Back to bathroom remodel contractors
S M Construction And Assoc
- Based in
- Daly City
- On San Francisco permits
- Jan 2011 to Jun 2026
- Last 24 months
- 4 permits filed
48 permits since 2000: 37 completed, 2 in progress, 4 never finaled, 5 expired or cancelled.
Of the 4 never-finaled permits, 3 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 7 completed, 2 in progress, 1 expired or cancelled. Typically 0 days from filing to permit and 288 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 24, 2024 | In progress issued Nov 2024 | 1308 Pacific Av | to comply with nov 202429581 item# 1-5: unit 101: emergency bathroom remodel to repair water damage. remove of existing bathtub, toilet and sink and in kind. reinstall them at same location. replace tub with shower in same locationDetails
to comply with nov 202429581 item# 1-5: unit 101: emergency bathroom remodel to repair water damage. remove of existing bathtub, toilet and sink and in kind. reinstall them at same location. replace tub with shower in same location | $30,000 |
| Jul 31, 2024 | Completed final sign-off Oct 2025 | 2308 Bryant St | addition of new 3rd floor balcony, new rear exterior doors,replace windows and front entry gate (same location), addition of exterior trim at front facade. select interior work within building envelope at 3rd floor (unit #2) to include remodel of rear area, bathroom and new laundry.Details
addition of new 3rd floor balcony, new rear exterior doors,replace windows and front entry gate (same location), addition of exterior trim at front facade. select interior work within building envelope at 3rd floor (unit #2) to include remodel of rear area, bathroom and new laundry. | $120,000 |
| Mar 29, 2024 | In progress issued Mar 2024 | 210 02nd Av | at second floor, seperation of an interior office from the 1/2 bath that is currently connected. the (e) pocket door that connects the 2 rooms will be closed and a (n) door to the bathroom from the main hallway will be created. relocate bathroom electrical switches. bathroom sink, faucet, fixturesDetails
at second floor, seperation of an interior office from the 1/2 bath that is currently connected. the (e) pocket door that connects the 2 rooms will be closed and a (n) door to the bathroom from the main hallway will be created. relocate bathroom electrical switches. bathroom sink, faucet, fixtures | $17,000 |
| Mar 24, 2023 | Completed final sign-off Jul 2023 | 3065 22nd Av | in kind remodel kitchen and 2 bathrooms - replace bathroom fixtures in kind. replace kitchen cabinet and countertop in kind. replace (e) garage door in kind - same size & location. in kind repair dry rot at shower (approx 10 sf). no floor and no wall layout changes. no structural work.Details
in kind remodel kitchen and 2 bathrooms - replace bathroom fixtures in kind. replace kitchen cabinet and countertop in kind. replace (e) garage door in kind - same size & location. in kind repair dry rot at shower (approx 10 sf). no floor and no wall layout changes. no structural work. | $48,500 |
| Mar 16, 2023 | Completed final sign-off Mar 2024 | 676 Capp St | revision to 202204212686 & 201712015271. relocate interior layout: kitchen, closet & bathroom. new skylights. new metal gate at front. additional fence at front and backyard. new window at left elevation to be wood, double-hung, integral ogee lugs.Details
revision to 202204212686 & 201712015271. relocate interior layout: kitchen, closet & bathroom. new skylights. new metal gate at front. additional fence at front and backyard. new window at left elevation to be wood, double-hung, integral ogee lugs. | |
| Jul 14, 2021 | Expired or cancelled expired Feb 2024 | 715 Clementina St | units 715a & 715b: kitchen sink replacement in kind in each apartment. replacement of each bathtub and bathroom sink in kind in apartment 715a & 715b. two kitchen sinks & two bathtubs & 2 bathroom sinks.Details
units 715a & 715b: kitchen sink replacement in kind in each apartment. replacement of each bathtub and bathroom sink in kind in apartment 715a & 715b. two kitchen sinks & two bathtubs & 2 bathroom sinks. | $12,500 |
| Dec 1, 2017 | Completed final sign-off Mar 2024 | 674 Capp St | horizontal & vertical addition, interior remodel of (e)bldg. adding (n)1st fl with 2 new beds & 1 bath. add 2 new beds & 2 baths on 2nd fl. relocating dining & living room to 3rd fl and add new roof deck. one new unit portion on side of (e) bldg with 3 beds, 3 baths and roof deck. total add 2 units.Details
horizontal & vertical addition, interior remodel of (e)bldg. adding (n)1st fl with 2 new beds & 1 bath. add 2 new beds & 2 baths on 2nd fl. relocating dining & living room to 3rd fl and add new roof deck. one new unit portion on side of (e) bldg with 3 beds, 3 baths and roof deck. total add 2 units. | $850,000 |
| Apr 12, 2017 | Completed final sign-off Apr 2018 | 1282 Gilman Av | remodel of (e) kitchen & 2 bathrooms, replace of 9 windows in kind at rear sideDetails
remodel of (e) kitchen & 2 bathrooms, replace of 9 windows in kind at rear side | $28,000 |
| Oct 8, 2014 | Completed final sign-off Jan 2015 | 120 Harold Av | remodel of kitchen and hall bathroom in kind, new cabinets, countertop & sink, bathroom new shower, toilet & sink.Details
remodel of kitchen and hall bathroom in kind, new cabinets, countertop & sink, bathroom new shower, toilet & sink. | $25,000 |
| Jan 21, 2014 | Completed final sign-off Jan 2015 | 713 Clementina St | bathroom remodel - complaint # 201345532, eid 201345142, b 201345141, pid 201345152; mher ordinance 155-13 does not apply, interim controls does not applyDetails
bathroom remodel - complaint # 201345532, eid 201345142, b 201345141, pid 201345152; mher ordinance 155-13 does not apply, interim controls does not apply | $2,500 |