Back to kitchen remodel contractors
S F Garage Company Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jul 2000 to Apr 2026
- Last 24 months
- 6 permits filed
1,559 permits since 2000: 1,030 completed, 5 in progress, 177 never finaled, 347 expired or cancelled.
Of the 177 never-finaled permits, 3 are 3 to 5 years old, 18 are 5 to 10 years old, 156 are over 10 years old. 3 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
177 kitchen remodel permits: 126 completed, 22 never finaled, 29 expired or cancelled. Typically 0 days from filing to permit and 320 days from permit to final inspection.
Showing the 100 most recent of 177.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 19, 2023 | Completed final sign-off Mar 2024 | 908 Post St | new bathroom in sleeping room 15 on 3rd floor. no kitchen to be added.ccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccDetails
new bathroom in sleeping room 15 on 3rd floor. no kitchen to be added.cccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccc | $25,300 |
| Nov 27, 2023 | Completed final sign-off Mar 2024 | 908 Post St | new bathroom in 25 at 4th fl. no kitchen to be addedDetails
new bathroom in 25 at 4th fl. no kitchen to be added | $27,300 |
| Apr 7, 2023 | Never finaled issued Apr 2023, no final | 201 14th Av | comply with nov# 202303713: remodel of (3) kitchens and (6) bathrooms in kind. call for start of work inspection upon issuance of permit.Details
comply with nov# 202303713: remodel of (3) kitchens and (6) bathrooms in kind. call for start of work inspection upon issuance of permit. | $67,000 |
| Dec 28, 2022 | Expired or cancelled expired Dec 2024 | 908 Post St | 3/f-unit 16: install (n) bathroom. there is no existing kitchen in room #16 and no kitchen to be added.Details
3/f-unit 16: install (n) bathroom. there is no existing kitchen in room #16 and no kitchen to be added. | $10,833 |
| Dec 28, 2022 | Expired or cancelled expired Dec 2024 | 1337 Greenwich St | revision to 202109148371. increase of ceiling height at 3rd fl kitchen and living roomDetails
revision to 202109148371. increase of ceiling height at 3rd fl kitchen and living room | $4,000 |
| Aug 10, 2022 | Expired or cancelled expired Dec 2024 | 908 Post St | install (n) bathroom for 24 on 4th floor. there is no existing kitchen in room #24 and no kitchen to be added.Details
install (n) bathroom for 24 on 4th floor. there is no existing kitchen in room #24 and no kitchen to be added. | $7,500 |
| Apr 21, 2022 | Completed final sign-off Jun 2022 | 479 Ellis St | revision to bpa 201812249080. basement: minor flr plan revisions. reconfigure proposed elevator, removal of proposed bar, proposed walls, storage room, fire door at stairway behind kitchen. reconfigure of toter storage, replace proposed patio door with windows, removal of office door, new wall/door.Details
revision to bpa 201812249080. basement: minor flr plan revisions. reconfigure proposed elevator, removal of proposed bar, proposed walls, storage room, fire door at stairway behind kitchen. reconfigure of toter storage, replace proposed patio door with windows, removal of office door, new wall/door. | $20,000 |
| Apr 14, 2022 | Completed final sign-off May 2023 | 524 Oak St | (n) floor plan for all 3 floors. 1st fl: (n) bedroom, windows at front for bedroom egress. excavate portion of front for (n) windows, kitchen, office, laundry. (n) door. remove encloser. 2nd fl: remodel kitchen. relocate laundry. (n) window. 3rd fl: remove int stairs, remodel bath. (n) window.Details
(n) floor plan for all 3 floors. 1st fl: (n) bedroom, windows at front for bedroom egress. excavate portion of front for (n) windows, kitchen, office, laundry. (n) door. remove encloser. 2nd fl: remodel kitchen. relocate laundry. (n) window. 3rd fl: remove int stairs, remodel bath. (n) window. | $75,000 |
| Mar 9, 2022 | Completed final sign-off Jun 2022 | 479 Ellis St | minor revisions on all floors to pa 2018-1224-9080 - basement - bar removed (center expansion of elevator shaft wall addition of 2 layers drywall/gypboard; office reconfigured; reconfigured kitchen; 1st floor - 2 shaft relocated for future tenants; does not go to roof.Details
minor revisions on all floors to pa 2018-1224-9080 - basement - bar removed (center expansion of elevator shaft wall addition of 2 layers drywall/gypboard; office reconfigured; reconfigured kitchen; 1st floor - 2 shaft relocated for future tenants; does not go to roof. | $14,000 |
| Jan 26, 2022 | Completed final sign-off May 2023 | 524 Oak St | remodel ground floor bar, kitchen, laundry room and replacement of tub in 2nd floor bathroom. all non structural. single family dwelling.Details
remodel ground floor bar, kitchen, laundry room and replacement of tub in 2nd floor bathroom. all non structural. single family dwelling. | $40,000 |
| Jan 26, 2022 | Completed final sign-off Feb 2023 | 264 Gold Mine Dr | revision to bpa#202012211452 minor floor revisions basement-(n) bathroom / 1st fl: remodel(e)bathroom, (n) laundry closet. 2nd fl: kitchen remodel, remodel master bathroom & closet, relocate common bathroom (n) skylights/facade: replace facade window in kind. (n) garage door,(n) stucco facade.Details
revision to bpa#202012211452 minor floor revisions basement-(n) bathroom / 1st fl: remodel(e)bathroom, (n) laundry closet. 2nd fl: kitchen remodel, remodel master bathroom & closet, relocate common bathroom (n) skylights/facade: replace facade window in kind. (n) garage door,(n) stucco facade. | $30,000 |
| Nov 17, 2021 | Completed final sign-off May 2022 | 908 Post St | new bathroom for room 12 2nd fl. no kitchenDetails
new bathroom for room 12 2nd fl. no kitchen | $7,500 |
| Sep 14, 2021 | Completed final sign-off Oct 2021 | 2068 Pine St | to comply with enforcement case 2021 005277 enf.bsmt: legalize opening to storage beneath front stairs. 1st fl: restore staircase enclosure for unit separation. add stove 1st fl kitchen.new metal railing at facade,stairs not as shown frnt elevation.replace siding east/west front staircase to facadeDetails
to comply with enforcement case 2021 005277 enf.bsmt: legalize opening to storage beneath front stairs. 1st fl: restore staircase enclosure for unit separation. add stove 1st fl kitchen.new metal railing at facade,stairs not as shown frnt elevation.replace siding east/west front staircase to facade | $7,000 |
| Apr 23, 2021 | Never finaled filed Apr 2021, never issued | 960 Filbert St | raise bldg 18" (n)garage/seismic upgrade. (n)277 sqft garage.(n)586 sqft adu:#960a 2-bed,2-bath,1-living rm &1-kitchen. remodel 3rd/4th fl. infill east lightwell.square off rear bays on 3rd/4th fl. push back entry door to create req'd 3' landing. expand (e)roofdeck. (n)int'r stair access to roofdeckDetails
raise bldg 18" (n)garage/seismic upgrade. (n)277 sqft garage.(n)586 sqft adu:#960a 2-bed,2-bath,1-living rm &1-kitchen. remodel 3rd/4th fl. infill east lightwell.square off rear bays on 3rd/4th fl. push back entry door to create req'd 3' landing. expand (e)roofdeck. (n)int'r stair access to roofdeck | $600,000 |
| Mar 26, 2021 | Completed final sign-off Dec 2025 | 324 Collingwood St | reconfigure 3/f to add 2 (n) bedrooms, 1 (n) bathroom. reconfigure first floor to add 1 (n) half bathh, 1 (n) wet bar in theater room & 1 (n) store, 1 (n) bathroom, 1 (n) second kitchen in family room. add 1(n) wet bar & 1 (n) half bath at 2/f. (n) roof deck w/ new wet bar & 1 (n) hot tub.Details
reconfigure 3/f to add 2 (n) bedrooms, 1 (n) bathroom. reconfigure first floor to add 1 (n) half bathh, 1 (n) wet bar in theater room & 1 (n) store, 1 (n) bathroom, 1 (n) second kitchen in family room. add 1(n) wet bar & 1 (n) half bath at 2/f. (n) roof deck w/ new wet bar & 1 (n) hot tub. | $25,000 |
| Sep 18, 2020 | Expired or cancelled suspend Oct 2024 | 79 28th St | remodel in kind kitchen, 3 bathrooms, laundry, all rooms on 3 levels. remove laith and plaster, add 5/8 sheetrock throughout. add 5/8 type x on property line walls. walls to remain.Details
remodel in kind kitchen, 3 bathrooms, laundry, all rooms on 3 levels. remove laith and plaster, add 5/8 sheetrock throughout. add 5/8 type x on property line walls. walls to remain. | $400,000 |
| Aug 27, 2020 | Completed final sign-off Feb 2022 | 249 14th Av | unit #247 & #249: remodel in-kind 2 kitchens, 8 bathrooms, & 2 laundry room. remove all 1/2 sheetrock and install 5/8 type x sheetrock on pl walls and ceiling separation. replace all windows and doors in-kind. all work in-kind. no removal or layout change of walls.Details
unit #247 & #249: remodel in-kind 2 kitchens, 8 bathrooms, & 2 laundry room. remove all 1/2 sheetrock and install 5/8 type x sheetrock on pl walls and ceiling separation. replace all windows and doors in-kind. all work in-kind. no removal or layout change of walls. | $400,000 |
| May 21, 2020 | Expired or cancelled revoked Oct 2020 | 3665 Clay St | remodel in kind all bathrooms, laundry, kitchen, and upgrade all utilties throughout. remove laith and plaster throughout, and 5/8 type x throughout. everything in kind only.Details
remodel in kind all bathrooms, laundry, kitchen, and upgrade all utilties throughout. remove laith and plaster throughout, and 5/8 type x throughout. everything in kind only. | $312,000 |
| Mar 16, 2020 | Completed final sign-off Jun 2021 | 660 De Haro St | excavation for two patios in rear yard. remove exterior steps & (n) entry door @ front facade. remove windows, exterior door @ north. (n) multi slider door at rear. remove (e) deck covering at rear. remove of (e) vinyl siding at side & rear. 2 kitchen remodels, bathroom remodel, bathroom relocation.Details
excavation for two patios in rear yard. remove exterior steps & (n) entry door @ front facade. remove windows, exterior door @ north. (n) multi slider door at rear. remove (e) deck covering at rear. remove of (e) vinyl siding at side & rear. 2 kitchen remodels, bathroom remodel, bathroom relocation. | $20,000 |
| Dec 13, 2019 | Completed final sign-off Dec 2020 | 1336 Green St | unit 6. remodel kitchen and bath in-kind. remove all lath and plaster and replace w/ 5/8 type x sheetrock in kitchen and bath. approx 150 sq ftDetails
unit 6. remodel kitchen and bath in-kind. remove all lath and plaster and replace w/ 5/8 type x sheetrock in kitchen and bath. approx 150 sq ft | $30,000 |
| Oct 8, 2019 | Completed final sign-off Dec 2020 | 1336 Green St | addition of new unit on 1st fl, living rm, 2 bdrms, 1 kitchen, 1 office. remodel units 1,2,3. addition of office master bathrm. removal stairs to the rear.Details
addition of new unit on 1st fl, living rm, 2 bdrms, 1 kitchen, 1 office. remodel units 1,2,3. addition of office master bathrm. removal stairs to the rear. | $70,000 |
| Sep 18, 2019 | Completed final sign-off May 2023 | 2628 Steiner St | remodel/expand basement. remodel interior kitchen, dining, living, entry, powder, 3 bedrms, 2 bathrms, laundry. remove 4 (e) windows; replace 2 (e) doors; replace 1 (e) window; add 5 windows; add 1 exterior door; (all not visible from st).Details
remodel/expand basement. remodel interior kitchen, dining, living, entry, powder, 3 bedrms, 2 bathrms, laundry. remove 4 (e) windows; replace 2 (e) doors; replace 1 (e) window; add 5 windows; add 1 exterior door; (all not visible from st). | $50,000 |
| Jul 25, 2019 | Completed final sign-off Jun 2020 | 341 Day St | add dwelling unit# 341a(872 sq ft) w/ one bathroom and one kitchen.Details
add dwelling unit# 341a(872 sq ft) w/ one bathroom and one kitchen. | $4,000 |
| Jul 23, 2019 | Completed final sign-off Oct 2020 | 1848 Mason St | convert basement to habitable spac for (n) kitchen and living room. remodel of existing units 1848, 1850, 1852.Details
convert basement to habitable spac for (n) kitchen and living room. remodel of existing units 1848, 1850, 1852. | $2,000 |
| Jan 9, 2019 | Completed final sign-off Dec 2019 | 928 Lombard St | remodel in kind for units 928-30: 2 kitchen, 2 laundries and updating plum bing and elec throughout. remove finishes as needed for all upgradesDetails
remodel in kind for units 928-30: 2 kitchen, 2 laundries and updating plum bing and elec throughout. remove finishes as needed for all upgrades | $50,000 |
| Dec 4, 2018 | Completed final sign-off Nov 2019 | 2667 Clay St | expansion of existing garage and remodel of 1st & 2nd floor. 1st floor - garage expansion, relocation of bath and w/d. new storage, wind cellar and stairs;2nd fl - kitchen expansion and new officeDetails
expansion of existing garage and remodel of 1st & 2nd floor. 1st floor - garage expansion, relocation of bath and w/d. new storage, wind cellar and stairs;2nd fl - kitchen expansion and new office | $20,000 |
| Oct 25, 2018 | Expired or cancelled expired Dec 2024 | 3834 Geary Bl | addition of (1)(n) unit on 1st floor at rear storage building per ordinance #162-16. (n) unit #11: 300 sq ft studio with (1) kitchen and (1) bathroomDetails
addition of (1)(n) unit on 1st floor at rear storage building per ordinance #162-16. (n) unit #11: 300 sq ft studio with (1) kitchen and (1) bathroom | $30,000 |
| Jul 5, 2018 | Completed final sign-off Mar 2019 | 2046 Filbert St | remodel & expanion of unit #2046, conversion of 561 sq ft on ground fl to habitalbe space for unit #2046. relocate kitchen & living room, to ground fl. addition of master bath on 2nd fl. with layout change per plans, remodel unit #2048 with new layout throughout 3rd fl. (n) roof deck for unit #2048Details
remodel & expanion of unit #2046, conversion of 561 sq ft on ground fl to habitalbe space for unit #2046. relocate kitchen & living room, to ground fl. addition of master bath on 2nd fl. with layout change per plans, remodel unit #2048 with new layout throughout 3rd fl. (n) roof deck for unit #2048 | $75,000 |
| Jul 2, 2018 | Completed final sign-off Mar 2019 | 2048 Filbert St | lath & plaster with new 5/8" type x sheetrock. throughout all floors as needed. remodel 2 kitchens, 4 bathrooms and 2 laundry rooms for both units in-kind. no structural or relocation of any wall / window under this permitDetails
lath & plaster with new 5/8" type x sheetrock. throughout all floors as needed. remodel 2 kitchens, 4 bathrooms and 2 laundry rooms for both units in-kind. no structural or relocation of any wall / window under this permit | $60,000 |
| Apr 4, 2018 | Completed final sign-off Sep 2019 | 558 Filbert St | remodel of unit 558 filbert #10 - (e - approved) 1 living toom, 2 bedrooms, 1 bath, 1 kitchen. (n - proposed change to existing) - 1 living room, 3 bedrooms, 1 dining, 2 bathrooms, 1 kitchen, bu expanding into garage space ref 201604074232. revision to soft story pa#: 201603293409.Details
remodel of unit 558 filbert #10 - (e - approved) 1 living toom, 2 bedrooms, 1 bath, 1 kitchen. (n - proposed change to existing) - 1 living room, 3 bedrooms, 1 dining, 2 bathrooms, 1 kitchen, bu expanding into garage space ref 201604074232. revision to soft story pa#: 201603293409. | $50,000 |
| Mar 2, 2018 | Completed final sign-off Sep 2018 | 2810 Washington St | unit #2: remodel bathroom, kitchen, & 2 bedrooms in kind. new cabinets, vanity, sinks, toilet, plumbing fixtures. no structural work under this permit. no change of any (e) walls or new openings.Details
unit #2: remodel bathroom, kitchen, & 2 bedrooms in kind. new cabinets, vanity, sinks, toilet, plumbing fixtures. no structural work under this permit. no change of any (e) walls or new openings. | $40,000 |
| Dec 26, 2017 | Completed final sign-off Nov 2021 | 139 Baker St | addition of (2)(n) dwelling units on 1st floor per ordinance 162-16. (2) kitchens, (2) bedrooms, (2) bathrooms. revision to soft-story seismic retrofit pa# 2017-0908-7339: relocate shearwall locations to accommadate (n) adu.Details
addition of (2)(n) dwelling units on 1st floor per ordinance 162-16. (2) kitchens, (2) bedrooms, (2) bathrooms. revision to soft-story seismic retrofit pa# 2017-0908-7339: relocate shearwall locations to accommadate (n) adu. | $100,000 |
| Nov 2, 2017 | Completed final sign-off Apr 2019 | 2810 Washington St | additional of (n) unit on 2nd fl per ordinance #162-16. studio w/ (1) kitchen, (1) bathroom.Details
additional of (n) unit on 2nd fl per ordinance #162-16. studio w/ (1) kitchen, (1) bathroom. | $60,000 |
| Oct 11, 2017 | Completed final sign-off Apr 2019 | 2810 Washington St | remodel and expansion of existing unit 1 on 1st fl expand studio with 1 bath and kitchen to 1 living rm, 1 kitchen, 1 bedroom, 2 baths, office and media room.Details
remodel and expansion of existing unit 1 on 1st fl expand studio with 1 bath and kitchen to 1 living rm, 1 kitchen, 1 bedroom, 2 baths, office and media room. | $75,000 |
| Jun 12, 2017 | Completed final sign-off Mar 2022 | 1477 California St | add new unit on 1st floor per ord 162-16. 1 bedroom, 1 living room, 1 kitchen, 1 bathroom. ** maher: n/a **Details
add new unit on 1st floor per ord 162-16. 1 bedroom, 1 living room, 1 kitchen, 1 bathroom. ** maher: n/a ** | $65,000 |
| May 23, 2017 | Expired or cancelled expired Dec 2024 | 2310 Chestnut St | remodel kitchen in kind, new cabinet, counter top, sink, dishwasher, garbage disposal, tiles, no new openings. no structural work under this permit. all work in unit #1Details
remodel kitchen in kind, new cabinet, counter top, sink, dishwasher, garbage disposal, tiles, no new openings. no structural work under this permit. all work in unit #1 | $30,000 |
| Sep 27, 2016 | Completed final sign-off May 2018 | 2127 Taylor St | rear bldg. per unit legalization ordinance# 43-14. legalization of unit# 7 on 1st floor of 2131 taylor located in rear building. 1 bed, 1 bath, 1 kitchen.Details
rear bldg. per unit legalization ordinance# 43-14. legalization of unit# 7 on 1st floor of 2131 taylor located in rear building. 1 bed, 1 bath, 1 kitchen. | $20,000 |
| Sep 27, 2016 | Completed final sign-off Aug 2021 | 60 Sycamore St | addition of 2 new units (1 bed, 1 bath & 1 kitchen each) @ basement level per ordinance no# 30-15. soft story pa# 2015/07/14/1407. ** maher: n/a **Details
addition of 2 new units (1 bed, 1 bath & 1 kitchen each) @ basement level per ordinance no# 30-15. soft story pa# 2015/07/14/1407. ** maher: n/a ** | $100,000 |
| Sep 19, 2016 | Completed final sign-off Oct 2016 | 258 15th Av | remove extg wood beam, replace with new steel beam. remove wall in kitchen for open kitchen design.Details
remove extg wood beam, replace with new steel beam. remove wall in kitchen for open kitchen design. | $25,000 |
| Sep 13, 2016 | Completed final sign-off Mar 2019 | 1125 Union St | add unit per ord 30-15. add 2 units on grd floor. unit 7:434.6 sq ft with 1 bedroom,1 bath,1 kitchen,1 living room. unit 8:770.8 sq ft, with 1 bath,1 office,1 kitchen, 1 bedroom, 1 living room ** maher: n/a **Details
add unit per ord 30-15. add 2 units on grd floor. unit 7:434.6 sq ft with 1 bedroom,1 bath,1 kitchen,1 living room. unit 8:770.8 sq ft, with 1 bath,1 office,1 kitchen, 1 bedroom, 1 living room ** maher: n/a ** | $150,000 |
| Sep 1, 2016 | Completed final sign-off Oct 2021 | 909 Page St | addition of 2 units in basement per ordinance no.30-15 (n) studio unit #19=511 sq. ft. one bed/living room, one kitchen, one bahroom(n) studio unit #20=653 sq. ft. one bed/living room, one kitchen, one bathroom. seismic application (bpa #2015-11-23-3349). sprinkler deferred.Details
addition of 2 units in basement per ordinance no.30-15 (n) studio unit #19=511 sq. ft. one bed/living room, one kitchen, one bahroom(n) studio unit #20=653 sq. ft. one bed/living room, one kitchen, one bathroom. seismic application (bpa #2015-11-23-3349). sprinkler deferred. | $100,000 |
| May 26, 2016 | Completed final sign-off Jun 2021 | 650 De Haro St | front building: remodel 1 kitchen and 1 bath, replace all interior finishes. new drywall and insulaton. new plumbing fixtures and lighting & casework. no changes to location of, removal of, or addition of walls. no changes to existing layout. all new drywall to be 5/8" type x.Details
front building: remodel 1 kitchen and 1 bath, replace all interior finishes. new drywall and insulaton. new plumbing fixtures and lighting & casework. no changes to location of, removal of, or addition of walls. no changes to existing layout. all new drywall to be 5/8" type x. | $20,000 |
| May 18, 2016 | Completed final sign-off Oct 2016 | 2068 Pine St | revision to bpa #2015-0929-8309. new framing plans. new seismic design. change to: bathrooms all floors, kitchen 1st & 2nd floor, living room 1st floor.Details
revision to bpa #2015-0929-8309. new framing plans. new seismic design. change to: bathrooms all floors, kitchen 1st & 2nd floor, living room 1st floor. | $25,000 |
| Mar 23, 2016 | Completed final sign-off Jul 2019 | 1236 Haight St | addition of a new unit (772.75 sq.st) per ordinance no.30-15 seismic retrofit app# 201601006808 new unit: one bedroom, one bathroom, one kitchen.Details
addition of a new unit (772.75 sq.st) per ordinance no.30-15 seismic retrofit app# 201601006808 new unit: one bedroom, one bathroom, one kitchen. | $30,000 |
| Feb 9, 2016 | Completed final sign-off Jan 2020 | 1706 Grove St | addition of 1 new unit (653.6 sq.ft.) in 1st floor per ordinance# 30-15. seismic application pa# 201502188573. new unit has 2 bedrooms, 1 bath & 1 kitchen.Details
addition of 1 new unit (653.6 sq.ft.) in 1st floor per ordinance# 30-15. seismic application pa# 201502188573. new unit has 2 bedrooms, 1 bath & 1 kitchen. | $50,000 |
| Feb 9, 2016 | Expired or cancelled expired Dec 2024 | 376 Union St | addition of 1 new unit (484.5 sq.ft.) studio unit per ordinance# 30-15. seismic application pa# 201601116806. new unit has 1 bath & 1 kitchen.Details
addition of 1 new unit (484.5 sq.ft.) studio unit per ordinance# 30-15. seismic application pa# 201601116806. new unit has 1 bath & 1 kitchen. | $20,000 |
| Jan 21, 2016 | Completed final sign-off Jun 2021 | 650 De Haro St | rear building: remodel 2 kitchens & 2 bathrooms in kind , install new insulation & drywall at affected areas install new plumbing fixtures, lighting, casework & flooring, work located at rear building, no structural work or removal/ or relocate wall. in kitchen lighting & control per cec 150kDetails
rear building: remodel 2 kitchens & 2 bathrooms in kind , install new insulation & drywall at affected areas install new plumbing fixtures, lighting, casework & flooring, work located at rear building, no structural work or removal/ or relocate wall. in kitchen lighting & control per cec 150k | $35,000 |
| Dec 11, 2015 | Completed final sign-off Oct 2016 | 1050 Lake St | add (n) unit per ord. 30-15 seismic application #201504012578. (2) bedrooms & (1) bathroom & (1) kitchen.Details
add (n) unit per ord. 30-15 seismic application #201504012578. (2) bedrooms & (1) bathroom & (1) kitchen. | $10,000 |
| Nov 6, 2015 | Expired or cancelled expired Dec 2024 | 423 Green St | unit #423: remodel kitchen & bathroom in kind. no structural work. kitchen: min 50% of kitchen light watts by h.e. fixture. bathroom: h.e. or t-24 vacany sensor.Details
unit #423: remodel kitchen & bathroom in kind. no structural work. kitchen: min 50% of kitchen light watts by h.e. fixture. bathroom: h.e. or t-24 vacany sensor. | $25,000 |
| Sep 23, 2015 | Completed final sign-off Sep 2016 | 1690 Grove St | remodel kitchen and 1 bathroom in kind. new cabinets, sink, vanity, toilet, bathtub, tiles & light fixture. comply w/ cec 150(k) no structural workDetails
remodel kitchen and 1 bathroom in kind. new cabinets, sink, vanity, toilet, bathtub, tiles & light fixture. comply w/ cec 150(k) no structural work | $25,000 |
| Jun 17, 2015 | Expired or cancelled expired Dec 2024 | 2941 Mission St | unit #3 - remodel kitchen (8x8) & bathroom (5x8) in kind, new cabinets, sinks, countertop, toilets, bathtub & vanity. no structural work, no change to opening & wall layouts. 50% lighting wattage shall be high efficacy. comply with cec 150(k).Details
unit #3 - remodel kitchen (8x8) & bathroom (5x8) in kind, new cabinets, sinks, countertop, toilets, bathtub & vanity. no structural work, no change to opening & wall layouts. 50% lighting wattage shall be high efficacy. comply with cec 150(k). | $20,000 |
| Mar 27, 2015 | Expired or cancelled expired Apr 2018 | 2395 26th Av | unit #9: remodel kitchen & bathroom in kind, no structural work, complyy with cec 150(k) all work in unit #9, no wall moved or removed, or added.all existing layouts to remain unchanged.Details
unit #9: remodel kitchen & bathroom in kind, no structural work, complyy with cec 150(k) all work in unit #9, no wall moved or removed, or added.all existing layouts to remain unchanged. | $15,000 |
| Mar 27, 2015 | Expired or cancelled expired Apr 2018 | 2395 26th Av | remodel kitchen and bathroom in kind. no structural work. comply with cec 150(k). all work in unit 38. no walls moved, removed or added. all (e) layouts to remain unchanged.Details
remodel kitchen and bathroom in kind. no structural work. comply with cec 150(k). all work in unit 38. no walls moved, removed or added. all (e) layouts to remain unchanged. | $15,000 |
| Mar 27, 2015 | Expired or cancelled expired Jun 2018 | 2395 26th Av | remodel kitchen and bath. no structural. comply with cec 150 k. all work in unit 1. no walls moved, removed or added. all existing layouts remain unchanged.Details
remodel kitchen and bath. no structural. comply with cec 150 k. all work in unit 1. no walls moved, removed or added. all existing layouts remain unchanged. | $25,000 |
| Mar 27, 2015 | Expired or cancelled expired Apr 2018 | 2395 26th Av | unit #11: remodel kitchen & bathroom in kind, no structural work, comply with cec 150(k) all work in unit #11, no wall moved or removed or added, all (e) layouts to remain unchanged.Details
unit #11: remodel kitchen & bathroom in kind, no structural work, comply with cec 150(k) all work in unit #11, no wall moved or removed or added, all (e) layouts to remain unchanged. | $15,000 |
| Mar 27, 2015 | Expired or cancelled expired Jun 2018 | 2395 26th Av | unit #5 remodel kitchen & bathroom in kind. no structural work. to comply with iso(k). no walls moved or added. all (e) layout to remain the sameDetails
unit #5 remodel kitchen & bathroom in kind. no structural work. to comply with iso(k). no walls moved or added. all (e) layout to remain the same | $15,000 |
| Jan 16, 2015 | Expired or cancelled expired Dec 2024 | 45 Mccoppin St | remodel (1) kitchen, (10) kitchenette, & (8-1/2) bathrooms in kind. remodel two ada bathrooms in kind. new 5/8" type x gyp throughout second & third floor as needed.Details
remodel (1) kitchen, (10) kitchenette, & (8-1/2) bathrooms in kind. remodel two ada bathrooms in kind. new 5/8" type x gyp throughout second & third floor as needed. | $90,000 |
| Jan 8, 2015 | Completed final sign-off Mar 2016 | 120 10th St | remodel kitchen & bathroom in kind to find leaks & dry rot for all units, replace all lath & plaster with 5/8 type gyp board on 2nd & 3rd flrs; maher n/aDetails
remodel kitchen & bathroom in kind to find leaks & dry rot for all units, replace all lath & plaster with 5/8 type gyp board on 2nd & 3rd flrs; maher n/a | $70,000 |
| Nov 19, 2014 | Completed final sign-off Nov 2021 | 456 Vallejo St | rear bldg: basement: convert storage to habitable space including study, bedroom and bath. remodel kitchen and relocate stair to upper floor. at top floor remodel bedrooms and bathroom. new wood siding at front. new window and new roof deck.Details
rear bldg: basement: convert storage to habitable space including study, bedroom and bath. remodel kitchen and relocate stair to upper floor. at top floor remodel bedrooms and bathroom. new wood siding at front. new window and new roof deck. | $250,000 |
| Nov 19, 2014 | Completed final sign-off Nov 2021 | 456 Vallejo St | front bldg: unit #1: remodel unit including kitchen & bathroom. unit# 2: remodel unit including kitchen & bathroom. unit# 3: remodel unit including kitchen & bath. convert storage area at 1st floor into habitalbe space. provide connecting stair. new private roof decks.Details
front bldg: unit #1: remodel unit including kitchen & bathroom. unit# 2: remodel unit including kitchen & bathroom. unit# 3: remodel unit including kitchen & bath. convert storage area at 1st floor into habitalbe space. provide connecting stair. new private roof decks. | $300,000 |
| Oct 27, 2014 | Completed final sign-off May 2015 | 1480 Mcallister St | replace e foudation in crawl space and add new steel beam. remodel 8 full bathrooms, 3 kitchens, 3 half bathrooms, new lath and plaster, 3 laundry rooms, all remodels in kind.Details
replace e foudation in crawl space and add new steel beam. remodel 8 full bathrooms, 3 kitchens, 3 half bathrooms, new lath and plaster, 3 laundry rooms, all remodels in kind. | $20,000 |
| Sep 12, 2014 | Completed final sign-off Dec 2018 | 590 Lombard St | expand building within footprint. change 2 garage doors to similar looking windows. excavate garage for expansion. new plumbing, elec, hydronic heat, venting. sprinklers sep permit. new 1hr fire rated construction. replace kitchens and baths, new insulation, new interior finishes and roof decksDetails
expand building within footprint. change 2 garage doors to similar looking windows. excavate garage for expansion. new plumbing, elec, hydronic heat, venting. sprinklers sep permit. new 1hr fire rated construction. replace kitchens and baths, new insulation, new interior finishes and roof decks | $900,000 |
| Jul 22, 2014 | Completed final sign-off Dec 2014 | 1754 Mission St | unit 1: remodel kitchen & bathroom in kind, remove all lath & plaster du to bed bug infestation, replace with 5/8" type x sheetrock. kitchen: min 50% kitchen lighting by h.e watt fixture, bathroom t-24 or occupancy sensor.Details
unit 1: remodel kitchen & bathroom in kind, remove all lath & plaster du to bed bug infestation, replace with 5/8" type x sheetrock. kitchen: min 50% kitchen lighting by h.e watt fixture, bathroom t-24 or occupancy sensor. | $20,000 |
| Jul 16, 2014 | Completed final sign-off Dec 2014 | 1882 Mcallister St | remodel 4 bathrooms & two kithchen in kind. new fixtures & lighting througout both unit. (n) 5/8" sheetrock throughout both units. kitchen: min 50% kitchen lighting by h.e watt fixture. bathroom: t-24 or occupancy sensor.Details
remodel 4 bathrooms & two kithchen in kind. new fixtures & lighting througout both unit. (n) 5/8" sheetrock throughout both units. kitchen: min 50% kitchen lighting by h.e watt fixture. bathroom: t-24 or occupancy sensor. | $40,000 |
| Jun 26, 2014 | Completed final sign-off May 2015 | 425 Green St | remove (e) non-bearing wall around kitchen.Details
remove (e) non-bearing wall around kitchen. | $500 |
| Jun 13, 2014 | Completed final sign-off Oct 2014 | 179 Shawnee Av | remodel kitchen, bathroom and laundry room in kind. sheetrock garage level. no structural work. comply with cec 150 (k); kitchen: min 50% kitchen lighting watt by h.e. fixture; bathroom: h.e. or t-24 occupancy sensor.Details
remodel kitchen, bathroom and laundry room in kind. sheetrock garage level. no structural work. comply with cec 150 (k); kitchen: min 50% kitchen lighting watt by h.e. fixture; bathroom: h.e. or t-24 occupancy sensor. | $20,000 |
| Jun 13, 2014 | Completed final sign-off Jun 2015 | 3045 Mission St | remodel kitchen and bathroom in kind. new lighting and plumbing as needed. no structural work. comply with cec 150(k). all work in apt. #3. kitchen: min 50% kitchen lighting watt by h.e. fixture; bathroom: h.e. or t-24 occupancy sensor.Details
remodel kitchen and bathroom in kind. new lighting and plumbing as needed. no structural work. comply with cec 150(k). all work in apt. #3. kitchen: min 50% kitchen lighting watt by h.e. fixture; bathroom: h.e. or t-24 occupancy sensor. | $25,000 |
| May 12, 2014 | Completed final sign-off May 2015 | 421 Green St | remodel kitchen & bathroom in kind. no structural work, comply with cec 150(k). no change on walls. kitchen: min 50% of kitchen lighting h.e fixture. bathroom: h.e. or t-24 occupancy sensor.Details
remodel kitchen & bathroom in kind. no structural work, comply with cec 150(k). no change on walls. kitchen: min 50% of kitchen lighting h.e fixture. bathroom: h.e. or t-24 occupancy sensor. | $18,000 |
| May 12, 2014 | Completed final sign-off May 2015 | 425 Green St | remodel kitchen & bathroom in kind. new lighting in hallway. no structural work. comply with cec 150(k). kitchen: min 50% kitchen light watt by he. fixture. bathroom: h.e. or t-24 occupancy sensor.Details
remodel kitchen & bathroom in kind. new lighting in hallway. no structural work. comply with cec 150(k). kitchen: min 50% kitchen light watt by he. fixture. bathroom: h.e. or t-24 occupancy sensor. | $18,000 |
| Apr 11, 2014 | Completed final sign-off Nov 2014 | 1265 Washington St | remodel and relocate kitchen in units 4, 5, and 10 only. n/a maher ordinance # 155-13Details
remodel and relocate kitchen in units 4, 5, and 10 only. n/a maher ordinance # 155-13 | $21,000 |
| Apr 2, 2014 | Completed final sign-off Feb 2015 | 1308 Masonic Av | unit #3: remove non bearing wall around kitchen. remodel one kitchen and 2 bathrooms. all work in unit #3. kitchen:min 50% of kitchen light watts by h.e. fixture. bath: h.e or t-24 occupancy sensor. no windows and no doors on this permit.Details
unit #3: remove non bearing wall around kitchen. remodel one kitchen and 2 bathrooms. all work in unit #3. kitchen:min 50% of kitchen light watts by h.e. fixture. bath: h.e or t-24 occupancy sensor. no windows and no doors on this permit. | $24,000 |
| Feb 5, 2014 | Completed final sign-off Nov 2023 | 586 Clipper St | (n) 3rd story addition. extend building 7' at the rear. convert (e) crawl space & storage to (n) habitable area. remodel per plans. 1 master bedroom, 3 bedroom, 1 master bathroom, 3 bathrooms, 2 laundry rms, 2 kitchens, & 2 living rooms.Details
(n) 3rd story addition. extend building 7' at the rear. convert (e) crawl space & storage to (n) habitable area. remodel per plans. 1 master bedroom, 3 bedroom, 1 master bathroom, 3 bathrooms, 2 laundry rms, 2 kitchens, & 2 living rooms. | $90,000 |
| Feb 4, 2014 | Completed final sign-off Oct 2014 | 1125 Broderick St | extend basement back 15'2"(below grade). remodel throughout basement, 2nd & 3rd fl per plans. 2 mstr bedrm, 1 bedrm, 1 mstr bathrm, 3 bathrms, 2 kitchens, 2 living rms, 1 dining rm, 2 laundry rms, 3 stairs.Details
extend basement back 15'2"(below grade). remodel throughout basement, 2nd & 3rd fl per plans. 2 mstr bedrm, 1 bedrm, 1 mstr bathrm, 3 bathrms, 2 kitchens, 2 living rms, 1 dining rm, 2 laundry rms, 3 stairs. | $80,000 |
| Dec 13, 2013 | Completed final sign-off May 2014 | 614 Central Av | remodel (1) kitchen & (1-1/2) bathrooms in-kind. no structural work. complyl with ced 150(k). kitchen: min 50% of kitchen lighting, h.e. by watt fixture. bath: m.e. or t-24 occupancy sensor.Details
remodel (1) kitchen & (1-1/2) bathrooms in-kind. no structural work. complyl with ced 150(k). kitchen: min 50% of kitchen lighting, h.e. by watt fixture. bath: m.e. or t-24 occupancy sensor. | $15,000 |
| Dec 12, 2013 | Completed final sign-off Oct 2014 | 565 Ellis St | unit #4: remodel (1) kitchen & (1) bathrooms in-kind. no structural work. comply with ced 150(k). kitchen: min 50% of kitchen lighting, h.e. by watt fixture. bath: m.e. or t-24 occupancy sensor.Details
unit #4: remodel (1) kitchen & (1) bathrooms in-kind. no structural work. comply with ced 150(k). kitchen: min 50% of kitchen lighting, h.e. by watt fixture. bath: m.e. or t-24 occupancy sensor. | $15,000 |
| Dec 2, 2013 | Completed final sign-off Nov 2014 | 1265 Washington St | unit #10: remodel kitchen & bathroom in kind no structural work, all work in unit #10 only, kitchen minumum 50% of kitchen light watts by h.e. fixture,laundry h.e. or t-24 occupancy sensor, comply with cec150kDetails
unit #10: remodel kitchen & bathroom in kind no structural work, all work in unit #10 only, kitchen minumum 50% of kitchen light watts by h.e. fixture,laundry h.e. or t-24 occupancy sensor, comply with cec150k | $18,000 |
| Nov 15, 2013 | Completed final sign-off Jan 2017 | 513 30th St | remove all (e) lath & plaster & replace with (n) sheetrock, in bathroom and kitchen. remodel kitchen & bathrm in kindDetails
remove all (e) lath & plaster & replace with (n) sheetrock, in bathroom and kitchen. remodel kitchen & bathrm in kind | $15,000 |
| Nov 13, 2013 | Completed final sign-off Sep 2014 | 1125 Broderick St | vol. str upgrade,construct (n)fnd at gnd flr.replace (e)wd beam to (n)stl beam.add (n)shear wall at ground level ceiling.replace (e)concrete stair in kind. remodel,remove&replace (e)lath & plaster with (n)sheetrock over(n)1/2" plywd at 2 kitchens and 2 bathrooms at 2nd &3rd flr. no change of wallDetails
vol. str upgrade,construct (n)fnd at gnd flr.replace (e)wd beam to (n)stl beam.add (n)shear wall at ground level ceiling.replace (e)concrete stair in kind. remodel,remove&replace (e)lath & plaster with (n)sheetrock over(n)1/2" plywd at 2 kitchens and 2 bathrooms at 2nd &3rd flr. no change of wall | $40,000 |
| Oct 29, 2013 | Expired or cancelled expired Jul 2017 | 2833 Fillmore St | remove and replace all sheetrock and finishes in both kitchen and bath in kind, do to mold issues, replace less than 50% of exterior front stairs and railingDetails
remove and replace all sheetrock and finishes in both kitchen and bath in kind, do to mold issues, replace less than 50% of exterior front stairs and railing | $5,000 |
| Aug 19, 2013 | Completed final sign-off Jun 2015 | 3045 Mission St | unit #1-remodel kitchen & bathroom in kind. new lighting & plumbing as needed. no structural work. comply with cec 150(k)Details
unit #1-remodel kitchen & bathroom in kind. new lighting & plumbing as needed. no structural work. comply with cec 150(k) | $13,000 |
| Jul 2, 2013 | Completed final sign-off Jan 2014 | 90 Bay View St | remodel kitchen in kind. new cabinets, dish washer, garbage disposal, sinks & countertops. new lighting for kitchen area. kitchen min 50% kitchen lighting to be he watt fixture comply with cec 150(k).Details
remodel kitchen in kind. new cabinets, dish washer, garbage disposal, sinks & countertops. new lighting for kitchen area. kitchen min 50% kitchen lighting to be he watt fixture comply with cec 150(k). | $18,000 |
| Apr 16, 2013 | Never finaled issued Apr 2013, no final | 632 Steiner St | add new psl wood beam & new column at kitchen area. add new master bathroomDetails
add new psl wood beam & new column at kitchen area. add new master bathroom | $5,000 |
| Apr 10, 2013 | Completed final sign-off Dec 2013 | 632 Steiner St | remodel 1 kitchen, 2 bathrooms, and 4 bedrooms in kind. new lighting, cabinets, counter tops, sinks vanity, vanity, toilets, and bathtub. no structural work. remove 20% lath and plaster for electrical as needed. kitchen:min 50% kitchen lighting by h.e. watt fixture. bath: h.e. or t-24 occupancy.Details
remodel 1 kitchen, 2 bathrooms, and 4 bedrooms in kind. new lighting, cabinets, counter tops, sinks vanity, vanity, toilets, and bathtub. no structural work. remove 20% lath and plaster for electrical as needed. kitchen:min 50% kitchen lighting by h.e. watt fixture. bath: h.e. or t-24 occupancy. | $40,000 |
| Mar 19, 2013 | Completed final sign-off Dec 2016 | 565 Ellis St | remodel unit #8 in kind, kitchen & bathroom remodel, all new florecent lighting.Details
remodel unit #8 in kind, kitchen & bathroom remodel, all new florecent lighting. | $26,000 |
| Jan 14, 2013 | Completed final sign-off Dec 2016 | 565 Ellis St | remodel unit #15 in kind, kitchen & bathroom only, all new fluorescent lightsDetails
remodel unit #15 in kind, kitchen & bathroom only, all new fluorescent lights | $25,000 |
| Dec 31, 2012 | Completed final sign-off May 2014 | 4231 20th St | remodel 2 kitchens, all baths, new laundry room, side and rear windows. not visible from the street.Details
remodel 2 kitchens, all baths, new laundry room, side and rear windows. not visible from the street. | $32,000 |
| Dec 14, 2012 | Completed final sign-off Dec 2016 | 565 Ellis St | #16- remodel kitchen & bathroom in kind with new cabinets, vanity, toilets & fixture. no structural work, comply with cec150(k). all work in #16 only, kitchen: min. 50% of kitchen lights he by watt fixture. bath: he. or t-24 occupancy sensor.Details
#16- remodel kitchen & bathroom in kind with new cabinets, vanity, toilets & fixture. no structural work, comply with cec150(k). all work in #16 only, kitchen: min. 50% of kitchen lights he by watt fixture. bath: he. or t-24 occupancy sensor. | $15,000 |
| Dec 14, 2012 | Completed final sign-off Dec 2016 | 565 Ellis St | #9- remodel kitchen & bathroom in kind with new cabinets, vanity, toilets & fixture. no structural work, comply with cec150(k). all work in #9 only, kitchen: min. 50% of kitchen lights he by watt fixture. bath: he. or t-24 occupancy sensor.Details
#9- remodel kitchen & bathroom in kind with new cabinets, vanity, toilets & fixture. no structural work, comply with cec150(k). all work in #9 only, kitchen: min. 50% of kitchen lights he by watt fixture. bath: he. or t-24 occupancy sensor. | $15,000 |
| Nov 13, 2012 | Never finaled issued Dec 2012, no final | 2229 Divisadero St | convert (e) storage @ ground floor to (n) habitable area including (n) bathroom, (n) bedroom & (n) closet. remodel 2nd floor kitchen & living room, remodel 3rd floor kitchen in kind.Details
convert (e) storage @ ground floor to (n) habitable area including (n) bathroom, (n) bedroom & (n) closet. remodel 2nd floor kitchen & living room, remodel 3rd floor kitchen in kind. | $35,000 |
| Oct 9, 2012 | Completed final sign-off Sep 2014 | 126 Clayton St | remodel (e) unit #126. remodel (e) kitchen, bathrooms in kind. remove (e) partition w/ new. provide opening at the kitchen w/ new wood beam & posts. new skylights added.Details
remodel (e) unit #126. remodel (e) kitchen, bathrooms in kind. remove (e) partition w/ new. provide opening at the kitchen w/ new wood beam & posts. new skylights added. | $9,000 |
| Oct 5, 2012 | Completed final sign-off May 2014 | 4231 20th St | expand (e) garage at ground floor; remodel 2 bathrooms and 2 kitchen in kindDetails
expand (e) garage at ground floor; remodel 2 bathrooms and 2 kitchen in kind | $20,000 |
| Oct 4, 2012 | Never finaled issued Oct 2012, no final | 2229 Divisadero St | remodel 1st flr kitchen and 2 baths in kind, remodel 2nd flr kitchen, all new fluorescent lighting, no structural work, no change on walls and openingsDetails
remodel 1st flr kitchen and 2 baths in kind, remodel 2nd flr kitchen, all new fluorescent lighting, no structural work, no change on walls and openings | $26,000 |
| Sep 26, 2012 | Completed final sign-off Oct 2014 | 124 Clayton St | remodel extg unit 124 clayton:1)remodel extg kitchen, bathrooms in kind. remove extg stud wall, partition walls and provide with new. 2)provide opening at the kitchen with new wood beam and post. 3)provide new windows at well.Details
remodel extg unit 124 clayton:1)remodel extg kitchen, bathrooms in kind. remove extg stud wall, partition walls and provide with new. 2)provide opening at the kitchen with new wood beam and post. 3)provide new windows at well. | $9,000 |
| Sep 12, 2012 | Never finaled issued Sep 2012, no final | 106 Albion St | remodel ground floor unit (e) kitchen & bath in kind. all new fluorescent lighting throughout.Details
remodel ground floor unit (e) kitchen & bath in kind. all new fluorescent lighting throughout. | $26,000 |
| Jul 13, 2012 | Never finaled issued Jul 2012, no final | 77 Anderson St | remodel (1) kithchen, (2) bathrooms in kind. (2) new shower pan, kitchen cabinets, dishwasher, sink, garbage disposal, vanity, toilet & bath tubs. no structural work. comply with cec 150(k). kitchen minimum 50% of kitchen lighting by he watt fixture. bathroom: he or t24 occupancy sensor.Details
remodel (1) kithchen, (2) bathrooms in kind. (2) new shower pan, kitchen cabinets, dishwasher, sink, garbage disposal, vanity, toilet & bath tubs. no structural work. comply with cec 150(k). kitchen minimum 50% of kitchen lighting by he watt fixture. bathroom: he or t24 occupancy sensor. | $25,000 |
| Jul 11, 2012 | Completed final sign-off Apr 2013 | 1209 San Bruno Av | remodel bathroom and kitchen in kind.nw bathtub, vanity, toilete, cabinets, dishwasher, sinks, garbage disposal. comply with cec150(k). kitchen: min 50% of kitchen lighting by h.e. watt fixture. bathroom h.e. or t-24 occupancy sensor.Details
remodel bathroom and kitchen in kind.nw bathtub, vanity, toilete, cabinets, dishwasher, sinks, garbage disposal. comply with cec150(k). kitchen: min 50% of kitchen lighting by h.e. watt fixture. bathroom h.e. or t-24 occupancy sensor. | $35,000 |
| Jun 7, 2012 | Completed final sign-off Oct 2012 | 1690 Grove St | remodel (1) kitchen, (1) bathroom & (15) windows in kind. no structural work, lighting with cec 150 (k). "wood, hung, og lugs", kitchen: minimum 50% kitchen lighting by h.e. watt fixture, bathroom: h.e. or t-24 occupancy.Details
remodel (1) kitchen, (1) bathroom & (15) windows in kind. no structural work, lighting with cec 150 (k). "wood, hung, og lugs", kitchen: minimum 50% kitchen lighting by h.e. watt fixture, bathroom: h.e. or t-24 occupancy. | $15,000 |
| Apr 2, 2012 | Completed final sign-off Jul 2012 | 855 Waller St | work in unit 3: remodel bathroom & kitchen in kind. new cabinets, refriegerator, stove, dishwasher, garbaage disposal, countertop, sinks, toilet. kitchen: miniimum 50% of kitchen lighting by h.e. watt fixture. bath & laundry: h.e. or t-24 occupancy sensor.Details
work in unit 3: remodel bathroom & kitchen in kind. new cabinets, refriegerator, stove, dishwasher, garbaage disposal, countertop, sinks, toilet. kitchen: miniimum 50% of kitchen lighting by h.e. watt fixture. bath & laundry: h.e. or t-24 occupancy sensor. | $15,000 |
| Mar 16, 2012 | Completed final sign-off Aug 2012 | 1200 Gough St | remodel kitchen & 2 bathrooms, new vanity & tiles. new light fixtures, install new hardwood floors; comply with cec 150(k0 8 & 11 reconnect (e) exhaust duct to new fanDetails
remodel kitchen & 2 bathrooms, new vanity & tiles. new light fixtures, install new hardwood floors; comply with cec 150(k0 8 & 11 reconnect (e) exhaust duct to new fan | $20,000 |
| Feb 1, 2012 | Completed final sign-off Jun 2016 | 1834 Mason St | to comply w/nov 201284155 -convert (e) storage @ g/f to (n) habitable area include 1 full bath, 2 bedrm w/closet for unit #1834 & 1 full bath, 1 bedrm w/closet & 1 study rm for unit #1834a. remodel kitchens,baths & laundry rm for all units.fire sprinkler on separate permit. replace lath/plasterDetails
to comply w/nov 201284155 -convert (e) storage @ g/f to (n) habitable area include 1 full bath, 2 bedrm w/closet for unit #1834 & 1 full bath, 1 bedrm w/closet & 1 study rm for unit #1834a. remodel kitchens,baths & laundry rm for all units.fire sprinkler on separate permit. replace lath/plaster | $45,000 |