Back to kitchen remodel contractors
Salgo Constructions
- Based in
- San Francisco
- On San Francisco permits
- Jun 2010 to Jan 2026
- Last 24 months
- 2 permits filed
47 permits since 2000: 42 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 6 completed, 2 never finaled. Typically 6 days from filing to permit and 547 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 1, 2021 | Completed final sign-off Aug 2023 | 2375 46th Av | convert 814 sqft of basement lvl to habitable space. remodel kitchen, bath, and add bath on main lvl. enclose existing entry stair w/new roof. new deck on grade in rear yard. plumbing & electrical in remodeled areas.Details
convert 814 sqft of basement lvl to habitable space. remodel kitchen, bath, and add bath on main lvl. enclose existing entry stair w/new roof. new deck on grade in rear yard. plumbing & electrical in remodeled areas. | $120,000 |
| Feb 18, 2021 | Never finaled issued Feb 2021, no final | 720 Tennessee St | 2 bathrooms remodel & kitchen counter top replacement. including electrical update for kitchen & bathroom only. all work in kind. no change of layout.Details
2 bathrooms remodel & kitchen counter top replacement. including electrical update for kitchen & bathroom only. all work in kind. no change of layout. | $35,000 |
| Apr 10, 2019 | Completed final sign-off Oct 2020 | 400 Rolph St | proposed interior remodel with structural. plm & ele work. replacement windows and doors on side and rear. new stairs at rear. kitchen remodel.Details
proposed interior remodel with structural. plm & ele work. replacement windows and doors on side and rear. new stairs at rear. kitchen remodel. | $40,000 |
| Dec 15, 2017 | Completed final sign-off Jul 2019 | 293 Surrey St | interior remodel which includes a remodel of a kitchen & livign room, new laundry closet, new mechanical room.& relocating one bedroom & bathroom to the front of the bldg.Details
interior remodel which includes a remodel of a kitchen & livign room, new laundry closet, new mechanical room.& relocating one bedroom & bathroom to the front of the bldg. | $180,000 |
| Sep 26, 2016 | Never finaled issued Sep 2016, no final | 718 Tennessee St | kitchen cabinets and fixtures replacement, bathroom tile and tub replacement. electrical update, replace shower valve/toilet and sink at 1/2 bathroom. in kind replacement of 3 windows and 1 sliding door at the rear walls of the building. no change on walls. add shower to half bath.Details
kitchen cabinets and fixtures replacement, bathroom tile and tub replacement. electrical update, replace shower valve/toilet and sink at 1/2 bathroom. in kind replacement of 3 windows and 1 sliding door at the rear walls of the building. no change on walls. add shower to half bath. | $40,000 |
| Aug 22, 2013 | Completed final sign-off Oct 2013 | 18 Ramona Av | kitchen remodel; replace countertops, installation of hardwood floor (cabinets to remain); replace water heater & furnace; to comply with cec 150(k) 8Details
kitchen remodel; replace countertops, installation of hardwood floor (cabinets to remain); replace water heater & furnace; to comply with cec 150(k) 8 | $9,000 |
| Nov 4, 2011 | Completed final sign-off Mar 2012 | 16 Ramona Av | remodel (e) kitchen & add new bathroom in (e) closet. no wall to be removed or addedDetails
remodel (e) kitchen & add new bathroom in (e) closet. no wall to be removed or added | $18,000 |
| Jun 3, 2011 | Completed final sign-off Mar 2016 | 18 Valley St | remodel both units. repair (e) deck. new kitchen cabinets 2nd floor. new kitchen upper cabinets 3rd floor.Details
remodel both units. repair (e) deck. new kitchen cabinets 2nd floor. new kitchen upper cabinets 3rd floor. | $27,500 |