Block 0566, lot 004
2617 Laguna St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 3
- Units
- 5
- Rooms
- 5 bathrooms
- Building
- 3,488 sq ft
- Lot
- 2,953 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
16 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 2, 2025 | In progress issued Sep 2025 | 2617 Laguna St | apt 1 : carpet removal and replacement, 4ft of sheet rock replacement, paint, replacing 3 windows street facing in kind.Details
apt 1 : carpet removal and replacement, 4ft of sheet rock replacement, paint, replacing 3 windows street facing in kind. | $2,000 | |
| Oct 23, 2020 | Never finaled issued Jun 2021, no final | 2617 Laguna St | Tri-Signal Integration Inc. | converting existing dact to new cellular communicator; all existing system components and sequence of opertaion remain unchangedDetails
converting existing dact to new cellular communicator; all existing system components and sequence of opertaion remain unchanged | |
| Aug 31, 2020 | Completed final sign-off Sep 2020 | 2617 Laguna St | Buck Construction | tear out and replace in-kind front staircase. replace with new 3x12 pressure treated stringers with redwood treads & risers. 11 treads & risers. less than 50%Details
tear out and replace in-kind front staircase. replace with new 3x12 pressure treated stringers with redwood treads & risers. 11 treads & risers. less than 50% | $5,500 |
| Jun 24, 2019 | Never finaled issued Jun 2019, no final | 2617 Laguna St | street spaceDetails
street space | ||
| Apr 17, 2019 | Never finaled issued Apr 2019, no final | 2617 Laguna St | street spaceDetails
street space | ||
| Feb 4, 2019 | Never finaled issued Feb 2019, no final | 2617 Laguna St | street spaceDetails
street space | ||
| Mar 20, 2018 | Completed final sign-off Nov 2019 | 2617 Laguna St | Engineered Soils Repairs | underpin north side foundation and install new concrete sister wall, replace west side perimeter footing and interior foundation wallDetails
underpin north side foundation and install new concrete sister wall, replace west side perimeter footing and interior foundation wall | $262,301 |
| Feb 22, 2017 | Completed final sign-off Jul 2018 | 2617 Laguna St | S M Construction And Assoc | replace (e) deck & stair in kind, in rear of building.rebuild south side wood balcony & ladder in kind w/metal per pre-app meeting 3/8/16Details
replace (e) deck & stair in kind, in rear of building.rebuild south side wood balcony & ladder in kind w/metal per pre-app meeting 3/8/16 | $12,000 |
| Jun 26, 2015 | Completed final sign-off Nov 2019 | 2617 Laguna St | Engineered Soils Repairs | soft story retrofit per mandated program (sfbc chapter 34b) based on 2012 iebc appendix a-4.Details
soft story retrofit per mandated program (sfbc chapter 34b) based on 2012 iebc appendix a-4. | $40,000 |
| Jan 23, 2015 | Never finaled issued Jan 2015, no final | 2617 Laguna St | Tri-Signal Integration Inc. | emergency fire alarm system facu replacement. there is no record plan or ul certificate for extg fa system. new panel is fire lite alarms model ms -4- exisiting is hochici al-150Details
emergency fire alarm system facu replacement. there is no record plan or ul certificate for extg fa system. new panel is fire lite alarms model ms -4- exisiting is hochici al-150 | $1,200 |
| Jun 22, 2012 | Completed final sign-off Aug 2012 | 2617 Laguna St | Curtis Myers | #3- revision to pa# 201202154207 & 201110187052. designation from #4 t0 #3. (former permit was incorrect); to change records. work to replace bathroom fixtures & remodel kitchen.Details
#3- revision to pa# 201202154207 & 201110187052. designation from #4 t0 #3. (former permit was incorrect); to change records. work to replace bathroom fixtures & remodel kitchen. | |
| May 2, 2012 | Completed final sign-off May 2012 | 2617 Laguna St | Sean Kelly Construction | stabilize with chemical grouting (geogrout) sandy soil conditions at property line for adjacent propertry stairway of 4 risers at 71/2 for a length of 16'-0"Details
stabilize with chemical grouting (geogrout) sandy soil conditions at property line for adjacent propertry stairway of 4 risers at 71/2 for a length of 16'-0" | $4,600 |
| Feb 15, 2012 | Completed final sign-off Aug 2012 | 2617 Laguna St | Curtis Myers | work in unit #4: rev. to permit applic. 32011-10-13-7052: changing bathroom fixtures (toilet, tub, lavy), adding some lighting and outlets. new tiled floor. high efficiency lighting or occupancy senssor control.Details
work in unit #4: rev. to permit applic. 32011-10-13-7052: changing bathroom fixtures (toilet, tub, lavy), adding some lighting and outlets. new tiled floor. high efficiency lighting or occupancy senssor control. | $15,000 |
| Oct 18, 2011 | Completed final sign-off Aug 2012 | 2617 Laguna St | Curtis Myers | #4 - changing kitchen cabinets & countertops. at least 50% high efficacy lighting per cec150(k). no change to exhaust system. no window, no door, no wall and no floor work. (except finishes) on this permit.Details
#4 - changing kitchen cabinets & countertops. at least 50% high efficacy lighting per cec150(k). no change to exhaust system. no window, no door, no wall and no floor work. (except finishes) on this permit. | $15,000 |
| Jun 17, 2010 | Never finaled issued Jun 2010, no final | 2617 Laguna St | street space permitDetails
street space permit | ||
| May 18, 2010 | Never finaled issued May 2010, no final | 2617 Laguna St | street spaceDetails
street space |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.