Skyline Capital Builders Llc
- Based in
- Walnut Creek
- On San Francisco permits
- Dec 2017 to Oct 2023
- Last 24 months
- 0 permits filed
57 permits since 2000: 53 completed, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
9 stairs permits: 8 completed, 1 expired or cancelled. Typically 80 days from filing to permit and 234 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 26, 2023 | Expired or cancelled withdrawn Aug 2023 | 2750 19th St | revision to issued permit 201712156665-s2 (arch/mep). provide new stair and small area of mezzanine deck infill, required for 2nd accessible egress due to travel distance being over 100 feet per cbc table 1006.2.1. stairways considered accessible means of egress/ 1009.3 exception 1.Details
revision to issued permit 201712156665-s2 (arch/mep). provide new stair and small area of mezzanine deck infill, required for 2nd accessible egress due to travel distance being over 100 feet per cbc table 1006.2.1. stairways considered accessible means of egress/ 1009.3 exception 1. | |
| Feb 24, 2023 | Completed final sign-off Jan 2024 | 200 Rhode Island St | deferred stair 2, 3, 4, 5 for main core & shell. pa# 201910023333.Details
deferred stair 2, 3, 4, 5 for main core & shell. pa# 201910023333. | $280,000 |
| Oct 25, 2022 | Completed final sign-off Oct 2023 | 170 Valencia St | demolition of interior non-structural walls, finishes, plubming fixtures, and stairs per ab-17.Details
demolition of interior non-structural walls, finishes, plubming fixtures, and stairs per ab-17. | $10,000 |
| Jun 27, 2022 | Completed final sign-off Sep 2022 | 101 Utah St | 1st-2nd fl: shop drawings, stair #2 structural drawings. ref pa# 201905312103 & 202104098253.Details
1st-2nd fl: shop drawings, stair #2 structural drawings. ref pa# 201905312103 & 202104098253. | |
| Jun 1, 2022 | Completed final sign-off Sep 2022 | 101 Utah St | interior stair #3 deferred submittal for 2019-0531-2103Details
interior stair #3 deferred submittal for 2019-0531-2103 | |
| Apr 9, 2021 | Completed final sign-off Jan 2023 | 101 Utah St | revision to arch/structural pa 201905312103 and mep pa 201906254344. elimanate large roof skylights; rr (new) removed from shell scope: electrical scope changed; adjust stair #2 layout; see page ao.01r for more specifics.Details
revision to arch/structural pa 201905312103 and mep pa 201906254344. elimanate large roof skylights; rr (new) removed from shell scope: electrical scope changed; adjust stair #2 layout; see page ao.01r for more specifics. | |
| Oct 6, 2020 | Completed final sign-off Feb 2021 | 888 Post St | priority - revisions to site permit 201912230310: delete 1st floor tenant improvement, demolish existing stair penthouse on roof, install new roof access hatch, and document technical infeasibility for existing non-compliant conditions in the stairway discovered during the course of construction.Details
priority - revisions to site permit 201912230310: delete 1st floor tenant improvement, demolish existing stair penthouse on roof, install new roof access hatch, and document technical infeasibility for existing non-compliant conditions in the stairway discovered during the course of construction. | $25,000 |
| Aug 25, 2020 | Completed final sign-off Dec 2025 | 55 New Montgomery St | new fire rated shaftwall construction for new electrical & mechanical systems on level 2 to 8. new fire protected stair enclosures. new electrical room in basement & 1 hour fire rated corridor on roof new mechanical units. steel equipment platforms & new tpo single - ply roofing system.Details
new fire rated shaftwall construction for new electrical & mechanical systems on level 2 to 8. new fire protected stair enclosures. new electrical room in basement & 1 hour fire rated corridor on roof new mechanical units. steel equipment platforms & new tpo single - ply roofing system. | $6,500,000 |
| Jul 21, 2020 | Completed final sign-off Jun 2021 | 1201 Bryant St | modify several rms located in basement, doors & relites. partial enclosures of central communcating stairs at basement level to create security barrier. stairs not egress. install prefab test chamber on 3rd flr. mep + f/a, sprinklers on separate permit.Details
modify several rms located in basement, doors & relites. partial enclosures of central communcating stairs at basement level to create security barrier. stairs not egress. install prefab test chamber on 3rd flr. mep + f/a, sprinklers on separate permit. | $525,000 |