Block 4043, lot 004
718 Tennessee St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 2
- Units
- 2
- Rooms
- 2 bathrooms
- Building
- 2,430 sq ft
- Lot
- 2,495 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 16, 2022 | Expired or cancelled cancelled Jan 2026 | 718 Tennessee St | Dissmeyer Corp, Dba Acme Roofing Co | tear off existing composition shingles to wood shingles or sheeting . apply new 40-year class a fiberglass shingles with #15 or #30 felt underlayment. install new metal edge flashings, pipe and flue jacks. wall step flashings and hip and ridge shingles.Details
tear off existing composition shingles to wood shingles or sheeting . apply new 40-year class a fiberglass shingles with #15 or #30 felt underlayment. install new metal edge flashings, pipe and flue jacks. wall step flashings and hip and ridge shingles. | $32,815 |
| Feb 18, 2021 | Never finaled issued Feb 2021, no final | 720 Tennessee St | Salgo Constructions | 2 bathrooms remodel & kitchen counter top replacement. including electrical update for kitchen & bathroom only. all work in kind. no change of layout.Details
2 bathrooms remodel & kitchen counter top replacement. including electrical update for kitchen & bathroom only. all work in kind. no change of layout. | $35,000 |
| Sep 6, 2017 | Never finaled issued Sep 2017, no final | 720 Tennessee St | street spaceDetails
street space | ||
| Sep 26, 2016 | Never finaled issued Sep 2016, no final | 718 Tennessee St | Salgo Constructions | kitchen cabinets and fixtures replacement, bathroom tile and tub replacement. electrical update, replace shower valve/toilet and sink at 1/2 bathroom. in kind replacement of 3 windows and 1 sliding door at the rear walls of the building. no change on walls. add shower to half bath.Details
kitchen cabinets and fixtures replacement, bathroom tile and tub replacement. electrical update, replace shower valve/toilet and sink at 1/2 bathroom. in kind replacement of 3 windows and 1 sliding door at the rear walls of the building. no change on walls. add shower to half bath. | $40,000 |
| Nov 6, 2014 | Completed final sign-off Jan 2015 | 720 Tennessee St | Sneed & Co Construction Inc. | replace rear wall cedar shingles with hardi panel lap siding; replace in kind, each 4' x 4' window; u-factor .32. compliance with maher ordinance no 155-13 not required.Details
replace rear wall cedar shingles with hardi panel lap siding; replace in kind, each 4' x 4' window; u-factor .32. compliance with maher ordinance no 155-13 not required. | $16,000 |
| Jul 1, 2011 | Never finaled issued Jul 2011, no final | 720 Tennessee St | street spaceDetails
street space |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.