Planart Construction Corp
- Based in
- San Francisco
- On San Francisco permits
- May 2010 to Jul 2026
- Last 24 months
- 24 permits filed
197 permits since 2000: 121 completed, 21 in progress, 44 never finaled, 11 expired or cancelled.
Of the 44 never-finaled permits, 11 are 3 to 5 years old, 16 are 5 to 10 years old, 17 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
45 stairs permits: 28 completed, 4 in progress, 10 never finaled, 3 expired or cancelled. Typically 63 days from filing to permit and 462 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 24, 2026 | In progress issued Jul 2026 | 624 46th Av | 1st fl - relocate garage door, recycle area, laundry, mechanical room & storage. new bathroom, new multi use room & bedroom; 2nd fl - upgrade stair way, convert (e) dining room into kitchen and kitchen into dining room; roof - add new skylights. (e) curb to remain unchanged.Details
1st fl - relocate garage door, recycle area, laundry, mechanical room & storage. new bathroom, new multi use room & bedroom; 2nd fl - upgrade stair way, convert (e) dining room into kitchen and kitchen into dining room; roof - add new skylights. (e) curb to remain unchanged. | $120,000 |
| Feb 27, 2026 | In progress issued Feb 2026 | 624 46th Av | renovate laundry room in ground floor,in kind, replace garage slab in kind. 4" min., 10 mil vapor barrier, #4 rebar 12" o.c. and repair interior existing stairs in kind, less than 50%. no structural work. install dryer per cmc 504.4 and 502.2.1. all work like-to-like.Details
renovate laundry room in ground floor,in kind, replace garage slab in kind. 4" min., 10 mil vapor barrier, #4 rebar 12" o.c. and repair interior existing stairs in kind, less than 50%. no structural work. install dryer per cmc 504.4 and 502.2.1. all work like-to-like. | $45,000 |
| Jan 8, 2026 | In progress issued Jul 2026 | 83 Mirabel Av | vertical addition. renovation throughout (e) 1st & 2nd floor. horizontal addition @ rear. 3rd story addition includes new kitchen, bath & living space. new rear yard stairs & deck require for fire access & secondary egress. new siding, doors, windows & roof. no work within rear yard setback.Details
vertical addition. renovation throughout (e) 1st & 2nd floor. horizontal addition @ rear. 3rd story addition includes new kitchen, bath & living space. new rear yard stairs & deck require for fire access & secondary egress. new siding, doors, windows & roof. no work within rear yard setback. | $475,000 |
| Oct 27, 2025 | In progress issued Jan 2026 | 348 Cumberland St | conversion of 356 sf of (e) garage to living area. reconfiguration of (e) interior stair between first and second fls. remodel of (e) 2nd fl kitchen & bath.Details
conversion of 356 sf of (e) garage to living area. reconfiguration of (e) interior stair between first and second fls. remodel of (e) 2nd fl kitchen & bath. | $250,000 |
| Apr 10, 2025 | Completed final sign-off Nov 2025 | 877 Alvarado St | replace (4) windows on back side and repair dry rot around opening. replace exterior siding. repair dry rot in front stairs.Details
replace (4) windows on back side and repair dry rot around opening. replace exterior siding. repair dry rot in front stairs. | $40,000 |
| Feb 4, 2025 | Completed final sign-off Aug 2026 | 101 Casitas Av | comply to nov 202305469. rebuild south wall of 3rd fl. rebuilt roof framing, rebuild half of ceiling framing @ 3rd floor. all due to fallen tree. rebuilt internal main stairs of building due to water damage. framing only. no finishes.Details
comply to nov 202305469. rebuild south wall of 3rd fl. rebuilt roof framing, rebuild half of ceiling framing @ 3rd floor. all due to fallen tree. rebuilt internal main stairs of building due to water damage. framing only. no finishes. | $130,000 |
| Jul 26, 2024 | Completed final sign-off Sep 2026 | 85 Mirabel Av | revision to bpa# 202303103513: remove the new stair connection north of gird line a from the scope of work. the rest of the project is as proposed per original project.Details
revision to bpa# 202303103513: remove the new stair connection north of gird line a from the scope of work. the rest of the project is as proposed per original project. | |
| May 22, 2024 | Completed final sign-off Aug 2024 | 341 Cornwall St | replace 8 front windows. paint front and side of the house. rpair rotten front stairs - less than 50%.Details
replace 8 front windows. paint front and side of the house. rpair rotten front stairs - less than 50%. | $50,000 |
| Mar 10, 2023 | Completed final sign-off Sep 2026 | 85 Mirabel Av | addition consists of bay windows over sidewalk. widened garage door, new entry, roof deck on 3rd flr facing rear yard. new firewall @ new stair & deck. new hardscape deck @ rear. new stair connection to rear yard terraces & stairs.Details
addition consists of bay windows over sidewalk. widened garage door, new entry, roof deck on 3rd flr facing rear yard. new firewall @ new stair & deck. new hardscape deck @ rear. new stair connection to rear yard terraces & stairs. | $600,000 |
| Sep 15, 2022 | Expired or cancelled withdrawn Jun 2024 | 624 46th Av | 1/f:laundry mech room,storage,(n) bath,relocate stairs; 2/f:relocate stair to 1/f,(n) stiar to3/f.convert livingroom into fam room,convert (e) kitchen in master bath,w.i. closet.3/f:(n)floor vertical expansion,relocate kitchen,dining living,new powder room,(n) rear and front deck,(n) spiral stairs.Details
1/f:laundry mech room,storage,(n) bath,relocate stairs; 2/f:relocate stair to 1/f,(n) stiar to3/f.convert livingroom into fam room,convert (e) kitchen in master bath,w.i. closet.3/f:(n)floor vertical expansion,relocate kitchen,dining living,new powder room,(n) rear and front deck,(n) spiral stairs. | $200,000 |
| Sep 14, 2022 | Never finaled issued May 2023, no final | 53 Martha Av | excavation to retaining wall to generate workshop rm. (n) bathrm, remodel stairs to access (n) mezzanine. create (n) mezzanine behind garage to a gym, bathrm & storage. 2nd fl:convert kitchen,dining & living to (n) bedrms & bathrm. 3rd fl:convert bedrm 1, master bedrm & closet to kitchen,dining &Details
excavation to retaining wall to generate workshop rm. (n) bathrm, remodel stairs to access (n) mezzanine. create (n) mezzanine behind garage to a gym, bathrm & storage. 2nd fl:convert kitchen,dining & living to (n) bedrms & bathrm. 3rd fl:convert bedrm 1, master bedrm & closet to kitchen,dining & | $100,000 |
| Aug 4, 2022 | Completed final sign-off Feb 2025 | 839 Edinburgh St | to comply with nov202292967: front entry stair way rebuild in-kind.use the existing terrazo steps.Details
to comply with nov202292967: front entry stair way rebuild in-kind.use the existing terrazo steps. | $8,000 |
| Jun 7, 2022 | Never finaled issued Mar 2023, no final | 3014 Sacramento St | rev to pa201912311052:(e) front/rear stairs to remain,no (n) entry doory & stairs to upper unit.int remodel:(n) kitchenette & access to storage in lower unit.relocate kitchen in upper unit.no new finished attic. new skylights in upper unit.no new entry door&stairs to upper unit,(e) stair to remain.Details
rev to pa201912311052:(e) front/rear stairs to remain,no (n) entry doory & stairs to upper unit.int remodel:(n) kitchenette & access to storage in lower unit.relocate kitchen in upper unit.no new finished attic. new skylights in upper unit.no new entry door&stairs to upper unit,(e) stair to remain. | |
| May 23, 2022 | Never finaled filed May 2022, never issued | 411 Edna St | remodel existing sfd to include:new low-sloped nroof at (e)bedroom,new front dormer expansion,new interior stair well to 3rd fl,new infill @ corner of 2nd fl,new interior layout,plumbing & electrical work via separate permit. revision to bpa #2017/07141958.planning prj#2021-008884.Details
remodel existing sfd to include:new low-sloped nroof at (e)bedroom,new front dormer expansion,new interior stair well to 3rd fl,new infill @ corner of 2nd fl,new interior layout,plumbing & electrical work via separate permit. revision to bpa #2017/07141958.planning prj#2021-008884. | $15,000 |
| May 5, 2022 | Never finaled issued May 2022, no final | 1930 12th Av | new laundry, mud room, bathroom, bedrooms, office, webbar on ground floor only. relocate the staircase and maintain spatial connection between the 1st and 2nd fl. no stove on the ground floor.Details
new laundry, mud room, bathroom, bedrooms, office, webbar on ground floor only. relocate the staircase and maintain spatial connection between the 1st and 2nd fl. no stove on the ground floor. | $250,000 |
| Feb 25, 2022 | Expired or cancelled expired Nov 2025 | 1915 Sacramento St | excavate (e) crawlspace to replace (e) damaged foundations. add new staircase & elevator access from garage to main house. infill (e) lightwell. replace 1st fl rear bay wall. change interior layout. replace (e) windows w/ fullwood. add insulation at walls. re-frame damaged garage roof.Details
excavate (e) crawlspace to replace (e) damaged foundations. add new staircase & elevator access from garage to main house. infill (e) lightwell. replace 1st fl rear bay wall. change interior layout. replace (e) windows w/ fullwood. add insulation at walls. re-frame damaged garage roof. | $700,000 |
| Apr 8, 2021 | Completed final sign-off Jan 2023 | 504 02nd Av | 1/f: new gym, bathroom, storage area, laundry, new rear patio by grade; 2/f: open stairway access to connect w/1/f; 3/f: no work in this areaDetails
1/f: new gym, bathroom, storage area, laundry, new rear patio by grade; 2/f: open stairway access to connect w/1/f; 3/f: no work in this area | $100,000 |
| Feb 18, 2021 | Never finaled issued Jun 2021, no final | 1830 09th Av | 1st fl: add new bathroom under extg deck at rear area, expand construction area below the extg area at southwest side and convert into new family room. add nw laundry, rebuild extg stairway in accomodance to code. 2nd fl: remodel extg kitchen, relocate extg powder room. 3rd fl: no work in this areaDetails
1st fl: add new bathroom under extg deck at rear area, expand construction area below the extg area at southwest side and convert into new family room. add nw laundry, rebuild extg stairway in accomodance to code. 2nd fl: remodel extg kitchen, relocate extg powder room. 3rd fl: no work in this area | $120,000 |
| Nov 18, 2020 | Completed final sign-off Apr 2023 | 57 Bessie St | new 12" mat slab foundation w/ crawl space, media room deepened 2' 6" below street level & relocating internal stair opening from ground floor. interior work only. no changes to exterior.Details
new 12" mat slab foundation w/ crawl space, media room deepened 2' 6" below street level & relocating internal stair opening from ground floor. interior work only. no changes to exterior. | $230,000 |
| Oct 24, 2020 | Completed final sign-off Mar 2024 | 25 Conrad St | interior remodel of kitchen & bathrooms, new skylights on roof not visit from street. all new exterior fenestrations. new stairs to basement.Details
interior remodel of kitchen & bathrooms, new skylights on roof not visit from street. all new exterior fenestrations. new stairs to basement. | $225,000 |
| Sep 24, 2020 | Completed final sign-off Nov 2022 | 363 Polaris Wy | 1/f: add living room, bathroom & kitchen. remodel (e) stairs. 2/f: remodel bedrooms, relocate bathrooms, relocate washer/dryer. remodel stairs. no change of use. single family only. no kitchen at second level (wet bar only).Details
1/f: add living room, bathroom & kitchen. remodel (e) stairs. 2/f: remodel bedrooms, relocate bathrooms, relocate washer/dryer. remodel stairs. no change of use. single family only. no kitchen at second level (wet bar only). | $100,000 |
| Sep 15, 2020 | Expired or cancelled cancelled Jan 2026 | 1310 Sanchez St | renovation to garage to include leveling floor throughout, addition of bath & laundry, added work space, renovated backyard access & addition of stairway from garage to floor through existing lightwell.Details
renovation to garage to include leveling floor throughout, addition of bath & laundry, added work space, renovated backyard access & addition of stairway from garage to floor through existing lightwell. | $100,000 |
| Dec 31, 2019 | Never finaled issued Jun 2022, no final | 3014 Sacramento St | rear building: demo existing stairs in front & back of upper unit. new door & stairs to upper unit. interior remodel of both units, finish attic, new skylights for upper unit. voluntary strengthening.Details
rear building: demo existing stairs in front & back of upper unit. new door & stairs to upper unit. interior remodel of both units, finish attic, new skylights for upper unit. voluntary strengthening. | $75,000 |
| Oct 25, 2019 | Completed final sign-off Jul 2022 | 3524 Fulton St | seismic upgrade @ basement. basement addition to extent deck, includes bed, multipurpose and new bath. add new internal stair to basement. kitchen remodel & new windows. deck & exterior stairs within existing footprint.Details
seismic upgrade @ basement. basement addition to extent deck, includes bed, multipurpose and new bath. add new internal stair to basement. kitchen remodel & new windows. deck & exterior stairs within existing footprint. | $340,000 |
| Jun 7, 2019 | Completed final sign-off Apr 2022 | 3015 Franklin St | rev to pa# 201905231584; 1st fl. add (n) office in garage area, relocate (e) bathroom, relocate (e) laundry, repair (e) exterior stairway (3 levels) - 2nd fl. remodel (e) kitchen, remodel (e) bedrooms area, add (n) master bath into (e) sun room, remodel (e) bathroom, 3rd fl: remodel (e) kitchen,Details
rev to pa# 201905231584; 1st fl. add (n) office in garage area, relocate (e) bathroom, relocate (e) laundry, repair (e) exterior stairway (3 levels) - 2nd fl. remodel (e) kitchen, remodel (e) bedrooms area, add (n) master bath into (e) sun room, remodel (e) bathroom, 3rd fl: remodel (e) kitchen, | $140,000 |
| May 22, 2019 | Completed final sign-off Nov 2021 | 3500 22nd St | exterior remodel to store front and entryway. accessible business entry retrofit. new ceramic tile on wainscot and entry. terazzo stair replacement.Details
exterior remodel to store front and entryway. accessible business entry retrofit. new ceramic tile on wainscot and entry. terazzo stair replacement. | $25,000 |
| Nov 13, 2018 | Completed final sign-off Oct 2019 | 3441 Clay St | attic work: revision to pemit #201808076694, inspector ask for permitted dwgs: (remodel existing bathroom, repair stairway, replace plaster for new drywall, replace existing sklights, add 3 new skylights). no structural work. no work in common areas inside unit only.Details
attic work: revision to pemit #201808076694, inspector ask for permitted dwgs: (remodel existing bathroom, repair stairway, replace plaster for new drywall, replace existing sklights, add 3 new skylights). no structural work. no work in common areas inside unit only. | $5,000 |
| Aug 7, 2018 | Completed final sign-off Oct 2019 | 3441 Clay St | repair and upgrade stairway to the attic area. same size like for like. remodel existing bathroom @ attic area. replace existing skylight (6 units) upgrade electric system at attic area. repair drywall and insulation at attic area. no structural work under this permit.Details
repair and upgrade stairway to the attic area. same size like for like. remodel existing bathroom @ attic area. replace existing skylight (6 units) upgrade electric system at attic area. repair drywall and insulation at attic area. no structural work under this permit. | $30,000 |
| Dec 21, 2017 | Completed final sign-off Mar 2019 | 333 Madison St | interior renovation to add 2br/1ba to first floor unfinished space. small infill addition at rear, new stairs and reconfiguration of uper living area, new windows & siding, new steps down to rear yard.Details
interior renovation to add 2br/1ba to first floor unfinished space. small infill addition at rear, new stairs and reconfiguration of uper living area, new windows & siding, new steps down to rear yard. | $150,000 |
| Jul 14, 2017 | Never finaled issued Oct 2018, no final | 411 Edna St | remodel main floor. raise entire structure +/-6" for headroom at (n) lower bedroom. reconfigure front stairs.Details
remodel main floor. raise entire structure +/-6" for headroom at (n) lower bedroom. reconfigure front stairs. | $200,000 |
| Jul 6, 2016 | Completed final sign-off Jul 2018 | 707 03rd Av | horizontal addition at the rear yard of a 1 fam dwg. additional sq footage added at level one, 2 & 3 new fam rm & bath at level 1. new exterior stair from level 2 to back yard. new master suite level 3, relocate (e) powder room at level 2Details
horizontal addition at the rear yard of a 1 fam dwg. additional sq footage added at level one, 2 & 3 new fam rm & bath at level 1. new exterior stair from level 2 to back yard. new master suite level 3, relocate (e) powder room at level 2 | $250,000 |
| Jul 23, 2015 | Completed final sign-off May 2017 | 1523 Shafter Av | replace rear area due to structural damage. replace foundation. remodel lower floor, remodel upper floor. gr fl add full bath, and bedroom, remove stair, add family room under ex sunroom.2nd fl convert sunroom to kitchen. remodel 1 bath, add full bath, add 1 bedroom. windows at rear. rear balconyDetails
replace rear area due to structural damage. replace foundation. remodel lower floor, remodel upper floor. gr fl add full bath, and bedroom, remove stair, add family room under ex sunroom.2nd fl convert sunroom to kitchen. remodel 1 bath, add full bath, add 1 bedroom. windows at rear. rear balcony | $120,000 |
| Aug 12, 2014 | Completed final sign-off Oct 2014 | 34 Heather Av | 2 bathrooms remodel (in kind); repair interior walls and stairway, new electrical at area of work. to comply with cec 150.0(k)5Details
2 bathrooms remodel (in kind); repair interior walls and stairway, new electrical at area of work. to comply with cec 150.0(k)5 | $20,000 |
| Jun 16, 2014 | Never finaled issued Jul 2014, no final | 2434 Leavenworth St | 2nd flr: convert (e) master bathrm into (n) master bathroom, 2nd bathroom, laundry, closet. repl (e) stairway to attic. attic replace (e) stairway, (n) roof over stairway, (n) electric, dry wall replacementDetails
2nd flr: convert (e) master bathrm into (n) master bathroom, 2nd bathroom, laundry, closet. repl (e) stairway to attic. attic replace (e) stairway, (n) roof over stairway, (n) electric, dry wall replacement | $30,000 |
| Jun 16, 2014 | Completed final sign-off Sep 2015 | 922 Minnesota St | work @ 1st flr only (except stairway 2nd flr), convert (e) study family rm into (n) master suite, relocate (e) bathroom, new laundry, water heater, replace stairwayDetails
work @ 1st flr only (except stairway 2nd flr), convert (e) study family rm into (n) master suite, relocate (e) bathroom, new laundry, water heater, replace stairway | $40,000 |
| Apr 11, 2014 | Completed final sign-off Feb 2015 | 2298 Cecilia Av | amendment and addition to 201308063623. redesign interior stairway to meet code regulations. remodel existing master bath at 3rd fl. remodel existing bath #2 at 3rd flDetails
amendment and addition to 201308063623. redesign interior stairway to meet code regulations. remodel existing master bath at 3rd fl. remodel existing bath #2 at 3rd fl | $15,000 |
| Apr 7, 2014 | Never finaled issued Jul 2015, no final | 1219 Cole St | interior renovation & vertical & horizontal expansion of (e) single family residence. remodel kitchen, bathrooms, (n) interior staircase, (n) 4th fl master suite w/ roof deck.Details
interior renovation & vertical & horizontal expansion of (e) single family residence. remodel kitchen, bathrooms, (n) interior staircase, (n) 4th fl master suite w/ roof deck. | $175,000 |
| Feb 19, 2014 | Completed final sign-off Jun 2016 | 625 11th Av | rear addition to extend (e) 1st & 2nd floor. construct new family room, bedroom & bathroom on 1st fl. (e) 2nd fl sunroom to be extended to new family room. new stair connect 1st & 2nd floor.Details
rear addition to extend (e) 1st & 2nd floor. construct new family room, bedroom & bathroom on 1st fl. (e) 2nd fl sunroom to be extended to new family room. new stair connect 1st & 2nd floor. | $52,000 |
| Oct 22, 2013 | Never finaled issued Oct 2013, no final | 38 Heather Av | to add (n) internal stairway between 1/f and 2/f; remodel 2 bathrooms work to occur on the 1st and 2nd floors all within unit-a.Details
to add (n) internal stairway between 1/f and 2/f; remodel 2 bathrooms work to occur on the 1st and 2nd floors all within unit-a. | $20,000 |
| Aug 6, 2013 | Completed final sign-off Feb 2015 | 2298 Cecilia Av | 1st fl interior remodel, new stairway, new bedroom, bathroom, and family room. 2nd fl: remodel e kitchen, relocate powder roomDetails
1st fl interior remodel, new stairway, new bedroom, bathroom, and family room. 2nd fl: remodel e kitchen, relocate powder room | $90,000 |
| Sep 18, 2012 | Completed final sign-off Jul 2013 | 861 Alvarado St | rev to 2012/05/16/0624, 2011/12/22/1190: 1st fl: convert(e) storage area into(n)bedroom,enlarge kitchen,reloc mech room to attic.non struc bathroom layout chg.redesign&reduce rear deck.new stairway to attic space.attic rehabilitatn; new bedroom,bathrm&family rm.Details
rev to 2012/05/16/0624, 2011/12/22/1190: 1st fl: convert(e) storage area into(n)bedroom,enlarge kitchen,reloc mech room to attic.non struc bathroom layout chg.redesign&reduce rear deck.new stairway to attic space.attic rehabilitatn; new bedroom,bathrm&family rm. | $30,000 |
| Feb 7, 2012 | Completed final sign-off Nov 2012 | 575 11th Av | ground floor rehabilitation - (n) study, (n) family room, (n) bathroom. replace (e) stairway, structural strengthing, additional foundation slab upgrade, widen garage door to 10 ft.Details
ground floor rehabilitation - (n) study, (n) family room, (n) bathroom. replace (e) stairway, structural strengthing, additional foundation slab upgrade, widen garage door to 10 ft. | $60,000 |
| Jan 4, 2012 | Completed final sign-off Apr 2013 | 2163 Filbert St | change of use. at 1st floor to day care center. partial demo @ rear area - new covered passage way-new ramp (ada). interior repair- remove rear stairway, partitions and cabinets. complete sprinkler and fire alarm on both floors on separate permit.Details
change of use. at 1st floor to day care center. partial demo @ rear area - new covered passage way-new ramp (ada). interior repair- remove rear stairway, partitions and cabinets. complete sprinkler and fire alarm on both floors on separate permit. | $40,000 |
| Sep 2, 2011 | Completed final sign-off Apr 2013 | 166 19th Av | create new garden room behind garage/new roof deck at rear. relocate extg bathroom. replace extg windows in kind. replace extg stairs in kind at rear.Details
create new garden room behind garage/new roof deck at rear. relocate extg bathroom. replace extg windows in kind. replace extg stairs in kind at rear. | $50,000 |
| Jan 18, 2011 | Completed final sign-off Jul 2011 | 1010 Balboa St | 1st fl-voluntary lateral grade, new garage door, replace stairway, replace k.a.v water heater. 2nd fl-kitchen remodeling-add powder room. 3rd fl-remode (e) bathroom, new master bathroom closet. upgrade electrical system in house.Details
1st fl-voluntary lateral grade, new garage door, replace stairway, replace k.a.v water heater. 2nd fl-kitchen remodeling-add powder room. 3rd fl-remode (e) bathroom, new master bathroom closet. upgrade electrical system in house. | $70,000 |