Rico's General Construction
- Based in
- El Sobrante
- On San Francisco permits
- Apr 2011 to Aug 2026
- Last 24 months
- 6 permits filed
100 permits since 2000: 63 completed, 5 in progress, 17 never finaled, 15 expired or cancelled.
Of the 17 never-finaled permits, 14 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
6 roof deck permits: 3 completed, 3 in progress. Typically 218 days from filing to permit and 307 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 11, 2025 | In progress issued Aug 2025 | 680 Connecticut St | interior remodel and roof deck set back on all sides, no changes to front facade. replace deck and stair with new stairs to back yard. increase 504 sqft. converting garage to habitable space.Details
interior remodel and roof deck set back on all sides, no changes to front facade. replace deck and stair with new stairs to back yard. increase 504 sqft. converting garage to habitable space. | $250,000 |
| May 14, 2025 | In progress issued Oct 2025 | 7 Bennington St | remodel & vertical expansion of an (e)single family dwelling structure,including a modification of a small portion of the ground fl,modification of the (e)2nd fl,addition of a new 3rd fl and a small roof deck,modification of front & rear facades,& addition of a small rear deckDetails
remodel & vertical expansion of an (e)single family dwelling structure,including a modification of a small portion of the ground fl,modification of the (e)2nd fl,addition of a new 3rd fl and a small roof deck,modification of front & rear facades,& addition of a small rear deck | $558,000 |
| Jun 23, 2022 | In progress issued Jul 2025 | 945 Minnesota St | comply w/ complalint #202290991 for 945-947 minnesota - exceeding scope of work, re-frame damaged area of building @ back of the building. horizontal addition. complete remodel on all floors. new stair at rear. new roof deck.Details
comply w/ complalint #202290991 for 945-947 minnesota - exceeding scope of work, re-frame damaged area of building @ back of the building. horizontal addition. complete remodel on all floors. new stair at rear. new roof deck. | $20,000 |
| Oct 22, 2018 | Completed final sign-off Nov 2022 | 1582 Dolores St | (n) roof deck on 2nd storyDetails
(n) roof deck on 2nd story | $10,000 |
| Nov 22, 2017 | Completed final sign-off Jan 2020 | 2567 Union St | revision to 201308063602. remove window leading to (e) power and proposed elevator shaft. add 1 window @ front facade. add 5 wood windows, 1 door and alter 4 wood windows along west elevation. convert office to bedroom at 1/f. new roof deck.Details
revision to 201308063602. remove window leading to (e) power and proposed elevator shaft. add 1 window @ front facade. add 5 wood windows, 1 door and alter 4 wood windows along west elevation. convert office to bedroom at 1/f. new roof deck. | $6,000 |
| Apr 25, 2011 | Completed final sign-off Dec 2012 | 2672 Sacramento St | relocate unit at 1st floor to basement. combine 1st & 2nd flr into one unit. fill in light wells at east 9 west excavote rear yard and provide one level addition and roof deck with patio. remodel kitchens and bathrooms.Details
relocate unit at 1st floor to basement. combine 1st & 2nd flr into one unit. fill in light wells at east 9 west excavote rear yard and provide one level addition and roof deck with patio. remodel kitchens and bathrooms. | $250,000 |