Back to kitchen remodel contractors
Rinaldi Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Sep 2026
- Last 24 months
- 25 permits filed
420 permits since 2000: 327 completed, 13 in progress, 39 never finaled, 41 expired or cancelled.
Of the 39 never-finaled permits, 2 are 3 to 5 years old, 12 are 5 to 10 years old, 25 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
113 kitchen remodel permits: 93 completed, 2 in progress, 9 never finaled, 9 expired or cancelled. Typically 0 days from filing to permit and 152 days from permit to final inspection.
Showing the 100 most recent of 113.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 7, 2026 | In progress issued Jul 2026 | 219 14th Av | remodel (e) kitchen in kind; replace cabinets, countertops, & appliances. remodel (e) half-bath next to kitchen in kind. all in kind. no change to floor layout. no change to wall layout. no structural work.Details
remodel (e) kitchen in kind; replace cabinets, countertops, & appliances. remodel (e) half-bath next to kitchen in kind. all in kind. no change to floor layout. no change to wall layout. no structural work. | $45,000 |
| Nov 26, 2025 | Completed final sign-off Feb 2026 | 737 18th Av | full kitchen remodel in kind. laundry room.no structural workDetails
full kitchen remodel in kind. laundry room.no structural work | $40,000 |
| Aug 13, 2025 | Completed final sign-off Feb 2026 | 2334 North Point St | lower unit: kitchen remodel, bathroom remodel, remodel e) powder rm into a laundry closet, remodel e) laundry closet & adjacent bedroom cloest into a full bathroom, provide a new gas insert applicance fireplace in the e) fireplace openingDetails
lower unit: kitchen remodel, bathroom remodel, remodel e) powder rm into a laundry closet, remodel e) laundry closet & adjacent bedroom cloest into a full bathroom, provide a new gas insert applicance fireplace in the e) fireplace opening | $83,000 |
| Jul 24, 2024 | Completed final sign-off Dec 2024 | 279 14th Av | one kitchen remodel in kind. replacing existing cabinets w/ new cabinets & countertop, applicances, and sink (non-structural)Details
one kitchen remodel in kind. replacing existing cabinets w/ new cabinets & countertop, applicances, and sink (non-structural) | $28,000 |
| Dec 22, 2023 | In progress issued Aug 2024 | 3950 20th St | interior renovation of kitchen and bathrooms. repair and replace noted windows. replace rear yard doors addition of light tube. no work done to front facade. new mechanical system to be design build under sep permit.Details
interior renovation of kitchen and bathrooms. repair and replace noted windows. replace rear yard doors addition of light tube. no work done to front facade. new mechanical system to be design build under sep permit. | $125,000 |
| Mar 16, 2023 | Completed final sign-off Apr 2024 | 1900 Lane St | 2/f: convert (e) dining into new kitchen. install new bath in (e) bedroom at rear. rehabilitate (e) bathroom. convert (e) kitchen to new bedroom. relocate (e) laundry to (e) garage. absorb lightwell space, no change to sq. footage. g/f: install 1 hr fire rated wall b/t garage and new habitableDetails
2/f: convert (e) dining into new kitchen. install new bath in (e) bedroom at rear. rehabilitate (e) bathroom. convert (e) kitchen to new bedroom. relocate (e) laundry to (e) garage. absorb lightwell space, no change to sq. footage. g/f: install 1 hr fire rated wall b/t garage and new habitable | $100,000 |
| Mar 10, 2023 | Completed final sign-off Jan 2024 | 1035 Union St | kitchen remodel- no structural- 1039 union- new appliances- flooring paintingDetails
kitchen remodel- no structural- 1039 union- new appliances- flooring painting | $20,000 |
| Aug 11, 2022 | Completed final sign-off Jul 2023 | 491 Buena Vista East Av | remodel (1) kitchen and (2) full bathrooms. non structural.Details
remodel (1) kitchen and (2) full bathrooms. non structural. | $70,000 |
| Aug 1, 2022 | Expired or cancelled expired Dec 2025 | 74 Gladys St | kitchen and bathroom renovation in kind.Details
kitchen and bathroom renovation in kind. | $30,000 |
| Jul 5, 2022 | Completed final sign-off Oct 2022 | 6 Niagara Av | remodel (e) kitchen & full bathroom.Details
remodel (e) kitchen & full bathroom. | $40,000 |
| Jan 31, 2022 | Completed final sign-off Nov 2022 | 1113 York St | remodel kitchen & breakfast room at 3rd floor remodel bathroom at 3rd fl. replacement of rear windows and french door. replace electrical panel.Details
remodel kitchen & breakfast room at 3rd floor remodel bathroom at 3rd fl. replacement of rear windows and french door. replace electrical panel. | $60,000 |
| May 26, 2021 | Never finaled issued May 2021, no final | 758 Clayton St | kitchen remodel, 2 bathrooms replace heater in kindDetails
kitchen remodel, 2 bathrooms replace heater in kind | $34,000 |
| May 12, 2021 | Completed final sign-off Mar 2022 | 69 Joost Av | kitchen and bathroom remodel in-kind.Details
kitchen and bathroom remodel in-kind. | $25,000 |
| Jan 29, 2021 | Completed final sign-off May 2022 | 2710 Baker St | #5: non structural interior remodel extg bath on 4th floor. 3rd floor: remodel kitchen- remove fireplace replace furnace and install laundry.Details
#5: non structural interior remodel extg bath on 4th floor. 3rd floor: remodel kitchen- remove fireplace replace furnace and install laundry. | $50,000 |
| Dec 10, 2020 | Completed final sign-off Apr 2023 | 1050 North Point St | unit 209: remodel kitchen and bathroom. new lighting and finishes thru out. mep permitted separatelyDetails
unit 209: remodel kitchen and bathroom. new lighting and finishes thru out. mep permitted separately | $50,000 |
| Sep 29, 2020 | Completed final sign-off Sep 2021 | 239 Brannan St | kitchen and full bathroom remodelingDetails
kitchen and full bathroom remodeling | $40,000 |
| Sep 22, 2020 | Completed final sign-off Feb 2021 | 2454 Francisco St | kitchen renovationDetails
kitchen renovation | $30,000 |
| May 27, 2020 | Completed final sign-off Oct 2021 | 14 Knott Ct | remodel existing kitchen, 3 bathrooms. all remodel work in-kind.Details
remodel existing kitchen, 3 bathrooms. all remodel work in-kind. | |
| Aug 12, 2019 | Completed final sign-off Nov 2019 | 230 Justin Dr | revision to permit #201812289331, rebuild interior stairs and bathroom, kitchen layout.Details
revision to permit #201812289331, rebuild interior stairs and bathroom, kitchen layout. | $1,000 |
| Mar 15, 2019 | Completed final sign-off May 2019 | 29 Ramona Av | unit #5: remodel kitchen and bathroom in kind. remove all lathe and plaster from entire apt and install new 5/8 board throughout after insulationg ext. walls. repair in kind.Details
unit #5: remodel kitchen and bathroom in kind. remove all lathe and plaster from entire apt and install new 5/8 board throughout after insulationg ext. walls. repair in kind. | $50,000 |
| Mar 14, 2019 | Completed final sign-off Oct 2019 | 630 Lyon St | remodel (e) kitchen. remove (e) window & infill opening on north elevation. replace (e) window at east.replace (e) window sash at dining rm (side light well). convert mud rm into conditioned playrm. remove windows at south wall & add (n) windows & (n) patio door. cap gas lines at fp. (n) tankless whDetails
remodel (e) kitchen. remove (e) window & infill opening on north elevation. replace (e) window at east.replace (e) window sash at dining rm (side light well). convert mud rm into conditioned playrm. remove windows at south wall & add (n) windows & (n) patio door. cap gas lines at fp. (n) tankless wh | $26,000 |
| Jan 24, 2019 | Never finaled issued Feb 2019, no final | 479 Steiner St | 479 unit #7: add 1 full bath at penthouse 499 unit #7 add kitchen and remodel 1 full bathDetails
479 unit #7: add 1 full bath at penthouse 499 unit #7 add kitchen and remodel 1 full bath | $30,000 |
| Jan 11, 2019 | Never finaled issued Jan 2019, no final | 479 Steiner St | unit #6: remodel kitchen and bathDetails
unit #6: remodel kitchen and bath | $30,000 |
| Oct 5, 2018 | Completed final sign-off Jan 2019 | 149 07th Av | kitchen and bathroom remodel. replace cabinets, counters, appliances, vanity, toilet, remove tub, add shower. no structural work.Details
kitchen and bathroom remodel. replace cabinets, counters, appliances, vanity, toilet, remove tub, add shower. no structural work. | $30,000 |
| Aug 2, 2018 | Completed final sign-off Mar 2019 | 66 Cleary Ct | unit #905: remodel extg kitchen and 2 bathrooms in same locations.Details
unit #905: remodel extg kitchen and 2 bathrooms in same locations. | $55,000 |
| Dec 22, 2016 | Completed final sign-off May 2017 | 730 San Bruno Av | complete remodel of kitchen: new cabinets, apliances & countertop. no structural work.Details
complete remodel of kitchen: new cabinets, apliances & countertop. no structural work. | $18,000 |
| Jul 7, 2016 | Completed final sign-off Jan 2017 | 407 Crestmont Dr | remodel (e) kitchen, remove wall between kitchen & dining room. new gas appliance fireplace in the living room, relocate washer/dryer to 3rd floor. replace hot water tank with new tankless hot waterDetails
remodel (e) kitchen, remove wall between kitchen & dining room. new gas appliance fireplace in the living room, relocate washer/dryer to 3rd floor. replace hot water tank with new tankless hot water | $25,000 |
| May 20, 2016 | Completed final sign-off Dec 2016 | 658 42nd Av | demo existing 1/2 bath under stairs, remodel of kitchen & bathroom on 2nd floor. addition of bathroom to 2nd floor and 1st floorDetails
demo existing 1/2 bath under stairs, remodel of kitchen & bathroom on 2nd floor. addition of bathroom to 2nd floor and 1st floor | $40,000 |
| Feb 9, 2016 | Completed final sign-off Apr 2016 | 122 Carl St | work in unit #4: remodel one full bathroom. replace toilet, vanity and shower with new. install dishwasher and disposal in kitchen.Details
work in unit #4: remodel one full bathroom. replace toilet, vanity and shower with new. install dishwasher and disposal in kitchen. | $10,000 |
| Jul 14, 2015 | Completed final sign-off Jun 2016 | 2151 California St | remodel existing bath in unit #2. remodel existing kitchen and bath in units #3 and #6. no structural work. no change to wall and layout. all work in kind.Details
remodel existing bath in unit #2. remodel existing kitchen and bath in units #3 and #6. no structural work. no change to wall and layout. all work in kind. | $48,000 |
| Jul 1, 2015 | Completed final sign-off Mar 2016 | 106 Justin Dr | remodel of the 1st flr to include a new bedroom with closet,new bathrm with new window,new living room,relocate furnace,remodel of the 2nd flr to include kitchen/diningrm/living rm,hall bathroom & hallway,enlarge windows & replace all windows & doors.Details
remodel of the 1st flr to include a new bedroom with closet,new bathrm with new window,new living room,relocate furnace,remodel of the 2nd flr to include kitchen/diningrm/living rm,hall bathroom & hallway,enlarge windows & replace all windows & doors. | $100,000 |
| Jun 12, 2015 | Completed final sign-off May 2021 | 253 Pixley St | third flr addition, building ht. increase of 7'-6". 4'-0" horizontal addition at front of house. relocation of kitchen to third flr. addition of 2 1/2 bathrooms and addition of 2 bedrooms.Details
third flr addition, building ht. increase of 7'-6". 4'-0" horizontal addition at front of house. relocation of kitchen to third flr. addition of 2 1/2 bathrooms and addition of 2 bedrooms. | $500,000 |
| Jun 5, 2015 | Completed final sign-off Feb 2016 | 455 Melrose Av | remodel (e) kitchen - no structural. remove cabinets / counter. install new cabinet & counter top.Details
remodel (e) kitchen - no structural. remove cabinets / counter. install new cabinet & counter top. | $12,000 |
| Apr 8, 2015 | Completed final sign-off Jan 2016 | 925 Quintara St | remodel existing kitchen, replace 2 existing windows in kind, not visable from street, repair dry rot damage in center patio in kind.Details
remodel existing kitchen, replace 2 existing windows in kind, not visable from street, repair dry rot damage in center patio in kind. | $18,000 |
| Mar 26, 2015 | Never finaled issued Mar 2015, no final | 3921 24th St | replace kitchen cabinet & countertops. no walls to be removed/no structural.Details
replace kitchen cabinet & countertops. no walls to be removed/no structural. | $10,000 |
| Jul 31, 2014 | Completed final sign-off Aug 2015 | 1317 Grove St | work at 1317 grove st only. add a new bathroom, remodel an existing bathroom and remodel an (e) kitchen.Details
work at 1317 grove st only. add a new bathroom, remodel an existing bathroom and remodel an (e) kitchen. | $65,000 |
| Jul 11, 2014 | Completed final sign-off Aug 2014 | 3225 23rd St | unit #2 - partial kitchen remodel - replace 4 (e) cabinets and counter top 4' long. for unit #2 only - no changes to doors or windows,no structuralDetails
unit #2 - partial kitchen remodel - replace 4 (e) cabinets and counter top 4' long. for unit #2 only - no changes to doors or windows,no structural | $5,000 |
| Jun 9, 2014 | Completed final sign-off Jul 2015 | 1319 Grove St | work to be performed at 1319 grove street only- to add a new bathroom, remodel an existing bathroom & remodel an existing kitchen.Details
work to be performed at 1319 grove street only- to add a new bathroom, remodel an existing bathroom & remodel an existing kitchen. | $65,000 |
| May 12, 2014 | Completed final sign-off Aug 2014 | 1515 Noe St | remodel one kitchen, new cabinets & counters. remodel one bathroom, new toilet, shower, vanity. no structural.Details
remodel one kitchen, new cabinets & counters. remodel one bathroom, new toilet, shower, vanity. no structural. | $40,000 |
| Mar 24, 2014 | Completed final sign-off Jun 2014 | 1101 Green St | partial remodel in kitchen. install new washing machine and move (e) frig. to create space. partial bathroom remodel: remove jacuzzi tub and replace with custom japanese soaking tub. all existing cabinets to remain. no walls moved, removed or added, all fixture layout to remain unchanged.Details
partial remodel in kitchen. install new washing machine and move (e) frig. to create space. partial bathroom remodel: remove jacuzzi tub and replace with custom japanese soaking tub. all existing cabinets to remain. no walls moved, removed or added, all fixture layout to remain unchanged. | $5,000 |
| Feb 7, 2014 | Never finaled issued Feb 2014, no final | 275 Burnett Av | unit 4 - partial kitchen remodel - replace lower cabinets with new countertop and sink. to comply with cec150(k) 8Details
unit 4 - partial kitchen remodel - replace lower cabinets with new countertop and sink. to comply with cec150(k) 8 | $3,000 |
| Oct 16, 2013 | Completed final sign-off Feb 2014 | 124 Carl St | unit b - partial kitchen remodel - replace lower cabinets only with new; bathroom remodel - replace shower stall, vanity & toilet; no structural. to comply with cec150(k) 8 & 10.Details
unit b - partial kitchen remodel - replace lower cabinets only with new; bathroom remodel - replace shower stall, vanity & toilet; no structural. to comply with cec150(k) 8 & 10. | $15,000 |
| Jul 15, 2013 | Never finaled issued Jul 2013, no final | 1319 Grove St | remodel existing kitchen and bathroom, repair dry rot damage to center porchDetails
remodel existing kitchen and bathroom, repair dry rot damage to center porch | $38,000 |
| Jul 15, 2013 | Completed final sign-off Sep 2013 | 122 Carl St | unit #5: partial remodel of kitchen, remove only lower cabinets & replace, no structuralDetails
unit #5: partial remodel of kitchen, remove only lower cabinets & replace, no structural | $8,000 |
| Jul 9, 2013 | Completed final sign-off Aug 2013 | 728 20th St | install a 7' x 3'6" stainless steel (ss) type i hood for preschool prep. kitchen. provide (n) deep fryer and (n) 8 burner.Details
install a 7' x 3'6" stainless steel (ss) type i hood for preschool prep. kitchen. provide (n) deep fryer and (n) 8 burner. | $5,000 |
| May 20, 2013 | Completed final sign-off Dec 2015 | 384 11th Av | change of use from dental office to single family residential. at 2nd floor - demolish non-structural partition at (e) sterilization room & remove interior glazing & partition below glazing at (e) waiting room. add kitchen and one bath. provide stair enclosure.Details
change of use from dental office to single family residential. at 2nd floor - demolish non-structural partition at (e) sterilization room & remove interior glazing & partition below glazing at (e) waiting room. add kitchen and one bath. provide stair enclosure. | $8,000 |
| Mar 29, 2013 | Completed final sign-off May 2013 | 3788 Mission St | kitchen remodel. remove cabinets counter and install new . no lighting changesDetails
kitchen remodel. remove cabinets counter and install new . no lighting changes | $12,000 |
| Mar 25, 2013 | Completed final sign-off Jun 2014 | 66 Parker Av | demolition of 2 bathrooms and kitchen and remodel each.Details
demolition of 2 bathrooms and kitchen and remodel each. | $28,000 |
| Feb 11, 2013 | Completed final sign-off Sep 2013 | 122 Carl St | replace 1 kitchen window in lightwell, no structural work, u value c.4Details
replace 1 kitchen window in lightwell, no structural work, u value c.4 | $350 |
| Jan 16, 2013 | Completed final sign-off Jul 2013 | 1880 Jackson St | unit #304:remodel extg kitchen (no structural work), refinish hardwood flooring, new stone surround at extg fireplace. replace exiting wood windows, not visible from street.Details
unit #304:remodel extg kitchen (no structural work), refinish hardwood flooring, new stone surround at extg fireplace. replace exiting wood windows, not visible from street. | $25,000 |
| Sep 14, 2012 | Completed final sign-off Aug 2013 | 3567 17th St | kitchen remodel (no structural ) remove/replace kitchen cabinets & counterDetails
kitchen remodel (no structural ) remove/replace kitchen cabinets & counter | $9,300 |
| Sep 14, 2012 | Completed final sign-off Sep 2013 | 122 Carl St | #2- kitchen remodel.Details
#2- kitchen remodel. | $15,000 |
| Aug 6, 2012 | Completed final sign-off Oct 2012 | 85 Richland Av | kitchen & bathroom remodel. remove cabinets, counters & replace with new. install appliances & fixtures.Details
kitchen & bathroom remodel. remove cabinets, counters & replace with new. install appliances & fixtures. | $20,000 |
| May 23, 2011 | Completed final sign-off Aug 2011 | 114 Moffitt St | kitchen remodel- remove cabinets, counter and replace with new. re-use existing appliances in same location. lighting changes m ust be comply with cec 150(k)Details
kitchen remodel- remove cabinets, counter and replace with new. re-use existing appliances in same location. lighting changes m ust be comply with cec 150(k) | $8,000 |
| Apr 27, 2010 | Completed final sign-off Oct 2011 | 791 Dolores St | move (e) kitchen from east end of flat to west end, replace (e) kitchen area w/ master bathrm. & closet, add laundry hall closet, minor work to (e) hall bath. add a private roof deck (250 sq.ft.) accessible by a new spiral stair.Details
move (e) kitchen from east end of flat to west end, replace (e) kitchen area w/ master bathrm. & closet, add laundry hall closet, minor work to (e) hall bath. add a private roof deck (250 sq.ft.) accessible by a new spiral stair. | $98,000 |
| Apr 21, 2010 | Completed final sign-off Jul 2010 | 791 Dolores St | kitchen remodel;remove 4 base cabinets and 3 wall cabinets.replace with new cbnts & countertops.atleast 50% high efficacy lighting. no window and no door and no new wall work on this permit. kitchen window work ok for this permit.Details
kitchen remodel;remove 4 base cabinets and 3 wall cabinets.replace with new cbnts & countertops.atleast 50% high efficacy lighting. no window and no door and no new wall work on this permit. kitchen window work ok for this permit. | $12,000 |
| Apr 5, 2010 | Never finaled issued Apr 2010, no final | 57 John St | job location: 57 john street: remodel kitchen (7ft. of cabinetry only) and repair dry-rot damage @ back porch walls. work to be done in 57 john street.Details
job location: 57 john street: remodel kitchen (7ft. of cabinetry only) and repair dry-rot damage @ back porch walls. work to be done in 57 john street. | $15,000 |
| Dec 18, 2009 | Expired or cancelled expired Apr 2018 | 223 14th Av | one -story horizontal rear addition at ground level for new /second residential unit with rood deck above. work to include remodelling of (e) kitchen and family roomDetails
one -story horizontal rear addition at ground level for new /second residential unit with rood deck above. work to include remodelling of (e) kitchen and family room | $105,000 |
| Nov 18, 2009 | Completed final sign-off Feb 2010 | 4655 25th St | remodel extg kitchen and instal new shower in place of tub in bathroom. replace vanity cabinet at new unit.Details
remodel extg kitchen and instal new shower in place of tub in bathroom. replace vanity cabinet at new unit. | $19,000 |
| Sep 4, 2009 | Completed final sign-off Dec 2009 | 3983 Cesar Chavez St | work @ unit# 2 only. kitchen remodel. remove cabinets, counter & replace in kind. area approx 10' x 10'. bathroom remodel. remove tub, vanity, toilet. replace in kind. no structural work. area approx 5' x 8'. repair dry rot damage @ base of 2 windows @ rear of building. no structural.Details
work @ unit# 2 only. kitchen remodel. remove cabinets, counter & replace in kind. area approx 10' x 10'. bathroom remodel. remove tub, vanity, toilet. replace in kind. no structural work. area approx 5' x 8'. repair dry rot damage @ base of 2 windows @ rear of building. no structural. | $23,000 |
| Jun 25, 2009 | Completed final sign-off Jan 2012 | 324 Caselli Av | addition and remodel. gr fl: new tanden parking space, new guest room, family room, music room, bath. 2nd fl: remodel kitchen, new laundry room, powder room. stair to gr level and 3rd fl. 3rd fl: new master bedroom suite, new bedroom, bath, furnace, water heater and facade at frontDetails
addition and remodel. gr fl: new tanden parking space, new guest room, family room, music room, bath. 2nd fl: remodel kitchen, new laundry room, powder room. stair to gr level and 3rd fl. 3rd fl: new master bedroom suite, new bedroom, bath, furnace, water heater and facade at front | $350,000 |
| Jun 16, 2009 | Completed final sign-off Jul 2010 | 1530 12th Av | addition at 1st flr level of 38 sq ft & 24 sq ft to the northeast & southeast corners (rear of building). relocate bathroom at 1st level to northeast corner, replace (e) bathroom location with powder room & laundry room. remodel the (e) kitchen, add deck at 1st floor level at rearDetails
addition at 1st flr level of 38 sq ft & 24 sq ft to the northeast & southeast corners (rear of building). relocate bathroom at 1st level to northeast corner, replace (e) bathroom location with powder room & laundry room. remodel the (e) kitchen, add deck at 1st floor level at rear | $90,000 |
| Nov 4, 2008 | Completed final sign-off Feb 2009 | 1323 11th Av | work @ unit# 1323 only. kitchen remodel. remove existing cabinets. counter & replace with new. partial bathroom remodel. retile floors, install new toilet. no structural work.Details
work @ unit# 1323 only. kitchen remodel. remove existing cabinets. counter & replace with new. partial bathroom remodel. retile floors, install new toilet. no structural work. | $20,000 |
| Oct 6, 2008 | Completed final sign-off May 2009 | 1450 Shrader St | kitchen remodel-close 1 door, open 1 door, under mount cabinet flourscent lights, counter repairDetails
kitchen remodel-close 1 door, open 1 door, under mount cabinet flourscent lights, counter repair | $4,200 |
| Sep 15, 2008 | Completed final sign-off Nov 2008 | 166 Molimo Dr | remove existing kitchen cabinets/counter & replace with new cabinets & counter. no structural.Details
remove existing kitchen cabinets/counter & replace with new cabinets & counter. no structural. | $16,000 |
| Jul 25, 2008 | Completed final sign-off Apr 2009 | 770 03rd Av | add bedroom, family room, bathroom & sliding door & laundry at ground floor. remodel kitchen @ 2nd floor, remove bathroom & add new bath at 3rd floor and 2 new store closets at garage area.Details
add bedroom, family room, bathroom & sliding door & laundry at ground floor. remodel kitchen @ 2nd floor, remove bathroom & add new bath at 3rd floor and 2 new store closets at garage area. | $55,000 |
| Jun 27, 2008 | Completed final sign-off Aug 2008 | 2110 Pine St | unit b: remove & patch old wall furnace opening, replace furnace in basement, same location, unit a: remove kitchen counter top & replace with new reset sink and dishwasher, replace furnace in basement; per 3r #4959Details
unit b: remove & patch old wall furnace opening, replace furnace in basement, same location, unit a: remove kitchen counter top & replace with new reset sink and dishwasher, replace furnace in basement; per 3r #4959 | $5,500 |
| Apr 14, 2008 | Completed final sign-off Feb 2009 | 543 17th Av | remodel existing kitchen/replace cabinets/counter. remodel existing full bathroom. replace tub/toilet/vanity. remove lathe and plaster on ceilings throughout the unit to remove lights/switches. insulate & sheetrock w/ 5/8" fire rated rock.Details
remodel existing kitchen/replace cabinets/counter. remodel existing full bathroom. replace tub/toilet/vanity. remove lathe and plaster on ceilings throughout the unit to remove lights/switches. insulate & sheetrock w/ 5/8" fire rated rock. | $30,000 |
| Dec 5, 2007 | Completed final sign-off Mar 2008 | 133 Buena Vista Tr | kitchen remodel-replace existing cabinets/counter. no structural.Details
kitchen remodel-replace existing cabinets/counter. no structural. | $10,000 |
| Jun 29, 2007 | Completed final sign-off Dec 2007 | 450 34th Av | interior non structural renovation to include kitchen, laundry and two bathrooms.Details
interior non structural renovation to include kitchen, laundry and two bathrooms. | $55,000 |
| Jun 18, 2007 | Completed final sign-off Oct 2007 | 54 Lapidge St | replacing kitchen cabinets, flooring, counter tops, lighting and appliances. at least 50% lighting wattage must be flourscent. r-13 minimum insulation for walls, r-19 min. for ceiling. exhaust terminatiion 3' min from p.l. and building opening.Details
replacing kitchen cabinets, flooring, counter tops, lighting and appliances. at least 50% lighting wattage must be flourscent. r-13 minimum insulation for walls, r-19 min. for ceiling. exhaust terminatiion 3' min from p.l. and building opening. | $25,000 |
| Feb 8, 2007 | Completed final sign-off Aug 2007 | 5426 Fulton St | kitchen remodeling/bedroom remodel. 1/2 bath remodel, convert to full bath. see plans-no structural.Details
kitchen remodeling/bedroom remodel. 1/2 bath remodel, convert to full bath. see plans-no structural. | $25,000 |
| Jan 18, 2007 | Completed final sign-off Apr 2007 | 1542 44th Av | kitchen remodel, remove cabinets w/ new cabinets counter/appliances.Details
kitchen remodel, remove cabinets w/ new cabinets counter/appliances. | $14,000 |
| Jun 21, 2006 | Expired or cancelled expired Aug 2007 | 770 16th Av | remodel (1) kitchen and (1)bath, add (1) new master bathroom per plansDetails
remodel (1) kitchen and (1)bath, add (1) new master bathroom per plans | $25,000 |
| Jun 1, 2006 | Completed final sign-off Aug 2006 | 62 Stratford Dr | kitchen remodel-remove cabinets/counter & replace w/new cabinets & counter /no structural. no change to window.Details
kitchen remodel-remove cabinets/counter & replace w/new cabinets & counter /no structural. no change to window. | $10,500 |
| May 5, 2006 | Completed final sign-off Aug 2006 | 25 Turquoise Wy | kitchen remodel -remove cabinets & counter . replace w/new cabinets & counter. no structural.Details
kitchen remodel -remove cabinets & counter . replace w/new cabinets & counter. no structural. | $10,000 |
| Feb 22, 2006 | Completed final sign-off May 2006 | 108 Stanyan St | remodel kitchen, cabinets, county top & floor.Details
remodel kitchen, cabinets, county top & floor. | $12,000 |
| Dec 6, 2005 | Expired or cancelled expired Mar 2009 | 689 Douglass St | redo kitchen reface cabinets, new countersDetails
redo kitchen reface cabinets, new counters | $4,000 |
| Oct 12, 2005 | Completed final sign-off Nov 2005 | 3925 24th St | remove rotten siding/french door & 2 2-0" 4'-0" windows wooden and replace w/new at back of property. replace countertop in kitchen w/new stone top. sink will not be replaced - existing under mount no structuralDetails
remove rotten siding/french door & 2 2-0" 4'-0" windows wooden and replace w/new at back of property. replace countertop in kitchen w/new stone top. sink will not be replaced - existing under mount no structural | $4,000 |
| Oct 6, 2005 | Completed final sign-off Jan 2006 | 1670 Clay St | remove kitchen cabinets to access leaking gas line, replace cabinet. no lightingDetails
remove kitchen cabinets to access leaking gas line, replace cabinet. no lighting | $1,000 |
| Oct 6, 2005 | Completed final sign-off Mar 2006 | 135 Buena Vista Tr | kitchen remodel, remove cabinets,counter. replace with new. no structural.Details
kitchen remodel, remove cabinets,counter. replace with new. no structural. | $10,000 |
| Sep 20, 2005 | Completed final sign-off Dec 2005 | 326 Steiner St | partial kitchen remodel.remove sinkcabinet,corner cabinets. replace w/new cabinets and sinkDetails
partial kitchen remodel.remove sinkcabinet,corner cabinets. replace w/new cabinets and sink | $3,000 |
| Aug 12, 2005 | Completed final sign-off May 2006 | 7032 Fulton St | kitchen/bathroom remodel main level-construct new master bedrm&bathrm at garage level.w/sprial......Details
kitchen/bathroom remodel main level-construct new master bedrm&bathrm at garage level.w/sprial...... | $75,000 |
| Jul 5, 2005 | Expired or cancelled expired May 2006 | 7034 Fulton St | remodel 1 bathroom-new toilet,vanity,tub(same location).remodel kitchen-remove/replace cabinets,Details
remodel 1 bathroom-new toilet,vanity,tub(same location).remodel kitchen-remove/replace cabinets, | $19,000 |
| Jun 1, 2005 | Completed final sign-off Aug 2005 | 70 Woodhaven Ct | kitchen remodel - new cabinets/counter & appliances. no structural.Details
kitchen remodel - new cabinets/counter & appliances. no structural. | $8,000 |
| May 18, 2005 | Completed final sign-off Aug 2005 | 1 Daniel Burnham Ct | parital kitchen remodel, remove cabinets,replace with new, new sink and stove. no structuralDetails
parital kitchen remodel, remove cabinets,replace with new, new sink and stove. no structural | $5,000 |
| Mar 30, 2005 | Completed final sign-off Apr 2005 | 452 Pacheco St | remove illegal kitchen in basement , stove & refrigerator,legalize bastment room install address #Details
remove illegal kitchen in basement , stove & refrigerator,legalize bastment room install address # | $91,900 |
| Nov 24, 2004 | Completed final sign-off Mar 2005 | 70 Parker Av | change of laundry rm location from kitchen to garage level.Details
change of laundry rm location from kitchen to garage level. | |
| Aug 12, 2004 | Completed final sign-off Mar 2005 | 70 Parker Av | remodel kitchen and two bathrooms, see plansDetails
remodel kitchen and two bathrooms, see plans | $38,000 |
| Jun 25, 2004 | Expired or cancelled expired Jan 2006 | 2072 Jackson St | install new counters & sink in kitchen,run new gas line to stove,remove lath/plaster ceiling in 2Details
install new counters & sink in kitchen,run new gas line to stove,remove lath/plaster ceiling in 2 | $6,000 |
| Jun 3, 2004 | Completed final sign-off Feb 2005 | 225 Valley St | remodel 2 kitchens 4 bath per plans see plans. (no structural)Details
remodel 2 kitchens 4 bath per plans see plans. (no structural) | $95,000 |
| May 19, 2004 | Completed final sign-off Oct 2004 | 110 Stanyan St | kitchen remodel replace cabinets couter w/new appliances & flooringDetails
kitchen remodel replace cabinets couter w/new appliances & flooring | $9,000 |
| May 14, 2004 | Completed final sign-off Nov 2004 | 2368 21st Av | remodel kitchen - remove cabs/counter & appliances, install new cabs/counter-bathroom replace toiletDetails
remodel kitchen - remove cabs/counter & appliances, install new cabs/counter-bathroom replace toilet | $9,000 |
| Feb 23, 2004 | Completed final sign-off Apr 2004 | 2110 Pine St | replace cabinets and appliances in kitchen work in unit #2440aDetails
replace cabinets and appliances in kitchen work in unit #2440a | $6,000 |
| Feb 5, 2004 | Completed final sign-off Sep 2004 | 651 Teresita Bl | kitchen remodel, remove cabinets/counter and applicances. replace w new. replace 2 exist windows w/Details
kitchen remodel, remove cabinets/counter and applicances. replace w new. replace 2 exist windows w/ | $28,000 |
| Dec 3, 2003 | Completed final sign-off Jun 2004 | 1247 46th Av | remodel kitchen,remove (e)cabinets/counter/linoleum,replace w/new cabinets/counter/flooring.no strucDetails
remodel kitchen,remove (e)cabinets/counter/linoleum,replace w/new cabinets/counter/flooring.no struc | $10,000 |
| Aug 4, 2003 | Completed final sign-off Oct 2003 | 2070 Jackson St | remodel one full bathroom, install new can lights in hallway & kitchenDetails
remodel one full bathroom, install new can lights in hallway & kitchen | $10,000 |
| Jul 14, 2003 | Completed final sign-off Oct 2003 | 130 Theresa St | kitchen remodel, remove cabs/counter, replace w/new cabs/counter. new sheetrock/insulation. no strucDetails
kitchen remodel, remove cabs/counter, replace w/new cabs/counter. new sheetrock/insulation. no struc | $9,000 |
| Jun 2, 2003 | Completed final sign-off Feb 2004 | 1170 Sacramento St | interior remodelling, consisting of new stone tile flooring, new kitchen cabinets, counters & appliaDetails
interior remodelling, consisting of new stone tile flooring, new kitchen cabinets, counters & applia | $105,000 |
| Jan 24, 2003 | Completed final sign-off Apr 2003 | 1507 33rd Av | demolish ex kitchen and breakfast room, remove non bearing partiion wall btwn kitch/brkfst rm. moveDetails
demolish ex kitchen and breakfast room, remove non bearing partiion wall btwn kitch/brkfst rm. move | $15,000 |