completed final sign-off Mar 2018 | 520 Geary St | #604: renovation to include new bedrm, new laundry. relocate kitchen & bath, new partitions, lighting, no exterior changes. this unit is on the 6th fl. life safety deferred if required.Details
#604: renovation to include new bedrm, new laundry. relocate kitchen & bath, new partitions, lighting, no exterior changes. this unit is on the 6th fl. life safety deferred if required. | $30,000 | |
| Jul 25, 2017 | Completed final sign-off Mar 2018 | 520 Geary St | Strong Builders Construction Inc. | #204: renovation to include new bedrm, new laundry. relocate kitchen & bath, new partitions, lighting, no exterior changes. this unit is on the 2nd fl. life safety deferred if required.Details
#204: renovation to include new bedrm, new laundry. relocate kitchen & bath, new partitions, lighting, no exterior changes. this unit is on the 2nd fl. life safety deferred if required. | $30,000 |
| Nov 5, 2015 | Completed final sign-off Dec 2015 | 520 Geary St | Make Ready Maintenance Inc | to obtain a final inspection for work approved under pa#200103083815. all work is complete. for units 401.406.507.512.Details
to obtain a final inspection for work approved under pa#200103083815. all work is complete. for units 401.406.507.512. | |
| Mar 21, 2013 | Completed final sign-off Apr 2013 | 524 Geary St | Make Ready Maintenance Inc | to comply w/ nov#201260144 & remove atm from this location. to repair plaster wall.Details
to comply w/ nov#201260144 & remove atm from this location. to repair plaster wall. | $5,000 |
| Oct 18, 2012 | Completed final sign-off Jul 2015 | 520 Geary St | American Alarm Co Inc | replace extg facu/install new initiation devices. install new evacuation notification sysem on a voluntary basisDetails
replace extg facu/install new initiation devices. install new evacuation notification sysem on a voluntary basis | $102,850 |
| Sep 20, 2012 | Completed final sign-off Dec 2012 | 520 Geary St | Young's Roofing, Inc. | reroofingDetails
reroofing | $48,600 |
| Mar 14, 2012 | Expired or cancelled withdrawn May 2012 | 520 Geary St | Aa Fire Systems Inc. | to comply with his nov 200236398- residential hotel sprinkler ordinance #170-02. install new fire sprinkler system in this existing building.Details
to comply with his nov 200236398- residential hotel sprinkler ordinance #170-02. install new fire sprinkler system in this existing building. | $59,597 |
| Mar 16, 2010 | Expired or cancelled expired Aug 2018 | 520 Geary St | Aa Fire Systems Inc. | fire sprinkler system installation, fire pump installation fire service underground installation. to comply with his nov #200236398, dated 12/16/2002.Details
fire sprinkler system installation, fire pump installation fire service underground installation. to comply with his nov #200236398, dated 12/16/2002. | $85,000 |
| Aug 17, 2007 | Expired or cancelled expired Jul 2009 | 520 Geary St | Gucho Plumbing | install new residential fire sprinkler system for entire building to comply with nov #200705743 & #200236398.Details
install new residential fire sprinkler system for entire building to comply with nov #200705743 & #200236398. | $35,000 |
| Sep 13, 2006 | Expired or cancelled cancelled Sep 2007 | 520 Geary St | Gucho Plumbing | 61 new fire sprinkler for all residential unitsDetails
61 new fire sprinkler for all residential units | $35,000 |
| Apr 2, 2001 | Expired or cancelled cancelled Apr 2001 | 520 Geary St | On-Site Maintenance | #312 rev. w/ details on pkans as requested by bulding inspector (2001/03/07/3666)Details
#312 rev. w/ details on pkans as requested by bulding inspector (2001/03/07/3666) | |
| Mar 12, 2001 | Completed final sign-off Apr 2001 | 520 Geary St | On-Site Maintenance | vacant store. replace sheetrock on cieling due to water damage.Details
vacant store. replace sheetrock on cieling due to water damage. | $2,500 |
| Mar 8, 2001 | Expired or cancelled expired Sep 2001 | 520 Geary St | On-Site Maintenance | n o v 200009937 units 401,406,507 & 512 minor kitchen remodel.Details
n o v 200009937 units 401,406,507 & 512 minor kitchen remodel. | $6,000 |
| Mar 7, 2001 | Expired or cancelled expired Jul 2001 | 520 Geary St | On-Site Maintenance | remodel kitchen unit #312 and bathrm. remove closet in living area as per/plans in unit 312Details
remodel kitchen unit #312 and bathrm. remove closet in living area as per/plans in unit 312 | $1,600 |
| Feb 16, 2001 | Expired or cancelled expired Aug 2001 | 520 Geary St | On-Site Maintenance | kitchen & bathroom remodel- new cabinets, lino, tile.Details
kitchen & bathroom remodel- new cabinets, lino, tile. | $8,000 |
| Nov 14, 2000 | Expired or cancelled expired Aug 2001 | 520 Geary St | On-Site Maintenance | renew for final inspection 9914999 permit #884387 only.Details
renew for final inspection 9914999 permit #884387 only. | $4,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- On-Site Maintenance (6), Hon's Construction Inc. (5), Aa Fire Systems Inc. (2), American Alarm Co Inc (2), Gucho Plumbing (2), Make Ready Maintenance Inc (2), Bkr Services Inc Dba Bkr Construction Se, Halyard Inc, North Star Plumbing & Fire Protection, S & H Renovations, Strong Builders Construction Inc., Young's Roofing, Inc.
- Architects
- Jacob Herczeg (6), Christopher Sullivan (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.