Back to kitchen remodel contractors
Rico's General Construction
- Based in
- El Sobrante
- On San Francisco permits
- Apr 2011 to Aug 2026
- Last 24 months
- 6 permits filed
100 permits since 2000: 63 completed, 5 in progress, 17 never finaled, 15 expired or cancelled.
Of the 17 never-finaled permits, 14 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
12 kitchen remodel permits: 11 completed, 1 expired or cancelled. Typically 158 days from filing to permit and 281 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 4, 2021 | Completed final sign-off Mar 2023 | 211 Nevada St | 2 story horizontal addition at rear of existing single family, includes kitchen over bedrooms.Details
2 story horizontal addition at rear of existing single family, includes kitchen over bedrooms. | $140,000 |
| Feb 26, 2021 | Expired or cancelled cancelled Jan 2026 | 98 Mullen Av | 950 sf 1-story vertical addition to an existing 1-story-over-garage. new int stair to be constructed from basement to lv 2, kitchen moved from lv 1 to lv 2, new bathrooms to be constructed on lv 1 and lv 2, structural repairs in basement, ext stair to be modified to enter through basement, existingDetails
950 sf 1-story vertical addition to an existing 1-story-over-garage. new int stair to be constructed from basement to lv 2, kitchen moved from lv 1 to lv 2, new bathrooms to be constructed on lv 1 and lv 2, structural repairs in basement, ext stair to be modified to enter through basement, existing | $200,000 |
| Oct 10, 2020 | Completed final sign-off May 2022 | 1523 26th Av | remodel of 2-story home. excavation @ 1st fl (& portion of rear yard) to increase ceiling height over portion of fl; relocate 1st fl bath & laundry; replace interior stair w/ (n) stair; remodel kitchen, bath, & half bath on 2nd fl; replace windows on rear facade & in south lightwell. mep separateDetails
remodel of 2-story home. excavation @ 1st fl (& portion of rear yard) to increase ceiling height over portion of fl; relocate 1st fl bath & laundry; replace interior stair w/ (n) stair; remodel kitchen, bath, & half bath on 2nd fl; replace windows on rear facade & in south lightwell. mep separate | $250,000 |
| Feb 27, 2020 | Completed final sign-off Oct 2023 | 2231 Steiner St | renovation work @ 2nd & 3rd fl @ (2)(e) residential units. work to include (n) living space @ 2nd fl & (n) master bathroom & expanded kitchen space @ 3rd flDetails
renovation work @ 2nd & 3rd fl @ (2)(e) residential units. work to include (n) living space @ 2nd fl & (n) master bathroom & expanded kitchen space @ 3rd fl | $125,000 |
| Oct 16, 2018 | Completed final sign-off Nov 2022 | 1580 Dolores St | interior ti of all 3 flrs. work incl (n) stair openings, kitchen and bathroom relocation, (n) mster suite.Details
interior ti of all 3 flrs. work incl (n) stair openings, kitchen and bathroom relocation, (n) mster suite. | |
| May 14, 2018 | Completed final sign-off Mar 2019 | 1030 Fell St | remodel one bathroom and kitchen in unit #4. comply with nov # 201853445. no change in walls and openings layout. n/a maherDetails
remodel one bathroom and kitchen in unit #4. comply with nov # 201853445. no change in walls and openings layout. n/a maher | $15,000 |
| Dec 11, 2017 | Completed final sign-off Apr 2018 | 129 17th Av | revision to pa#201709137945, per correction issued 12/8/2017; full kitchen, bathroom & laundry remodel, no structural workDetails
revision to pa#201709137945, per correction issued 12/8/2017; full kitchen, bathroom & laundry remodel, no structural work | $45,000 |
| Sep 13, 2017 | Completed final sign-off Apr 2018 | 129 17th Av | new kitchen cabinets, appliances and finishesDetails
new kitchen cabinets, appliances and finishes | $5,000 |
| Apr 20, 2017 | Completed final sign-off Jan 2021 | 248 Prospect Av | excavate for basement level remodel, 1st floor remodel, 2nd story (n) 700 ft vertical addition with (n) kitchen, (n) bath & (n) great room. reepair rear deck & stairs not to exceed 50% in kind as required.Details
excavate for basement level remodel, 1st floor remodel, 2nd story (n) 700 ft vertical addition with (n) kitchen, (n) bath & (n) great room. reepair rear deck & stairs not to exceed 50% in kind as required. | $200,000 |
| Oct 11, 2013 | Completed final sign-off Feb 2014 | 85 Marcela Av | kitchen remodel and new bathroom on first floorDetails
kitchen remodel and new bathroom on first floor | $35,000 |
| Jun 27, 2013 | Completed final sign-off Dec 2013 | 1234 Page St | ground floor lower unit - new drywall throughout unit, studs repairs in kind for dryrot damage, plbg upgrade on bathroom & kitchen, electrical upgrade throuhout unit, replace widnows (4) & doors (6) in kind, new moldings, new cabinets & countertop.Details
ground floor lower unit - new drywall throughout unit, studs repairs in kind for dryrot damage, plbg upgrade on bathroom & kitchen, electrical upgrade throuhout unit, replace widnows (4) & doors (6) in kind, new moldings, new cabinets & countertop. | $30,000 |
| Apr 25, 2011 | Completed final sign-off Dec 2012 | 2672 Sacramento St | relocate unit at 1st floor to basement. combine 1st & 2nd flr into one unit. fill in light wells at east 9 west excavote rear yard and provide one level addition and roof deck with patio. remodel kitchens and bathrooms.Details
relocate unit at 1st floor to basement. combine 1st & 2nd flr into one unit. fill in light wells at east 9 west excavote rear yard and provide one level addition and roof deck with patio. remodel kitchens and bathrooms. | $250,000 |