Rico's General Construction
- Based in
- El Sobrante
- On San Francisco permits
- Apr 2011 to Aug 2026
- Last 24 months
- 6 permits filed
100 permits since 2000: 63 completed, 5 in progress, 17 never finaled, 15 expired or cancelled.
Of the 17 never-finaled permits, 14 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
13 stairs permits: 8 completed, 3 in progress, 2 expired or cancelled. Typically 361 days from filing to permit and 526 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 10, 2026 | Completed final sign-off Oct 2026 | 2266 09th Av | this project will consist of the demoliton of the (e) rear decks currently in disrepair. to comply with nov#202426404 first floor stairs to ramain repair as nesesary.Details
this project will consist of the demoliton of the (e) rear decks currently in disrepair. to comply with nov#202426404 first floor stairs to ramain repair as nesesary. | $267 |
| Jul 11, 2025 | In progress issued Aug 2025 | 680 Connecticut St | interior remodel and roof deck set back on all sides, no changes to front facade. replace deck and stair with new stairs to back yard. increase 504 sqft. converting garage to habitable space.Details
interior remodel and roof deck set back on all sides, no changes to front facade. replace deck and stair with new stairs to back yard. increase 504 sqft. converting garage to habitable space. | $250,000 |
| Jul 13, 2022 | In progress issued May 2024 | 88 Castenada Av | renovation & vertical expansion. alteration to interior comprises of reconfiguration of interior stair. modification of ground fl and l2 floor plans & windows. exterior modifications include front & rear facades, exterior entry area landscaping, and addition of stair penthouse.Details
renovation & vertical expansion. alteration to interior comprises of reconfiguration of interior stair. modification of ground fl and l2 floor plans & windows. exterior modifications include front & rear facades, exterior entry area landscaping, and addition of stair penthouse. | $550,000 |
| Jun 23, 2022 | In progress issued Jul 2025 | 945 Minnesota St | comply w/ complalint #202290991 for 945-947 minnesota - exceeding scope of work, re-frame damaged area of building @ back of the building. horizontal addition. complete remodel on all floors. new stair at rear. new roof deck.Details
comply w/ complalint #202290991 for 945-947 minnesota - exceeding scope of work, re-frame damaged area of building @ back of the building. horizontal addition. complete remodel on all floors. new stair at rear. new roof deck. | $20,000 |
| Feb 26, 2021 | Expired or cancelled cancelled Jan 2026 | 98 Mullen Av | 950 sf 1-story vertical addition to an existing 1-story-over-garage. new int stair to be constructed from basement to lv 2, kitchen moved from lv 1 to lv 2, new bathrooms to be constructed on lv 1 and lv 2, structural repairs in basement, ext stair to be modified to enter through basement, existingDetails
950 sf 1-story vertical addition to an existing 1-story-over-garage. new int stair to be constructed from basement to lv 2, kitchen moved from lv 1 to lv 2, new bathrooms to be constructed on lv 1 and lv 2, structural repairs in basement, ext stair to be modified to enter through basement, existing | $200,000 |
| Feb 11, 2021 | Completed final sign-off Aug 2024 | 1554 Masonic Av | renovation and vertical & horizontal expansion. alteration to the existing main house consisting of minor modifications to the front facade windows, an update to the rear facade windows and doors, and reconfiguration of the existing interior stair. minor excavation on the ground floor. 3rdfl 480sqftDetails
renovation and vertical & horizontal expansion. alteration to the existing main house consisting of minor modifications to the front facade windows, an update to the rear facade windows and doors, and reconfiguration of the existing interior stair. minor excavation on the ground floor. 3rdfl 480sqft | $400,000 |
| Oct 10, 2020 | Completed final sign-off May 2022 | 1523 26th Av | remodel of 2-story home. excavation @ 1st fl (& portion of rear yard) to increase ceiling height over portion of fl; relocate 1st fl bath & laundry; replace interior stair w/ (n) stair; remodel kitchen, bath, & half bath on 2nd fl; replace windows on rear facade & in south lightwell. mep separateDetails
remodel of 2-story home. excavation @ 1st fl (& portion of rear yard) to increase ceiling height over portion of fl; relocate 1st fl bath & laundry; replace interior stair w/ (n) stair; remodel kitchen, bath, & half bath on 2nd fl; replace windows on rear facade & in south lightwell. mep separate | $250,000 |
| Oct 3, 2019 | Expired or cancelled revoked Oct 2022 | 945 Minnesota St | replace damaged front stair entry doors, all windows. modify width of center windows @ front bay. wood windows w/ ogee lugs @ front & exposed north facade. all other windows shall be wd.marvin integrity. replace all clapboard to rustic siding to match (e). create (n) deck @ rear 3rd fl roof level -Details
replace damaged front stair entry doors, all windows. modify width of center windows @ front bay. wood windows w/ ogee lugs @ front & exposed north facade. all other windows shall be wd.marvin integrity. replace all clapboard to rustic siding to match (e). create (n) deck @ rear 3rd fl roof level - | $10,000 |
| Nov 9, 2018 | Completed final sign-off Nov 2019 | 935 North Point St | rectifying s.f. planning department complaint #2018008154 enf. add 1 hour fire rated wall at common stair. add stair to connect 2nd and 3rd floor unit one. add bathrom @ 2nd floor. revert back to a 2 unit bldg.Details
rectifying s.f. planning department complaint #2018008154 enf. add 1 hour fire rated wall at common stair. add stair to connect 2nd and 3rd floor unit one. add bathrom @ 2nd floor. revert back to a 2 unit bldg. | $10,000 |
| Oct 16, 2018 | Completed final sign-off Nov 2022 | 1580 Dolores St | interior ti of all 3 flrs. work incl (n) stair openings, kitchen and bathroom relocation, (n) mster suite.Details
interior ti of all 3 flrs. work incl (n) stair openings, kitchen and bathroom relocation, (n) mster suite. | |
| Apr 20, 2017 | Completed final sign-off Jan 2021 | 248 Prospect Av | excavate for basement level remodel, 1st floor remodel, 2nd story (n) 700 ft vertical addition with (n) kitchen, (n) bath & (n) great room. reepair rear deck & stairs not to exceed 50% in kind as required.Details
excavate for basement level remodel, 1st floor remodel, 2nd story (n) 700 ft vertical addition with (n) kitchen, (n) bath & (n) great room. reepair rear deck & stairs not to exceed 50% in kind as required. | $200,000 |
| Aug 18, 2015 | Completed final sign-off Sep 2019 | 2239 Webster St | restore base of 2nd floor bay window, lower (e) sloped driveway & install new garage door, replace (e) front stair railing, remove a portion of bldg at rear of property, and interior remodel of existing 2 units, maher n/aDetails
restore base of 2nd floor bay window, lower (e) sloped driveway & install new garage door, replace (e) front stair railing, remove a portion of bldg at rear of property, and interior remodel of existing 2 units, maher n/a | $280,000 |
| Jun 23, 2011 | Completed final sign-off Nov 2011 | 166 Arguello Bl | demo 2 extg bathrooms,lower portion of extg conditioned space and garage floor. add new stairs,2 new bathrooms, plumbing, electrical work. new exterior doors and windows, plumbing, electrical heat under sep. trade permit. replace garage door.Details
demo 2 extg bathrooms,lower portion of extg conditioned space and garage floor. add new stairs,2 new bathrooms, plumbing, electrical work. new exterior doors and windows, plumbing, electrical heat under sep. trade permit. replace garage door. | $100,000 |