Salgo Constructions
- Based in
- San Francisco
- On San Francisco permits
- Jun 2010 to Jan 2026
- Last 24 months
- 2 permits filed
47 permits since 2000: 42 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
3 deck permits: 3 completed. Typically 70 days from filing to permit and 554 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 1, 2021 | Completed final sign-off Aug 2023 | 2375 46th Av | convert 814 sqft of basement lvl to habitable space. remodel kitchen, bath, and add bath on main lvl. enclose existing entry stair w/new roof. new deck on grade in rear yard. plumbing & electrical in remodeled areas.Details
convert 814 sqft of basement lvl to habitable space. remodel kitchen, bath, and add bath on main lvl. enclose existing entry stair w/new roof. new deck on grade in rear yard. plumbing & electrical in remodeled areas. | $120,000 |
| Jan 27, 2012 | Completed final sign-off Mar 2012 | 5 Bennington St | repair front deck: replace some dry rot pickets and threads. less than 50%Details
repair front deck: replace some dry rot pickets and threads. less than 50% | $1,500 |
| Jun 3, 2011 | Completed final sign-off Mar 2016 | 18 Valley St | remodel both units. repair (e) deck. new kitchen cabinets 2nd floor. new kitchen upper cabinets 3rd floor.Details
remodel both units. repair (e) deck. new kitchen cabinets 2nd floor. new kitchen upper cabinets 3rd floor. | $27,500 |