S M Construction And Assoc
- Based in
- Daly City
- On San Francisco permits
- Jan 2011 to Jun 2026
- Last 24 months
- 4 permits filed
48 permits since 2000: 37 completed, 2 in progress, 4 never finaled, 5 expired or cancelled.
Of the 4 never-finaled permits, 3 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
8 stairs permits: 8 completed. Typically 99 days from filing to permit and 118 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 25, 2026 | Completed final sign-off Jul 2026 | 700 Grand View Av | revision to pa# 2026-0414-9387 patio stair caseDetails
revision to pa# 2026-0414-9387 patio stair case | |
| Mar 17, 2025 | Completed final sign-off Oct 2025 | 237 Rolph St | revision to 202102094334 (unit legalization): shift rear deck/stair 12" west, new slab to replace (e) achieve 7'8" height for entire unit. breezeway foundation rev. heating rev to electric ductless heat pump (instead of gas)Details
revision to 202102094334 (unit legalization): shift rear deck/stair 12" west, new slab to replace (e) achieve 7'8" height for entire unit. breezeway foundation rev. heating rev to electric ductless heat pump (instead of gas) | $28,000 |
| Jan 18, 2022 | Completed final sign-off Mar 2022 | 713 Clementina St | to comply with complaint 201811301: 713 clementina st: replaced (e) structural post and new concrete pad on 1/f. 715 clementina st: replaced guardrail spindle stair well (4/f), replace handrail at stairwell all floors. no exterior work.Details
to comply with complaint 201811301: 713 clementina st: replaced (e) structural post and new concrete pad on 1/f. 715 clementina st: replaced guardrail spindle stair well (4/f), replace handrail at stairwell all floors. no exterior work. | $5,000 |
| Jan 11, 2022 | Completed final sign-off Nov 2024 | 706 Huron Av | to legalize unauthorized unit on first flr per covernment code sec 6582.2 w/ two bedrooms. one bathrm, kitchen & living/dining area. exterior deck & rear stairs.Details
to legalize unauthorized unit on first flr per covernment code sec 6582.2 w/ two bedrooms. one bathrm, kitchen & living/dining area. exterior deck & rear stairs. | $125,000 |
| Jun 10, 2021 | Completed final sign-off Mar 2022 | 713 Clementina St | replace in-kind secondary exist stairs btw 2 buildings. to comply w/ nov #201811271 cbc 1011.12.3: same configuration and constructionDetails
replace in-kind secondary exist stairs btw 2 buildings. to comply w/ nov #201811271 cbc 1011.12.3: same configuration and construction | $40,000 |
| Feb 9, 2021 | Completed final sign-off Oct 2025 | 237 Rolph St | legalize 1st floor unit per per gov code 65852.2. reconstruct 1-story rear yard stair to qualify emergency compliance for first fl bedrooms.(n) permeable surface & landscaping at front setback. replacement of existing rear stair with new 1-story deck and reconfigured stair to rear yard.Details
legalize 1st floor unit per per gov code 65852.2. reconstruct 1-story rear yard stair to qualify emergency compliance for first fl bedrooms.(n) permeable surface & landscaping at front setback. replacement of existing rear stair with new 1-story deck and reconfigured stair to rear yard. | $25,000 |
| Nov 27, 2019 | Completed final sign-off Feb 2020 | 70 Belcher St | repairs in kind less than 50% existing stairs @ rear side and @ rear porch, @ first and second and third floors and like siding on rear side walls. to comply with nov 201977491, # 4 and 5.Details
repairs in kind less than 50% existing stairs @ rear side and @ rear porch, @ first and second and third floors and like siding on rear side walls. to comply with nov 201977491, # 4 and 5. | $25,000 |
| Feb 22, 2017 | Completed final sign-off Jul 2018 | 2617 Laguna St | replace (e) deck & stair in kind, in rear of building.rebuild south side wood balcony & ladder in kind w/metal per pre-app meeting 3/8/16Details
replace (e) deck & stair in kind, in rear of building.rebuild south side wood balcony & ladder in kind w/metal per pre-app meeting 3/8/16 | $12,000 |