Back to bathroom remodel contractors
Salgo Constructions
- Based in
- San Francisco
- On San Francisco permits
- Jun 2010 to Jan 2026
- Last 24 months
- 2 permits filed
47 permits since 2000: 42 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
16 bathroom remodel permits: 14 completed, 2 never finaled. Typically 5 days from filing to permit and 366 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 15, 2022 | Completed final sign-off Feb 2025 | 2727 41st Av | to create new bedroom, new master bedroom, 2 baths on existing 1st fl. infill under existing permitted structure. seismic upgrade to (e) first floorDetails
to create new bedroom, new master bedroom, 2 baths on existing 1st fl. infill under existing permitted structure. seismic upgrade to (e) first floor | $150,000 |
| Dec 1, 2021 | Completed final sign-off Aug 2023 | 2375 46th Av | convert 814 sqft of basement lvl to habitable space. remodel kitchen, bath, and add bath on main lvl. enclose existing entry stair w/new roof. new deck on grade in rear yard. plumbing & electrical in remodeled areas.Details
convert 814 sqft of basement lvl to habitable space. remodel kitchen, bath, and add bath on main lvl. enclose existing entry stair w/new roof. new deck on grade in rear yard. plumbing & electrical in remodeled areas. | $120,000 |
| Feb 18, 2021 | Never finaled issued Feb 2021, no final | 720 Tennessee St | 2 bathrooms remodel & kitchen counter top replacement. including electrical update for kitchen & bathroom only. all work in kind. no change of layout.Details
2 bathrooms remodel & kitchen counter top replacement. including electrical update for kitchen & bathroom only. all work in kind. no change of layout. | $35,000 |
| Jul 9, 2019 | Completed final sign-off Jul 2020 | 400 Rolph St | revision to 201904107598. remove bathroom at garage level, remove interior stairs, change at vestibule 2nd flDetails
revision to 201904107598. remove bathroom at garage level, remove interior stairs, change at vestibule 2nd fl | $5,000 |
| Dec 15, 2017 | Completed final sign-off Jul 2019 | 293 Surrey St | interior remodel which includes a remodel of a kitchen & livign room, new laundry closet, new mechanical room.& relocating one bedroom & bathroom to the front of the bldg.Details
interior remodel which includes a remodel of a kitchen & livign room, new laundry closet, new mechanical room.& relocating one bedroom & bathroom to the front of the bldg. | $180,000 |
| Sep 26, 2016 | Never finaled issued Sep 2016, no final | 718 Tennessee St | kitchen cabinets and fixtures replacement, bathroom tile and tub replacement. electrical update, replace shower valve/toilet and sink at 1/2 bathroom. in kind replacement of 3 windows and 1 sliding door at the rear walls of the building. no change on walls. add shower to half bath.Details
kitchen cabinets and fixtures replacement, bathroom tile and tub replacement. electrical update, replace shower valve/toilet and sink at 1/2 bathroom. in kind replacement of 3 windows and 1 sliding door at the rear walls of the building. no change on walls. add shower to half bath. | $40,000 |
| Aug 19, 2016 | Completed final sign-off Oct 2017 | 1054 Ingerson Av | add a half bathroom at basement and 1 new window & laundry sinkDetails
add a half bathroom at basement and 1 new window & laundry sink | $3,500 |
| Jun 22, 2016 | Completed final sign-off Jun 2017 | 2856 Union St | bathroom: replace shower pan, replace shower mixer. install new tile on shower walls & floowing.Details
bathroom: replace shower pan, replace shower mixer. install new tile on shower walls & floowing. | $7,000 |
| Oct 6, 2015 | Completed final sign-off Mar 2016 | 626 30th Av | convert rear portion of garage 377 sq ft into habitable space: include 1 bedroom, 1 bathroom, and utility room. excavate 6" to obtain 8 feet ceiling height in new bedroom.Details
convert rear portion of garage 377 sq ft into habitable space: include 1 bedroom, 1 bathroom, and utility room. excavate 6" to obtain 8 feet ceiling height in new bedroom. | $50,000 |
| Sep 3, 2014 | Completed final sign-off Dec 2017 | 1054 Ingerson Av | revision to app#201306189787 and 201406249346. raise up roof to create a new bedroom 128 sq ft. add shower 12 sq.ft. to (e) approve bathroom @ 2nd floor / modified layout of it.Details
revision to app#201306189787 and 201406249346. raise up roof to create a new bedroom 128 sq ft. add shower 12 sq.ft. to (e) approve bathroom @ 2nd floor / modified layout of it. | $6,000 |
| Jun 18, 2013 | Completed final sign-off Dec 2017 | 1054 Ingerson Av | comply with n.o.v. #201300201- 2 ft vertical height & 180 sq horizontal addition, conversion of attic space into 1 bedroom & 1 bathroom at rear.Details
comply with n.o.v. #201300201- 2 ft vertical height & 180 sq horizontal addition, conversion of attic space into 1 bedroom & 1 bathroom at rear. | $14,000 |
| Apr 11, 2012 | Completed final sign-off Feb 2013 | 215 Clara St | revision to appl #2010.01.11.4524 - phase changes, interior t.i. for nursery: stair layout changed & additoin of shower inside @ bathroom; relocate west side curb cut & add level landing @ door. electrical & mechancial under separate permit.Details
revision to appl #2010.01.11.4524 - phase changes, interior t.i. for nursery: stair layout changed & additoin of shower inside @ bathroom; relocate west side curb cut & add level landing @ door. electrical & mechancial under separate permit. | $1,000 |
| Nov 4, 2011 | Completed final sign-off Mar 2012 | 16 Ramona Av | remodel (e) kitchen & add new bathroom in (e) closet. no wall to be removed or addedDetails
remodel (e) kitchen & add new bathroom in (e) closet. no wall to be removed or added | $18,000 |
| Jan 27, 2011 | Completed final sign-off Dec 2011 | 18 Valley St | demolition of existing 2-bathroom, 1-bedroom; revert back to storage. remove & capped plumbing pipes. remove electrical wires. to comply with violation# 201055560.Details
demolition of existing 2-bathroom, 1-bedroom; revert back to storage. remove & capped plumbing pipes. remove electrical wires. to comply with violation# 201055560. | $12,000 |
| Dec 23, 2010 | Completed final sign-off Mar 2011 | 2346 20th Av | add full bath, bedroom and family room to garage levelDetails
add full bath, bedroom and family room to garage level | $79,500 |
| Jun 7, 2010 | Completed final sign-off Jun 2010 | 275 Santa Rosa Av | bathroom remodelling: remove existing tub/sliding door and tiles in the bathroom, install new tile and new shower pan, exchange toilet and sink vanity, painting. no new wall and no existing wall relocation.Details
bathroom remodelling: remove existing tub/sliding door and tiles in the bathroom, install new tile and new shower pan, exchange toilet and sink vanity, painting. no new wall and no existing wall relocation. | $4,200 |