Back to bathroom remodel contractors
Rico's General Construction
- Based in
- El Sobrante
- On San Francisco permits
- Apr 2011 to Aug 2026
- Last 24 months
- 6 permits filed
100 permits since 2000: 63 completed, 5 in progress, 17 never finaled, 15 expired or cancelled.
Of the 17 never-finaled permits, 14 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
17 bathroom remodel permits: 14 completed, 1 never finaled, 2 expired or cancelled. Typically 18 days from filing to permit and 194 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 26, 2021 | Expired or cancelled cancelled Jan 2026 | 98 Mullen Av | 950 sf 1-story vertical addition to an existing 1-story-over-garage. new int stair to be constructed from basement to lv 2, kitchen moved from lv 1 to lv 2, new bathrooms to be constructed on lv 1 and lv 2, structural repairs in basement, ext stair to be modified to enter through basement, existingDetails
950 sf 1-story vertical addition to an existing 1-story-over-garage. new int stair to be constructed from basement to lv 2, kitchen moved from lv 1 to lv 2, new bathrooms to be constructed on lv 1 and lv 2, structural repairs in basement, ext stair to be modified to enter through basement, existing | $200,000 |
| Oct 10, 2020 | Completed final sign-off May 2022 | 1523 26th Av | remodel of 2-story home. excavation @ 1st fl (& portion of rear yard) to increase ceiling height over portion of fl; relocate 1st fl bath & laundry; replace interior stair w/ (n) stair; remodel kitchen, bath, & half bath on 2nd fl; replace windows on rear facade & in south lightwell. mep separateDetails
remodel of 2-story home. excavation @ 1st fl (& portion of rear yard) to increase ceiling height over portion of fl; relocate 1st fl bath & laundry; replace interior stair w/ (n) stair; remodel kitchen, bath, & half bath on 2nd fl; replace windows on rear facade & in south lightwell. mep separate | $250,000 |
| Feb 27, 2020 | Completed final sign-off Oct 2023 | 2231 Steiner St | renovation work @ 2nd & 3rd fl @ (2)(e) residential units. work to include (n) living space @ 2nd fl & (n) master bathroom & expanded kitchen space @ 3rd flDetails
renovation work @ 2nd & 3rd fl @ (2)(e) residential units. work to include (n) living space @ 2nd fl & (n) master bathroom & expanded kitchen space @ 3rd fl | $125,000 |
| Oct 26, 2018 | Never finaled issued Nov 2018, no final | 447 Bush St | 2nd fl combining 2 guest rooms int0 1 accessible suite, add 1 guest rm in former lounge space to maintain guest room total work includes 2 new baths, rmodel e bath into accesible one. mep fire spr, t24 separately. both units remain residentialDetails
2nd fl combining 2 guest rooms int0 1 accessible suite, add 1 guest rm in former lounge space to maintain guest room total work includes 2 new baths, rmodel e bath into accesible one. mep fire spr, t24 separately. both units remain residential | $140,000 |
| Oct 16, 2018 | Completed final sign-off Nov 2022 | 1580 Dolores St | interior ti of all 3 flrs. work incl (n) stair openings, kitchen and bathroom relocation, (n) mster suite.Details
interior ti of all 3 flrs. work incl (n) stair openings, kitchen and bathroom relocation, (n) mster suite. | |
| May 14, 2018 | Completed final sign-off Mar 2019 | 1030 Fell St | remodel one bathroom and kitchen in unit #4. comply with nov # 201853445. no change in walls and openings layout. n/a maherDetails
remodel one bathroom and kitchen in unit #4. comply with nov # 201853445. no change in walls and openings layout. n/a maher | $15,000 |
| Dec 11, 2017 | Completed final sign-off Apr 2018 | 129 17th Av | revision to pa#201709137945, per correction issued 12/8/2017; full kitchen, bathroom & laundry remodel, no structural workDetails
revision to pa#201709137945, per correction issued 12/8/2017; full kitchen, bathroom & laundry remodel, no structural work | $45,000 |
| Apr 20, 2017 | Completed final sign-off Jan 2021 | 248 Prospect Av | excavate for basement level remodel, 1st floor remodel, 2nd story (n) 700 ft vertical addition with (n) kitchen, (n) bath & (n) great room. reepair rear deck & stairs not to exceed 50% in kind as required.Details
excavate for basement level remodel, 1st floor remodel, 2nd story (n) 700 ft vertical addition with (n) kitchen, (n) bath & (n) great room. reepair rear deck & stairs not to exceed 50% in kind as required. | $200,000 |
| Apr 7, 2016 | Completed final sign-off Aug 2016 | 30 Athens St | bathroom addition on 1st floor.Details
bathroom addition on 1st floor. | $25,000 |
| Dec 6, 2013 | Completed final sign-off Oct 2015 | 1906 Mission St | 2nd and 3rd floor:remodel of shower rooms on both floors, new bathroom at manager apt on 2n fl. remodel of reception area on 2nd fl., new windows at bldg facade both floors, mep ls and sprinklers on separate permits. jjcDetails
2nd and 3rd floor:remodel of shower rooms on both floors, new bathroom at manager apt on 2n fl. remodel of reception area on 2nd fl., new windows at bldg facade both floors, mep ls and sprinklers on separate permits. jjc | $100,000 |
| Oct 11, 2013 | Completed final sign-off Feb 2014 | 85 Marcela Av | kitchen remodel and new bathroom on first floorDetails
kitchen remodel and new bathroom on first floor | $35,000 |
| Aug 6, 2013 | Expired or cancelled expired Jan 2020 | 2567 Union St | interior remodel within (e) bldg envelope, new 3rd story addition, 1 bathroom and one bath on 3rd story, horizontal extension to the rear, new garage in the front of the propertyDetails
interior remodel within (e) bldg envelope, new 3rd story addition, 1 bathroom and one bath on 3rd story, horizontal extension to the rear, new garage in the front of the property | $150,000 |
| Jun 27, 2013 | Completed final sign-off Dec 2013 | 1234 Page St | ground floor lower unit - new drywall throughout unit, studs repairs in kind for dryrot damage, plbg upgrade on bathroom & kitchen, electrical upgrade throuhout unit, replace widnows (4) & doors (6) in kind, new moldings, new cabinets & countertop.Details
ground floor lower unit - new drywall throughout unit, studs repairs in kind for dryrot damage, plbg upgrade on bathroom & kitchen, electrical upgrade throuhout unit, replace widnows (4) & doors (6) in kind, new moldings, new cabinets & countertop. | $30,000 |
| Jun 3, 2013 | Completed final sign-off Aug 2013 | 447 Bush St | to comply with ordinance 029-13. installation of grab bars. 1 full bathroom and 4 half bath on all 4 floors. 2 on each floor.Details
to comply with ordinance 029-13. installation of grab bars. 1 full bathroom and 4 half bath on all 4 floors. 2 on each floor. | $3,000 |
| Jun 15, 2012 | Completed final sign-off Nov 2012 | 201 Raccoon Dr | first floor master bathroom remodel; moving tub, sink, adding bigger closet, moving toilet, changing bathroom layout as stated on plans (page 6).Details
first floor master bathroom remodel; moving tub, sink, adding bigger closet, moving toilet, changing bathroom layout as stated on plans (page 6). | $40,000 |
| Jun 23, 2011 | Completed final sign-off Nov 2011 | 166 Arguello Bl | demo 2 extg bathrooms,lower portion of extg conditioned space and garage floor. add new stairs,2 new bathrooms, plumbing, electrical work. new exterior doors and windows, plumbing, electrical heat under sep. trade permit. replace garage door.Details
demo 2 extg bathrooms,lower portion of extg conditioned space and garage floor. add new stairs,2 new bathrooms, plumbing, electrical work. new exterior doors and windows, plumbing, electrical heat under sep. trade permit. replace garage door. | $100,000 |
| Apr 25, 2011 | Completed final sign-off Dec 2012 | 2672 Sacramento St | relocate unit at 1st floor to basement. combine 1st & 2nd flr into one unit. fill in light wells at east 9 west excavote rear yard and provide one level addition and roof deck with patio. remodel kitchens and bathrooms.Details
relocate unit at 1st floor to basement. combine 1st & 2nd flr into one unit. fill in light wells at east 9 west excavote rear yard and provide one level addition and roof deck with patio. remodel kitchens and bathrooms. | $250,000 |