Skyline Capital Builders Llc
- Based in
- Walnut Creek
- On San Francisco permits
- Dec 2017 to Oct 2023
- Last 24 months
- 0 permits filed
57 permits since 2000: 53 completed, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 expired or cancelled.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 24, 2023 | Expired or cancelled withdrawn Jun 2024 | 2750 19th St | revision to pa# 201712156665-s. provide wheelchair lift as allowed per cbc 11b-410 to provide accessible route to mezzannie. provide new 2nd stari per 1006.2-1 & small metal deck / infill @ (e) opening @ mezzanine deck.Details
revision to pa# 201712156665-s. provide wheelchair lift as allowed per cbc 11b-410 to provide accessible route to mezzannie. provide new 2nd stari per 1006.2-1 & small metal deck / infill @ (e) opening @ mezzanine deck. | |
| May 26, 2023 | Expired or cancelled withdrawn Aug 2023 | 2750 19th St | revision to issued permit 201712156665-s2 (arch/mep). provide new stair and small area of mezzanine deck infill, required for 2nd accessible egress due to travel distance being over 100 feet per cbc table 1006.2.1. stairways considered accessible means of egress/ 1009.3 exception 1.Details
revision to issued permit 201712156665-s2 (arch/mep). provide new stair and small area of mezzanine deck infill, required for 2nd accessible egress due to travel distance being over 100 feet per cbc table 1006.2.1. stairways considered accessible means of egress/ 1009.3 exception 1. |