Back to bathroom remodel contractors
Rinaldi Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Sep 2026
- Last 24 months
- 25 permits filed
420 permits since 2000: 327 completed, 13 in progress, 39 never finaled, 41 expired or cancelled.
Of the 39 never-finaled permits, 2 are 3 to 5 years old, 12 are 5 to 10 years old, 25 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
112 bathroom remodel permits: 88 completed, 3 in progress, 10 never finaled, 11 expired or cancelled. Typically 0 days from filing to permit and 186 days from permit to final inspection.
Showing the 100 most recent of 112.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 7, 2026 | In progress issued Jul 2026 | 219 14th Av | remodel (e) kitchen in kind; replace cabinets, countertops, & appliances. remodel (e) half-bath next to kitchen in kind. all in kind. no change to floor layout. no change to wall layout. no structural work.Details
remodel (e) kitchen in kind; replace cabinets, countertops, & appliances. remodel (e) half-bath next to kitchen in kind. all in kind. no change to floor layout. no change to wall layout. no structural work. | $45,000 |
| Aug 13, 2025 | Completed final sign-off Feb 2026 | 2334 North Point St | lower unit: kitchen remodel, bathroom remodel, remodel e) powder rm into a laundry closet, remodel e) laundry closet & adjacent bedroom cloest into a full bathroom, provide a new gas insert applicance fireplace in the e) fireplace openingDetails
lower unit: kitchen remodel, bathroom remodel, remodel e) powder rm into a laundry closet, remodel e) laundry closet & adjacent bedroom cloest into a full bathroom, provide a new gas insert applicance fireplace in the e) fireplace opening | $83,000 |
| Jun 3, 2025 | In progress issued Jun 2025 | 1749 Page St | complete bathroom renovation. remodel change in layout. remooving (e) non load bearing partition wall. make bathroom and toilet room one single space. all meps will be updated.Details
complete bathroom renovation. remodel change in layout. remooving (e) non load bearing partition wall. make bathroom and toilet room one single space. all meps will be updated. | $40,000 |
| May 8, 2025 | Completed final sign-off Jul 2025 | 279 14th Av | replumb (e) bathroom, patch walls. re-wire 4 rooms, patch walls. run new main water line. patch concrete.Details
replumb (e) bathroom, patch walls. re-wire 4 rooms, patch walls. run new main water line. patch concrete. | $6,000 |
| Apr 10, 2025 | Completed final sign-off Jul 2025 | 1690 09th Av | full bathroom remodel in kind (no structural)Details
full bathroom remodel in kind (no structural) | $28,000 |
| Feb 25, 2025 | Completed final sign-off Jul 2025 | 1035 Union St | bathroom remodel in kind.Details
bathroom remodel in kind. | $18,000 |
| Jan 30, 2025 | Completed final sign-off Sep 2025 | 82 Rockridge Dr | bathroom located on 3rd floor to include replace toilet , tub , and sink. remodel no wall removal or layout changeDetails
bathroom located on 3rd floor to include replace toilet , tub , and sink. remodel no wall removal or layout change | $8,000 |
| Nov 18, 2024 | Completed final sign-off Apr 2025 | 131 Duncan St | remodel existing bathroom. new vanity, linen closet, tile floor and shower. no structural work. new light, like for likeDetails
remodel existing bathroom. new vanity, linen closet, tile floor and shower. no structural work. new light, like for like | $26,500 |
| Dec 22, 2023 | In progress issued Aug 2024 | 3950 20th St | interior renovation of kitchen and bathrooms. repair and replace noted windows. replace rear yard doors addition of light tube. no work done to front facade. new mechanical system to be design build under sep permit.Details
interior renovation of kitchen and bathrooms. repair and replace noted windows. replace rear yard doors addition of light tube. no work done to front facade. new mechanical system to be design build under sep permit. | $125,000 |
| Sep 7, 2023 | Completed final sign-off Dec 2023 | 122 Carl St | unit 2: remodel existing full bathroom in kind. no change to floor layout. no wall layout change. no structural work.Details
unit 2: remodel existing full bathroom in kind. no change to floor layout. no wall layout change. no structural work. | $12,000 |
| Jul 5, 2023 | Completed final sign-off Oct 2023 | 147 07th Av | full bathroom remodel non structuralDetails
full bathroom remodel non structural | $25,000 |
| Apr 24, 2023 | Completed final sign-off Jul 2023 | 491 Buena Vista East Av | replace interior windows in kind at 2nd and 3rd level bathrooms.Details
replace interior windows in kind at 2nd and 3rd level bathrooms. | $2,500 |
| Mar 16, 2023 | Completed final sign-off Apr 2024 | 1900 Lane St | 2/f: convert (e) dining into new kitchen. install new bath in (e) bedroom at rear. rehabilitate (e) bathroom. convert (e) kitchen to new bedroom. relocate (e) laundry to (e) garage. absorb lightwell space, no change to sq. footage. g/f: install 1 hr fire rated wall b/t garage and new habitableDetails
2/f: convert (e) dining into new kitchen. install new bath in (e) bedroom at rear. rehabilitate (e) bathroom. convert (e) kitchen to new bedroom. relocate (e) laundry to (e) garage. absorb lightwell space, no change to sq. footage. g/f: install 1 hr fire rated wall b/t garage and new habitable | $100,000 |
| Aug 11, 2022 | Completed final sign-off Jul 2023 | 491 Buena Vista East Av | remodel (1) kitchen and (2) full bathrooms. non structural.Details
remodel (1) kitchen and (2) full bathrooms. non structural. | $70,000 |
| Aug 1, 2022 | Expired or cancelled expired Dec 2025 | 74 Gladys St | kitchen and bathroom renovation in kind.Details
kitchen and bathroom renovation in kind. | $30,000 |
| Jul 6, 2022 | Expired or cancelled expired Apr 2026 | 6 August Al | alter (e) 2 unit bldg: 1st fl add usable space @ (n) media room/den add 2 ext'r doors, window & access stair @ south facade add bathrm, relocate furnace. 2nd fl replace (e) deck & stair, add door & window, 3rd fl relocate bath modify stair (n) ext'r glazed assembly north facade, (n) balconyDetails
alter (e) 2 unit bldg: 1st fl add usable space @ (n) media room/den add 2 ext'r doors, window & access stair @ south facade add bathrm, relocate furnace. 2nd fl replace (e) deck & stair, add door & window, 3rd fl relocate bath modify stair (n) ext'r glazed assembly north facade, (n) balcony | $950,000 |
| Jul 5, 2022 | Completed final sign-off Oct 2022 | 6 Niagara Av | remodel (e) kitchen & full bathroom.Details
remodel (e) kitchen & full bathroom. | $40,000 |
| Jun 8, 2022 | Expired or cancelled expired Oct 2025 | 455 Melrose Av | add new stair, mech room, bedroom, bath, family room to 1st fl. 2nd fl remodel (e) bedroom, bathroom & office into master suite. 3rd fl remove (e) fireplace. (n) heatpumps & tankless water heater.Details
add new stair, mech room, bedroom, bath, family room to 1st fl. 2nd fl remodel (e) bedroom, bathroom & office into master suite. 3rd fl remove (e) fireplace. (n) heatpumps & tankless water heater. | $175,000 |
| Jan 31, 2022 | Completed final sign-off Nov 2022 | 1113 York St | remodel kitchen & breakfast room at 3rd floor remodel bathroom at 3rd fl. replacement of rear windows and french door. replace electrical panel.Details
remodel kitchen & breakfast room at 3rd floor remodel bathroom at 3rd fl. replacement of rear windows and french door. replace electrical panel. | $60,000 |
| Jun 3, 2021 | Completed final sign-off Nov 2022 | 269 Frederick St | interior renovations including moving non-structural partiion walls and addition of a new bathroom.no new floor area proposed.Details
interior renovations including moving non-structural partiion walls and addition of a new bathroom.no new floor area proposed. | $35,000 |
| May 26, 2021 | Never finaled issued May 2021, no final | 758 Clayton St | kitchen remodel, 2 bathrooms replace heater in kindDetails
kitchen remodel, 2 bathrooms replace heater in kind | $34,000 |
| May 12, 2021 | Completed final sign-off Mar 2022 | 69 Joost Av | kitchen and bathroom remodel in-kind.Details
kitchen and bathroom remodel in-kind. | $25,000 |
| Mar 16, 2021 | Never finaled issued Aug 2023, no final | 2454 Francisco St | int renovation of (e) 3-story-2-unit bldg. (n) 4th flr fam rm addition. (n) front & rear walkout terraces. (n) externl front staircase, front door, doors from 2nd flr fam rm to deck. (n) 2nd flr entry foyer, internl staircase, (n) door to ter from bedrm & convert 3rd flr study to laundry & bath.Details
int renovation of (e) 3-story-2-unit bldg. (n) 4th flr fam rm addition. (n) front & rear walkout terraces. (n) externl front staircase, front door, doors from 2nd flr fam rm to deck. (n) 2nd flr entry foyer, internl staircase, (n) door to ter from bedrm & convert 3rd flr study to laundry & bath. | $620,000 |
| Jan 29, 2021 | Completed final sign-off May 2022 | 2710 Baker St | #5: non structural interior remodel extg bath on 4th floor. 3rd floor: remodel kitchen- remove fireplace replace furnace and install laundry.Details
#5: non structural interior remodel extg bath on 4th floor. 3rd floor: remodel kitchen- remove fireplace replace furnace and install laundry. | $50,000 |
| Dec 22, 2020 | Completed final sign-off Nov 2021 | 158 Beaumont Av | level 2 remodel of (e) bath + closet. relocate (e) bath #2. add office. remove & replace (e) interior windows. new skylights.Details
level 2 remodel of (e) bath + closet. relocate (e) bath #2. add office. remove & replace (e) interior windows. new skylights. | $49,000 |
| Dec 10, 2020 | Completed final sign-off Apr 2023 | 1050 North Point St | unit 209: remodel kitchen and bathroom. new lighting and finishes thru out. mep permitted separatelyDetails
unit 209: remodel kitchen and bathroom. new lighting and finishes thru out. mep permitted separately | $50,000 |
| Oct 7, 2020 | Completed final sign-off Mar 2022 | 1654 25th Av | remodel 1/f previously approved under pa #201106279023 & #201808167561. new concrete slab & new foundations (east/south wall). remove (e) bathroom, relocate new bathroom. remodel (e) bedroom, window, living room & door, new music room, laundry/storage room. new furnace & water heater garageDetails
remodel 1/f previously approved under pa #201106279023 & #201808167561. new concrete slab & new foundations (east/south wall). remove (e) bathroom, relocate new bathroom. remodel (e) bedroom, window, living room & door, new music room, laundry/storage room. new furnace & water heater garage | $45,000 |
| Sep 29, 2020 | Completed final sign-off Sep 2021 | 239 Brannan St | kitchen and full bathroom remodelingDetails
kitchen and full bathroom remodeling | $40,000 |
| May 27, 2020 | Completed final sign-off Oct 2021 | 14 Knott Ct | remodel existing kitchen, 3 bathrooms. all remodel work in-kind.Details
remodel existing kitchen, 3 bathrooms. all remodel work in-kind. | |
| Sep 19, 2019 | Never finaled issued Oct 2019, no final | 479 Steiner St | rev to pa# 201901241158; 479 unit #7 revise layout per plans, 499 unit #7 add sink to bathroom, 479 unit #6: remove laundry. (n) tankless water heater (elec) and remove 1 sink. replace 1 window in-kind, wood w/ integral ogee lugs.Details
rev to pa# 201901241158; 479 unit #7 revise layout per plans, 499 unit #7 add sink to bathroom, 479 unit #6: remove laundry. (n) tankless water heater (elec) and remove 1 sink. replace 1 window in-kind, wood w/ integral ogee lugs. | |
| Aug 12, 2019 | Completed final sign-off Nov 2019 | 230 Justin Dr | revision to permit #201812289331, rebuild interior stairs and bathroom, kitchen layout.Details
revision to permit #201812289331, rebuild interior stairs and bathroom, kitchen layout. | $1,000 |
| May 1, 2019 | Completed final sign-off Aug 2023 | 1634 Alabama St | 1st flr - remodel storage area behind garage to include 2 bed, 2 bath, install 2 skylights. 2nd flr - enclose lightwell at so. p.l. & expand and remodel (e) bath. add new deck w/stairs to rear yard - replace window & doors at west wall w/2 pair if doors. owner to cancel prior permit for new unit.Details
1st flr - remodel storage area behind garage to include 2 bed, 2 bath, install 2 skylights. 2nd flr - enclose lightwell at so. p.l. & expand and remodel (e) bath. add new deck w/stairs to rear yard - replace window & doors at west wall w/2 pair if doors. owner to cancel prior permit for new unit. | $84,000 |
| Mar 15, 2019 | Completed final sign-off May 2019 | 29 Ramona Av | unit #5: remodel kitchen and bathroom in kind. remove all lathe and plaster from entire apt and install new 5/8 board throughout after insulationg ext. walls. repair in kind.Details
unit #5: remodel kitchen and bathroom in kind. remove all lathe and plaster from entire apt and install new 5/8 board throughout after insulationg ext. walls. repair in kind. | $50,000 |
| Jan 24, 2019 | Never finaled issued Feb 2019, no final | 479 Steiner St | 479 unit #7: add 1 full bath at penthouse 499 unit #7 add kitchen and remodel 1 full bathDetails
479 unit #7: add 1 full bath at penthouse 499 unit #7 add kitchen and remodel 1 full bath | $30,000 |
| Jan 11, 2019 | Never finaled issued Jan 2019, no final | 479 Steiner St | unit #6: remodel kitchen and bathDetails
unit #6: remodel kitchen and bath | $30,000 |
| Oct 5, 2018 | Completed final sign-off Jan 2019 | 149 07th Av | kitchen and bathroom remodel. replace cabinets, counters, appliances, vanity, toilet, remove tub, add shower. no structural work.Details
kitchen and bathroom remodel. replace cabinets, counters, appliances, vanity, toilet, remove tub, add shower. no structural work. | $30,000 |
| Aug 2, 2018 | Completed final sign-off Mar 2019 | 66 Cleary Ct | unit #905: remodel extg kitchen and 2 bathrooms in same locations.Details
unit #905: remodel extg kitchen and 2 bathrooms in same locations. | $55,000 |
| May 1, 2017 | Completed final sign-off Oct 2017 | 3950 20th St | remodel (e) master bathroom at second floor. no structural work. replace (e) window. not visible from street.Details
remodel (e) master bathroom at second floor. no structural work. replace (e) window. not visible from street. | $15,000 |
| Dec 8, 2016 | Completed final sign-off Mar 2018 | 1910 30th Av | interior remodel of the rear area of 1/f level to includes a new full bathroom and a family room.Details
interior remodel of the rear area of 1/f level to includes a new full bathroom and a family room. | $47,000 |
| May 20, 2016 | Completed final sign-off Dec 2016 | 658 42nd Av | demo existing 1/2 bath under stairs, remodel of kitchen & bathroom on 2nd floor. addition of bathroom to 2nd floor and 1st floorDetails
demo existing 1/2 bath under stairs, remodel of kitchen & bathroom on 2nd floor. addition of bathroom to 2nd floor and 1st floor | $40,000 |
| Mar 14, 2016 | Completed final sign-off Jun 2016 | 1101 Green St | apt 1902: remodel (e) master bathroom. new shower. no structural. no alteration of wall, windows, and door.Details
apt 1902: remodel (e) master bathroom. new shower. no structural. no alteration of wall, windows, and door. | $10,000 |
| Feb 9, 2016 | Completed final sign-off Apr 2016 | 122 Carl St | work in unit #4: remodel one full bathroom. replace toilet, vanity and shower with new. install dishwasher and disposal in kitchen.Details
work in unit #4: remodel one full bathroom. replace toilet, vanity and shower with new. install dishwasher and disposal in kitchen. | $10,000 |
| Dec 21, 2015 | Completed final sign-off Nov 2018 | 2446 16th Av | add floor area to (e) 3rd fl master bedroom suite. work includes bathroom remodel & (n) roof deck. interior remodel of (e) 2nd fl bathrm, add (n) window to rear facade @ (e) 2nd fl bedrm.Details
add floor area to (e) 3rd fl master bedroom suite. work includes bathroom remodel & (n) roof deck. interior remodel of (e) 2nd fl bathrm, add (n) window to rear facade @ (e) 2nd fl bedrm. | $60,000 |
| Dec 14, 2015 | Completed final sign-off Aug 2016 | 1315 Grove St | top unit -work in 1315 grove street only: interior remodel: addition of 2nd bathroom, remodel extg bathroom. remodel extg powder room, remodel extg kichen, remodel front 2 living rooms into 2 bedroom, add fireplace appliance to living room, new furnace and locate to mudroom.Details
top unit -work in 1315 grove street only: interior remodel: addition of 2nd bathroom, remodel extg bathroom. remodel extg powder room, remodel extg kichen, remodel front 2 living rooms into 2 bedroom, add fireplace appliance to living room, new furnace and locate to mudroom. | $60,000 |
| Sep 18, 2015 | Completed final sign-off Oct 2015 | 1650 Jackson St | replace vanity only in full bathroom and install a stacked washer dryer in same bathroom. no structural work.Details
replace vanity only in full bathroom and install a stacked washer dryer in same bathroom. no structural work. | $3,000 |
| Jul 14, 2015 | Completed final sign-off Jun 2016 | 2151 California St | remodel existing bath in unit #2. remodel existing kitchen and bath in units #3 and #6. no structural work. no change to wall and layout. all work in kind.Details
remodel existing bath in unit #2. remodel existing kitchen and bath in units #3 and #6. no structural work. no change to wall and layout. all work in kind. | $48,000 |
| Jul 1, 2015 | Completed final sign-off Mar 2016 | 106 Justin Dr | remodel of the 1st flr to include a new bedroom with closet,new bathrm with new window,new living room,relocate furnace,remodel of the 2nd flr to include kitchen/diningrm/living rm,hall bathroom & hallway,enlarge windows & replace all windows & doors.Details
remodel of the 1st flr to include a new bedroom with closet,new bathrm with new window,new living room,relocate furnace,remodel of the 2nd flr to include kitchen/diningrm/living rm,hall bathroom & hallway,enlarge windows & replace all windows & doors. | $100,000 |
| Jun 12, 2015 | Completed final sign-off May 2021 | 253 Pixley St | third flr addition, building ht. increase of 7'-6". 4'-0" horizontal addition at front of house. relocation of kitchen to third flr. addition of 2 1/2 bathrooms and addition of 2 bedrooms.Details
third flr addition, building ht. increase of 7'-6". 4'-0" horizontal addition at front of house. relocation of kitchen to third flr. addition of 2 1/2 bathrooms and addition of 2 bedrooms. | $500,000 |
| Jun 2, 2015 | Completed final sign-off Jul 2016 | 1728 10th Av | convert (e) ground floor storage to living room, one bedroom, one laundry room and one utility and half bath within (e) bldg. envelope. excavating slab & reinforceing foundation to 7'-6" ceiling ht. new lighting and electrical, replace one window at front and one window at back. provide new furnace.Details
convert (e) ground floor storage to living room, one bedroom, one laundry room and one utility and half bath within (e) bldg. envelope. excavating slab & reinforceing foundation to 7'-6" ceiling ht. new lighting and electrical, replace one window at front and one window at back. provide new furnace. | $80,000 |
| Apr 23, 2015 | Completed final sign-off Sep 2015 | 226 11th Av | bathroom remodel: replace tub/toilet & vanity. no structural work. no new wall and no existing wall relocation. lighting in bathroom remodel shall comply with cec 150.0(k)5.Details
bathroom remodel: replace tub/toilet & vanity. no structural work. no new wall and no existing wall relocation. lighting in bathroom remodel shall comply with cec 150.0(k)5. | $10,000 |
| Mar 25, 2015 | Completed final sign-off Jan 2016 | 4635 25th St | build new non-structural partitions in (e) bedrm to create a new 71 sq.ft. home office & new 61 sq.ft. bathroom & closet; remodel an existing 33 sq.ft. bathroom.Details
build new non-structural partitions in (e) bedrm to create a new 71 sq.ft. home office & new 61 sq.ft. bathroom & closet; remodel an existing 33 sq.ft. bathroom. | $30,000 |
| Feb 19, 2015 | Completed final sign-off Jan 2016 | 2443 16th Av | 1) first floor: remove unpermitted office room, convert 736 sq ft to office bathroom, laundry room, hall and stair, new rear deck less than 3' above grade with steps down. 2) second fl: replace extg service stair with new code complying open stair to ground floor. 50 sq ft lightwell in fill.Details
1) first floor: remove unpermitted office room, convert 736 sq ft to office bathroom, laundry room, hall and stair, new rear deck less than 3' above grade with steps down. 2) second fl: replace extg service stair with new code complying open stair to ground floor. 50 sq ft lightwell in fill. | $82,855 |
| Oct 30, 2014 | Completed final sign-off Aug 2015 | 1321 Grove St | addition of new dwelling - 2 bedroom, 1 bath residential unit in existing basement space of existing 3 story, 3 flat building. all work will be within existing building envelope sprinklers under separate permitDetails
addition of new dwelling - 2 bedroom, 1 bath residential unit in existing basement space of existing 3 story, 3 flat building. all work will be within existing building envelope sprinklers under separate permit | $45,000 |
| Jul 31, 2014 | Completed final sign-off Aug 2015 | 1317 Grove St | work at 1317 grove st only. add a new bathroom, remodel an existing bathroom and remodel an (e) kitchen.Details
work at 1317 grove st only. add a new bathroom, remodel an existing bathroom and remodel an (e) kitchen. | $65,000 |
| Jul 10, 2014 | Expired or cancelled expired Feb 2016 | 969 Hayes St | #4: bathroom remodel at top floor; n/a maher ordinance #155-13Details
#4: bathroom remodel at top floor; n/a maher ordinance #155-13 | $18,000 |
| Jun 12, 2014 | Completed final sign-off Oct 2014 | 910 Larkin St | change of use from institutional to personel service. tatto studio. add millwork, sterilization area, sinks, lighting and partial wall. ada upgrade of entry bathroom. add janitors closet with sink.Details
change of use from institutional to personel service. tatto studio. add millwork, sterilization area, sinks, lighting and partial wall. ada upgrade of entry bathroom. add janitors closet with sink. | $8,000 |
| Jun 9, 2014 | Completed final sign-off Jul 2015 | 1319 Grove St | work to be performed at 1319 grove street only- to add a new bathroom, remodel an existing bathroom & remodel an existing kitchen.Details
work to be performed at 1319 grove street only- to add a new bathroom, remodel an existing bathroom & remodel an existing kitchen. | $65,000 |
| May 12, 2014 | Completed final sign-off Aug 2014 | 1515 Noe St | remodel one kitchen, new cabinets & counters. remodel one bathroom, new toilet, shower, vanity. no structural.Details
remodel one kitchen, new cabinets & counters. remodel one bathroom, new toilet, shower, vanity. no structural. | $40,000 |
| Mar 26, 2014 | Completed final sign-off Oct 2014 | 10 Hill St | remodel extg 2nd floor hall bathroom. remove one exterior window on the northwall and replace with 2 windows. add a new master bathroom on the 2nd floor with a new skylight. add a new skylight over the 2nd floor hallway. paint the exterior of the bldg.Details
remodel extg 2nd floor hall bathroom. remove one exterior window on the northwall and replace with 2 windows. add a new master bathroom on the 2nd floor with a new skylight. add a new skylight over the 2nd floor hallway. paint the exterior of the bldg. | $55,000 |
| Mar 24, 2014 | Completed final sign-off Jun 2014 | 1101 Green St | partial remodel in kitchen. install new washing machine and move (e) frig. to create space. partial bathroom remodel: remove jacuzzi tub and replace with custom japanese soaking tub. all existing cabinets to remain. no walls moved, removed or added, all fixture layout to remain unchanged.Details
partial remodel in kitchen. install new washing machine and move (e) frig. to create space. partial bathroom remodel: remove jacuzzi tub and replace with custom japanese soaking tub. all existing cabinets to remain. no walls moved, removed or added, all fixture layout to remain unchanged. | $5,000 |
| Oct 16, 2013 | Completed final sign-off Feb 2014 | 124 Carl St | unit b - partial kitchen remodel - replace lower cabinets only with new; bathroom remodel - replace shower stall, vanity & toilet; no structural. to comply with cec150(k) 8 & 10.Details
unit b - partial kitchen remodel - replace lower cabinets only with new; bathroom remodel - replace shower stall, vanity & toilet; no structural. to comply with cec150(k) 8 & 10. | $15,000 |
| Jul 15, 2013 | Never finaled issued Jul 2013, no final | 1319 Grove St | remodel existing kitchen and bathroom, repair dry rot damage to center porchDetails
remodel existing kitchen and bathroom, repair dry rot damage to center porch | $38,000 |
| May 20, 2013 | Completed final sign-off Dec 2015 | 384 11th Av | change of use from dental office to single family residential. at 2nd floor - demolish non-structural partition at (e) sterilization room & remove interior glazing & partition below glazing at (e) waiting room. add kitchen and one bath. provide stair enclosure.Details
change of use from dental office to single family residential. at 2nd floor - demolish non-structural partition at (e) sterilization room & remove interior glazing & partition below glazing at (e) waiting room. add kitchen and one bath. provide stair enclosure. | $8,000 |
| May 7, 2013 | Completed final sign-off Jul 2015 | 981 Mission St | repair & upgrade (e) store front, install new exit stair, install new handicap lift, upgrade (e) bathrooms, install new ada baths, install new lighting & electrical & other misc. internal alterations.Details
repair & upgrade (e) store front, install new exit stair, install new handicap lift, upgrade (e) bathrooms, install new ada baths, install new lighting & electrical & other misc. internal alterations. | $200,000 |
| Mar 25, 2013 | Completed final sign-off Jun 2014 | 66 Parker Av | demolition of 2 bathrooms and kitchen and remodel each.Details
demolition of 2 bathrooms and kitchen and remodel each. | $28,000 |
| Feb 22, 2013 | Never finaled issued Feb 2013, no final | 3921 24th St | replace (e) vanity with new vanity, replace (e) toilet with new toilet. partial remodel of full bathroom, 5x7. replace linoleum floor with new tile floorDetails
replace (e) vanity with new vanity, replace (e) toilet with new toilet. partial remodel of full bathroom, 5x7. replace linoleum floor with new tile floor | $3,000 |
| Jan 9, 2013 | Completed final sign-off Mar 2013 | 779 Clayton St | add a new full bathroom in the area of the existing closet space at 2nd floor.Details
add a new full bathroom in the area of the existing closet space at 2nd floor. | $10,000 |
| Aug 6, 2012 | Completed final sign-off Oct 2012 | 85 Richland Av | kitchen & bathroom remodel. remove cabinets, counters & replace with new. install appliances & fixtures.Details
kitchen & bathroom remodel. remove cabinets, counters & replace with new. install appliances & fixtures. | $20,000 |
| Dec 23, 2011 | Never finaled issued Oct 2012, no final | 1739 10th Av | demo(e) 6'x10' storage @ rear bldg & (e) deck. replace w/ new 8'x10' room & 7'x 10' redwood deck. install (n) bathroom-sink, tub, toilet. reroof entire extension on bldg.Details
demo(e) 6'x10' storage @ rear bldg & (e) deck. replace w/ new 8'x10' room & 7'x 10' redwood deck. install (n) bathroom-sink, tub, toilet. reroof entire extension on bldg. | $32,000 |
| Dec 5, 2011 | Completed final sign-off Dec 2011 | 450 34th Av | revision to pa# 2011-0721-0700-reduce scope of work, convert proposed full bathroom to storage room at garage levelDetails
revision to pa# 2011-0721-0700-reduce scope of work, convert proposed full bathroom to storage room at garage level | |
| Nov 10, 2011 | Never finaled issued Nov 2011, no final | 225 10th Av | partial bathroom remodel: remove shower & install a new tub. repair dryrot damage around window in same bathroom.Details
partial bathroom remodel: remove shower & install a new tub. repair dryrot damage around window in same bathroom. | $5,000 |
| Jul 21, 2011 | Completed final sign-off Dec 2011 | 450 34th Av | add bathroom to garage levelDetails
add bathroom to garage level | $1,500 |
| Jun 17, 2011 | Completed final sign-off Jan 2012 | 736 Haight St | add an additonal bath to existing space. bath will include toilet, vanity/sink, shower/tub combo, skylight, ventilation fan, heating ductDetails
add an additonal bath to existing space. bath will include toilet, vanity/sink, shower/tub combo, skylight, ventilation fan, heating duct | $25,000 |
| Oct 22, 2010 | Completed final sign-off Mar 2013 | 114 Chattanooga St | 1st floor: foundation repalcement, new storage room at rear includes structural work at first floor. 2nd floor: bathroom, bedroom, family room remodel.relocate exterior trademan stair on gradeDetails
1st floor: foundation repalcement, new storage room at rear includes structural work at first floor. 2nd floor: bathroom, bedroom, family room remodel.relocate exterior trademan stair on grade | $215,000 |
| May 4, 2010 | Completed final sign-off Dec 2010 | 405 Crestmont Dr | work @ unit# 405 only. add 50 sq ft to existing office & closet. remodel existing closet area to a new bathroom & laundry room.Details
work @ unit# 405 only. add 50 sq ft to existing office & closet. remodel existing closet area to a new bathroom & laundry room. | $30,000 |
| Apr 27, 2010 | Completed final sign-off Oct 2011 | 791 Dolores St | move (e) kitchen from east end of flat to west end, replace (e) kitchen area w/ master bathrm. & closet, add laundry hall closet, minor work to (e) hall bath. add a private roof deck (250 sq.ft.) accessible by a new spiral stair.Details
move (e) kitchen from east end of flat to west end, replace (e) kitchen area w/ master bathrm. & closet, add laundry hall closet, minor work to (e) hall bath. add a private roof deck (250 sq.ft.) accessible by a new spiral stair. | $98,000 |
| Nov 18, 2009 | Completed final sign-off Feb 2010 | 4655 25th St | remodel extg kitchen and instal new shower in place of tub in bathroom. replace vanity cabinet at new unit.Details
remodel extg kitchen and instal new shower in place of tub in bathroom. replace vanity cabinet at new unit. | $19,000 |
| Sep 4, 2009 | Completed final sign-off Dec 2009 | 3983 Cesar Chavez St | work @ unit# 2 only. kitchen remodel. remove cabinets, counter & replace in kind. area approx 10' x 10'. bathroom remodel. remove tub, vanity, toilet. replace in kind. no structural work. area approx 5' x 8'. repair dry rot damage @ base of 2 windows @ rear of building. no structural.Details
work @ unit# 2 only. kitchen remodel. remove cabinets, counter & replace in kind. area approx 10' x 10'. bathroom remodel. remove tub, vanity, toilet. replace in kind. no structural work. area approx 5' x 8'. repair dry rot damage @ base of 2 windows @ rear of building. no structural. | $23,000 |
| Jun 25, 2009 | Completed final sign-off Jan 2012 | 324 Caselli Av | addition and remodel. gr fl: new tanden parking space, new guest room, family room, music room, bath. 2nd fl: remodel kitchen, new laundry room, powder room. stair to gr level and 3rd fl. 3rd fl: new master bedroom suite, new bedroom, bath, furnace, water heater and facade at frontDetails
addition and remodel. gr fl: new tanden parking space, new guest room, family room, music room, bath. 2nd fl: remodel kitchen, new laundry room, powder room. stair to gr level and 3rd fl. 3rd fl: new master bedroom suite, new bedroom, bath, furnace, water heater and facade at front | $350,000 |
| Jun 16, 2009 | Completed final sign-off Jul 2010 | 1530 12th Av | addition at 1st flr level of 38 sq ft & 24 sq ft to the northeast & southeast corners (rear of building). relocate bathroom at 1st level to northeast corner, replace (e) bathroom location with powder room & laundry room. remodel the (e) kitchen, add deck at 1st floor level at rearDetails
addition at 1st flr level of 38 sq ft & 24 sq ft to the northeast & southeast corners (rear of building). relocate bathroom at 1st level to northeast corner, replace (e) bathroom location with powder room & laundry room. remodel the (e) kitchen, add deck at 1st floor level at rear | $90,000 |
| Nov 4, 2008 | Completed final sign-off Feb 2009 | 1323 11th Av | work @ unit# 1323 only. kitchen remodel. remove existing cabinets. counter & replace with new. partial bathroom remodel. retile floors, install new toilet. no structural work.Details
work @ unit# 1323 only. kitchen remodel. remove existing cabinets. counter & replace with new. partial bathroom remodel. retile floors, install new toilet. no structural work. | $20,000 |
| Aug 14, 2008 | Completed final sign-off Nov 2008 | 93 Hill St | remodel 1 full bathroom. no structural. located on the middle level of bldg. no change in wall layout nor openings.Details
remodel 1 full bathroom. no structural. located on the middle level of bldg. no change in wall layout nor openings. | $8,800 |
| Jul 25, 2008 | Completed final sign-off Apr 2009 | 770 03rd Av | add bedroom, family room, bathroom & sliding door & laundry at ground floor. remodel kitchen @ 2nd floor, remove bathroom & add new bath at 3rd floor and 2 new store closets at garage area.Details
add bedroom, family room, bathroom & sliding door & laundry at ground floor. remodel kitchen @ 2nd floor, remove bathroom & add new bath at 3rd floor and 2 new store closets at garage area. | $55,000 |
| Apr 14, 2008 | Completed final sign-off Feb 2009 | 543 17th Av | remodel existing kitchen/replace cabinets/counter. remodel existing full bathroom. replace tub/toilet/vanity. remove lathe and plaster on ceilings throughout the unit to remove lights/switches. insulate & sheetrock w/ 5/8" fire rated rock.Details
remodel existing kitchen/replace cabinets/counter. remodel existing full bathroom. replace tub/toilet/vanity. remove lathe and plaster on ceilings throughout the unit to remove lights/switches. insulate & sheetrock w/ 5/8" fire rated rock. | $30,000 |
| Jan 31, 2008 | Expired or cancelled expired Jan 2009 | 2112 Pine St | legalize bathroom per 3-r #3-r4959Details
legalize bathroom per 3-r #3-r4959 | $3,000 |
| Dec 27, 2007 | Completed final sign-off Apr 2009 | 151 07th Av | remove (e) illegal 1 story deck, replace with new 2 story deck & stairs at rear yard. remove roof deck at 4/f, remove bathroom at 4/f & convert to storage only.Details
remove (e) illegal 1 story deck, replace with new 2 story deck & stairs at rear yard. remove roof deck at 4/f, remove bathroom at 4/f & convert to storage only. | $17,000 |
| Nov 13, 2007 | Expired or cancelled expired Jan 2009 | 273 16th Av | remodel (e) full bathroom on top floor. no sturctural. remove & replace tub, toilet & vanity. no lighting changes.Details
remodel (e) full bathroom on top floor. no sturctural. remove & replace tub, toilet & vanity. no lighting changes. | $8,000 |
| Jun 29, 2007 | Completed final sign-off Dec 2007 | 450 34th Av | interior non structural renovation to include kitchen, laundry and two bathrooms.Details
interior non structural renovation to include kitchen, laundry and two bathrooms. | $55,000 |
| Feb 8, 2007 | Completed final sign-off Aug 2007 | 5426 Fulton St | kitchen remodeling/bedroom remodel. 1/2 bath remodel, convert to full bath. see plans-no structural.Details
kitchen remodeling/bedroom remodel. 1/2 bath remodel, convert to full bath. see plans-no structural. | $25,000 |
| Aug 25, 2006 | Completed final sign-off Feb 2007 | 1638 14th Av | 1) replace plmg fixturs and tile at ground floor bath 2) add windw at grnd floor bath,3) replace plbg fixtures and tile at 2nd flr bath, 4) remove wall between bdrm 1 master bdrm and sunroom, 5) build 4' wall at sunroom, 6) install gas stove at sunroomDetails
1) replace plmg fixturs and tile at ground floor bath 2) add windw at grnd floor bath,3) replace plbg fixtures and tile at 2nd flr bath, 4) remove wall between bdrm 1 master bdrm and sunroom, 5) build 4' wall at sunroom, 6) install gas stove at sunroom | $30,000 |
| Jun 21, 2006 | Expired or cancelled expired Aug 2007 | 770 16th Av | remodel (1) kitchen and (1)bath, add (1) new master bathroom per plansDetails
remodel (1) kitchen and (1)bath, add (1) new master bathroom per plans | $25,000 |
| May 8, 2006 | Expired or cancelled expired Aug 2007 | 772 16th Av | remodel itchen, bathroom, add bathroom, enlarge non-baring opening.Details
remodel itchen, bathroom, add bathroom, enlarge non-baring opening. | $20,000 |
| Dec 16, 2005 | Never finaled issued Dec 2005, no final | 223 14th Av | remodel full bath on second fl, chage tub, toilet, vanity.Details
remodel full bath on second fl, chage tub, toilet, vanity. | $8,000 |
| Oct 26, 2005 | Completed final sign-off Jan 2006 | 142 Parker Av | upper level bathroom remodel (no structural) comply with t-24 energy codeDetails
upper level bathroom remodel (no structural) comply with t-24 energy code | $10,000 |
| Aug 12, 2005 | Completed final sign-off May 2006 | 7032 Fulton St | kitchen/bathroom remodel main level-construct new master bedrm&bathrm at garage level.w/sprial......Details
kitchen/bathroom remodel main level-construct new master bedrm&bathrm at garage level.w/sprial...... | $75,000 |
| Jul 5, 2005 | Expired or cancelled expired May 2006 | 7034 Fulton St | remodel 1 bathroom-new toilet,vanity,tub(same location).remodel kitchen-remove/replace cabinets,Details
remodel 1 bathroom-new toilet,vanity,tub(same location).remodel kitchen-remove/replace cabinets, | $19,000 |
| Sep 15, 2004 | Completed final sign-off Nov 2004 | 103 Park St | remodel full bathroom,repair dryrot damage to floor near tub.install handrails per complaint,replaceDetails
remodel full bathroom,repair dryrot damage to floor near tub.install handrails per complaint,replace | $9,000 |
| Aug 12, 2004 | Completed final sign-off Mar 2005 | 70 Parker Av | remodel kitchen and two bathrooms, see plansDetails
remodel kitchen and two bathrooms, see plans | $38,000 |
| Jul 22, 2004 | Completed final sign-off Nov 2004 | 623 35th Av | bathroom remodel, replace toilet/vanity/shower valve.Details
bathroom remodel, replace toilet/vanity/shower valve. | $4,000 |
| Jun 3, 2004 | Completed final sign-off Feb 2005 | 225 Valley St | remodel 2 kitchens 4 bath per plans see plans. (no structural)Details
remodel 2 kitchens 4 bath per plans see plans. (no structural) | $95,000 |