Rinaldi Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Sep 2026
- Last 24 months
- 25 permits filed
420 permits since 2000: 327 completed, 13 in progress, 39 never finaled, 41 expired or cancelled.
Of the 39 never-finaled permits, 2 are 3 to 5 years old, 12 are 5 to 10 years old, 25 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Roof deck permits
6 roof deck permits: 5 completed, 1 expired or cancelled. Typically 268 days from filing to permit and 258 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 22, 2019 | Completed final sign-off Oct 2023 | 101 Landers St | to comply w/ nov #201932231 & #201932221. revision to permit #201411202125. new roof deck on detached garage w/ 42 inch guardrails. add and replace stair run. add 1 hour rated wall at stair & lanudry.Details
to comply w/ nov #201932231 & #201932221. revision to permit #201411202125. new roof deck on detached garage w/ 42 inch guardrails. add and replace stair run. add 1 hour rated wall at stair & lanudry. | $18,000 |
| Dec 21, 2015 | Completed final sign-off Nov 2018 | 2446 16th Av | add floor area to (e) 3rd fl master bedroom suite. work includes bathroom remodel & (n) roof deck. interior remodel of (e) 2nd fl bathrm, add (n) window to rear facade @ (e) 2nd fl bedrm.Details
add floor area to (e) 3rd fl master bedroom suite. work includes bathroom remodel & (n) roof deck. interior remodel of (e) 2nd fl bathrm, add (n) window to rear facade @ (e) 2nd fl bedrm. | $60,000 |
| Apr 27, 2010 | Completed final sign-off Oct 2011 | 791 Dolores St | move (e) kitchen from east end of flat to west end, replace (e) kitchen area w/ master bathrm. & closet, add laundry hall closet, minor work to (e) hall bath. add a private roof deck (250 sq.ft.) accessible by a new spiral stair.Details
move (e) kitchen from east end of flat to west end, replace (e) kitchen area w/ master bathrm. & closet, add laundry hall closet, minor work to (e) hall bath. add a private roof deck (250 sq.ft.) accessible by a new spiral stair. | $98,000 |
| Sep 2, 2008 | Completed final sign-off Jan 2010 | 3950 20th St | add new sunroom and roof deck with spiral staircase access to roof of existing residence.Details
add new sunroom and roof deck with spiral staircase access to roof of existing residence. | $105,000 |
| Dec 27, 2007 | Completed final sign-off Apr 2009 | 151 07th Av | remove (e) illegal 1 story deck, replace with new 2 story deck & stairs at rear yard. remove roof deck at 4/f, remove bathroom at 4/f & convert to storage only.Details
remove (e) illegal 1 story deck, replace with new 2 story deck & stairs at rear yard. remove roof deck at 4/f, remove bathroom at 4/f & convert to storage only. | $17,000 |
| Sep 6, 2005 | Expired or cancelled expired Jan 2008 | 684 Funston Av | add a penthouse on top of (e) 3rd floor. maintain 3 story structure through out entire bldg. renovat 3rd floor and enclose roof deck at this level to create more living space.Details
add a penthouse on top of (e) 3rd floor. maintain 3 story structure through out entire bldg. renovat 3rd floor and enclose roof deck at this level to create more living space. | $50,000 |