Rico's General Construction
- Based in
- El Sobrante
- On San Francisco permits
- Apr 2011 to Aug 2026
- Last 24 months
- 6 permits filed
100 permits since 2000: 63 completed, 5 in progress, 17 never finaled, 15 expired or cancelled.
Of the 17 never-finaled permits, 14 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
7 deck permits: 4 completed, 2 in progress, 1 expired or cancelled. Typically 190 days from filing to permit and 292 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 10, 2026 | Completed final sign-off Oct 2026 | 2266 09th Av | this project will consist of the demoliton of the (e) rear decks currently in disrepair. to comply with nov#202426404 first floor stairs to ramain repair as nesesary.Details
this project will consist of the demoliton of the (e) rear decks currently in disrepair. to comply with nov#202426404 first floor stairs to ramain repair as nesesary. | $267 |
| Aug 13, 2025 | In progress issued Feb 2026 | 1006 Carolina St | reconfiguration of lower unit interior- 1/f and 2/f, reconfiguration of upper unit interior- 3/f. removal of (e) rear decks and addition of (n) cantilevered deck @ 3/f. front and rear facade alteration. addition of (n) exterior staris connecting (e) rear yard to ground flr. reroofing.Details
reconfiguration of lower unit interior- 1/f and 2/f, reconfiguration of upper unit interior- 3/f. removal of (e) rear decks and addition of (n) cantilevered deck @ 3/f. front and rear facade alteration. addition of (n) exterior staris connecting (e) rear yard to ground flr. reroofing. | $770,047 |
| May 14, 2025 | In progress issued Oct 2025 | 7 Bennington St | remodel & vertical expansion of an (e)single family dwelling structure,including a modification of a small portion of the ground fl,modification of the (e)2nd fl,addition of a new 3rd fl and a small roof deck,modification of front & rear facades,& addition of a small rear deckDetails
remodel & vertical expansion of an (e)single family dwelling structure,including a modification of a small portion of the ground fl,modification of the (e)2nd fl,addition of a new 3rd fl and a small roof deck,modification of front & rear facades,& addition of a small rear deck | $558,000 |
| Oct 3, 2019 | Expired or cancelled revoked Oct 2022 | 945 Minnesota St | replace damaged front stair entry doors, all windows. modify width of center windows @ front bay. wood windows w/ ogee lugs @ front & exposed north facade. all other windows shall be wd.marvin integrity. replace all clapboard to rustic siding to match (e). create (n) deck @ rear 3rd fl roof level -Details
replace damaged front stair entry doors, all windows. modify width of center windows @ front bay. wood windows w/ ogee lugs @ front & exposed north facade. all other windows shall be wd.marvin integrity. replace all clapboard to rustic siding to match (e). create (n) deck @ rear 3rd fl roof level - | $10,000 |
| Sep 10, 2019 | Completed final sign-off Jan 2021 | 248 Prospect Av | reconfigure rear yard deck within (e) envelope.Details
reconfigure rear yard deck within (e) envelope. | $10,000 |
| Apr 20, 2017 | Completed final sign-off Jan 2021 | 248 Prospect Av | excavate for basement level remodel, 1st floor remodel, 2nd story (n) 700 ft vertical addition with (n) kitchen, (n) bath & (n) great room. reepair rear deck & stairs not to exceed 50% in kind as required.Details
excavate for basement level remodel, 1st floor remodel, 2nd story (n) 700 ft vertical addition with (n) kitchen, (n) bath & (n) great room. reepair rear deck & stairs not to exceed 50% in kind as required. | $200,000 |
| Jun 30, 2011 | Completed final sign-off Jun 2012 | 2635 Broderick St | develop ground floor space under (e) deck to new bedroom. 2nd floor deck to be replaced with new deck.Details
develop ground floor space under (e) deck to new bedroom. 2nd floor deck to be replaced with new deck. | $55,000 |