Back to kitchen remodel contractors
S M Construction And Assoc
- Based in
- Daly City
- On San Francisco permits
- Jan 2011 to Jun 2026
- Last 24 months
- 4 permits filed
48 permits since 2000: 37 completed, 2 in progress, 4 never finaled, 5 expired or cancelled.
Of the 4 never-finaled permits, 3 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 9 completed, 2 expired or cancelled. Typically 0 days from filing to permit and 187 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 24, 2023 | Completed final sign-off Jul 2023 | 3065 22nd Av | in kind remodel kitchen and 2 bathrooms - replace bathroom fixtures in kind. replace kitchen cabinet and countertop in kind. replace (e) garage door in kind - same size & location. in kind repair dry rot at shower (approx 10 sf). no floor and no wall layout changes. no structural work.Details
in kind remodel kitchen and 2 bathrooms - replace bathroom fixtures in kind. replace kitchen cabinet and countertop in kind. replace (e) garage door in kind - same size & location. in kind repair dry rot at shower (approx 10 sf). no floor and no wall layout changes. no structural work. | $48,500 |
| Mar 16, 2023 | Completed final sign-off Mar 2024 | 676 Capp St | revision to 202204212686 & 201712015271. relocate interior layout: kitchen, closet & bathroom. new skylights. new metal gate at front. additional fence at front and backyard. new window at left elevation to be wood, double-hung, integral ogee lugs.Details
revision to 202204212686 & 201712015271. relocate interior layout: kitchen, closet & bathroom. new skylights. new metal gate at front. additional fence at front and backyard. new window at left elevation to be wood, double-hung, integral ogee lugs. | |
| May 4, 2022 | Completed final sign-off Nov 2022 | 3817 26th St | kitchen remodel/partial structural upgradeDetails
kitchen remodel/partial structural upgrade | $25,000 |
| Jan 11, 2022 | Completed final sign-off Nov 2024 | 706 Huron Av | to legalize unauthorized unit on first flr per covernment code sec 6582.2 w/ two bedrooms. one bathrm, kitchen & living/dining area. exterior deck & rear stairs.Details
to legalize unauthorized unit on first flr per covernment code sec 6582.2 w/ two bedrooms. one bathrm, kitchen & living/dining area. exterior deck & rear stairs. | $125,000 |
| Sep 7, 2021 | Completed final sign-off Jun 2022 | 225 Maywood Dr | in kind replacement of kitchen cabinets, including (2) sinks, dishwasher and stove, new recesed lighting. no wall layout changes. lighting per cec 0.0(k)Details
in kind replacement of kitchen cabinets, including (2) sinks, dishwasher and stove, new recesed lighting. no wall layout changes. lighting per cec 0.0(k) | $15,000 |
| Jul 14, 2021 | Expired or cancelled expired Feb 2024 | 715 Clementina St | units 715a & 715b: kitchen sink replacement in kind in each apartment. replacement of each bathtub and bathroom sink in kind in apartment 715a & 715b. two kitchen sinks & two bathtubs & 2 bathroom sinks.Details
units 715a & 715b: kitchen sink replacement in kind in each apartment. replacement of each bathtub and bathroom sink in kind in apartment 715a & 715b. two kitchen sinks & two bathtubs & 2 bathroom sinks. | $12,500 |
| Apr 16, 2021 | Completed final sign-off Aug 2021 | 713 Clementina St | replace 5 windows at apartments 713, 713a and 713b at each apartment total 15 in kind. replace kitchen sink @ 713 & 713a & kitchen cabinet; repair some dry rot, siding in kind replacement @ front of rear building and light wall to nov2018113010-correct it.Details
replace 5 windows at apartments 713, 713a and 713b at each apartment total 15 in kind. replace kitchen sink @ 713 & 713a & kitchen cabinet; repair some dry rot, siding in kind replacement @ front of rear building and light wall to nov2018113010-correct it. | $20,000 |
| Apr 12, 2017 | Completed final sign-off Apr 2018 | 1282 Gilman Av | remodel of (e) kitchen & 2 bathrooms, replace of 9 windows in kind at rear sideDetails
remodel of (e) kitchen & 2 bathrooms, replace of 9 windows in kind at rear side | $28,000 |
| Oct 8, 2014 | Completed final sign-off Jan 2015 | 120 Harold Av | remodel of kitchen and hall bathroom in kind, new cabinets, countertop & sink, bathroom new shower, toilet & sink.Details
remodel of kitchen and hall bathroom in kind, new cabinets, countertop & sink, bathroom new shower, toilet & sink. | $25,000 |
| Jun 26, 2013 | Completed final sign-off Jul 2013 | 836 Dolores St | replace of (e) kitchen cabinets with new countertops at first and second floor 2 kitchens.Details
replace of (e) kitchen cabinets with new countertops at first and second floor 2 kitchens. | $4,500 |
| Mar 8, 2011 | Expired or cancelled expired Mar 2013 | 5 Garnett Tr | replacement of extg kitchen cabinets and countertop. no structural workDetails
replacement of extg kitchen cabinets and countertop. no structural work | $3,500 |