Back to kitchen remodel contractors
Planart Construction Corp
- Based in
- San Francisco
- On San Francisco permits
- May 2010 to Jul 2026
- Last 24 months
- 24 permits filed
197 permits since 2000: 121 completed, 21 in progress, 44 never finaled, 11 expired or cancelled.
Of the 44 never-finaled permits, 11 are 3 to 5 years old, 16 are 5 to 10 years old, 17 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
54 kitchen remodel permits: 34 completed, 3 in progress, 12 never finaled, 5 expired or cancelled. Typically 13 days from filing to permit and 333 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 24, 2026 | In progress issued Jul 2026 | 624 46th Av | 1st fl - relocate garage door, recycle area, laundry, mechanical room & storage. new bathroom, new multi use room & bedroom; 2nd fl - upgrade stair way, convert (e) dining room into kitchen and kitchen into dining room; roof - add new skylights. (e) curb to remain unchanged.Details
1st fl - relocate garage door, recycle area, laundry, mechanical room & storage. new bathroom, new multi use room & bedroom; 2nd fl - upgrade stair way, convert (e) dining room into kitchen and kitchen into dining room; roof - add new skylights. (e) curb to remain unchanged. | $120,000 |
| Jan 8, 2026 | In progress issued Jul 2026 | 83 Mirabel Av | vertical addition. renovation throughout (e) 1st & 2nd floor. horizontal addition @ rear. 3rd story addition includes new kitchen, bath & living space. new rear yard stairs & deck require for fire access & secondary egress. new siding, doors, windows & roof. no work within rear yard setback.Details
vertical addition. renovation throughout (e) 1st & 2nd floor. horizontal addition @ rear. 3rd story addition includes new kitchen, bath & living space. new rear yard stairs & deck require for fire access & secondary egress. new siding, doors, windows & roof. no work within rear yard setback. | $475,000 |
| Oct 27, 2025 | In progress issued Jan 2026 | 348 Cumberland St | conversion of 356 sf of (e) garage to living area. reconfiguration of (e) interior stair between first and second fls. remodel of (e) 2nd fl kitchen & bath.Details
conversion of 356 sf of (e) garage to living area. reconfiguration of (e) interior stair between first and second fls. remodel of (e) 2nd fl kitchen & bath. | $250,000 |
| Oct 16, 2023 | Completed final sign-off Mar 2024 | 56 Beaver St | remodel kitchen in kind : coutertop, cabinets, appliances, tiling, sink- no plans, no structural work. no moving wall.Details
remodel kitchen in kind : coutertop, cabinets, appliances, tiling, sink- no plans, no structural work. no moving wall. | $50,000 |
| Aug 15, 2023 | Completed final sign-off Jul 2024 | 1116 Balboa St | remodel (e) 1 kitchen, 1 laundry and 1 powder room in-kind no structural work new appliances, cabinets, electrical and plumbing. no alteration of wall, window, or door.Details
remodel (e) 1 kitchen, 1 laundry and 1 powder room in-kind no structural work new appliances, cabinets, electrical and plumbing. no alteration of wall, window, or door. | $80,000 |
| Sep 15, 2022 | Expired or cancelled withdrawn Jun 2024 | 624 46th Av | 1/f:laundry mech room,storage,(n) bath,relocate stairs; 2/f:relocate stair to 1/f,(n) stiar to3/f.convert livingroom into fam room,convert (e) kitchen in master bath,w.i. closet.3/f:(n)floor vertical expansion,relocate kitchen,dining living,new powder room,(n) rear and front deck,(n) spiral stairs.Details
1/f:laundry mech room,storage,(n) bath,relocate stairs; 2/f:relocate stair to 1/f,(n) stiar to3/f.convert livingroom into fam room,convert (e) kitchen in master bath,w.i. closet.3/f:(n)floor vertical expansion,relocate kitchen,dining living,new powder room,(n) rear and front deck,(n) spiral stairs. | $200,000 |
| Sep 14, 2022 | Never finaled issued May 2023, no final | 53 Martha Av | excavation to retaining wall to generate workshop rm. (n) bathrm, remodel stairs to access (n) mezzanine. create (n) mezzanine behind garage to a gym, bathrm & storage. 2nd fl:convert kitchen,dining & living to (n) bedrms & bathrm. 3rd fl:convert bedrm 1, master bedrm & closet to kitchen,dining &Details
excavation to retaining wall to generate workshop rm. (n) bathrm, remodel stairs to access (n) mezzanine. create (n) mezzanine behind garage to a gym, bathrm & storage. 2nd fl:convert kitchen,dining & living to (n) bedrms & bathrm. 3rd fl:convert bedrm 1, master bedrm & closet to kitchen,dining & | $100,000 |
| Aug 5, 2022 | Completed final sign-off Aug 2025 | 531 Kansas St | 1/f: remodel (e) bathroom, new office. 2/f: remodel (e) dining room and kitchen, rear wall and windows, door removal and add new double sliding door.Details
1/f: remodel (e) bathroom, new office. 2/f: remodel (e) dining room and kitchen, rear wall and windows, door removal and add new double sliding door. | $35,000 |
| Jun 7, 2022 | Never finaled issued Mar 2023, no final | 3014 Sacramento St | rev to pa201912311052:(e) front/rear stairs to remain,no (n) entry doory & stairs to upper unit.int remodel:(n) kitchenette & access to storage in lower unit.relocate kitchen in upper unit.no new finished attic. new skylights in upper unit.no new entry door&stairs to upper unit,(e) stair to remain.Details
rev to pa201912311052:(e) front/rear stairs to remain,no (n) entry doory & stairs to upper unit.int remodel:(n) kitchenette & access to storage in lower unit.relocate kitchen in upper unit.no new finished attic. new skylights in upper unit.no new entry door&stairs to upper unit,(e) stair to remain. | |
| Aug 3, 2021 | Completed final sign-off Nov 2023 | 715 Cole St | 1/f: add guest bedrm, bathrm, closet. extend (e) mechanical room. 2/f: expand kitchen, relocate dining room, convert bath into powder rm and closet. 3/f: remodel master bedrm, bathrm, remove chimney. roof replacementDetails
1/f: add guest bedrm, bathrm, closet. extend (e) mechanical room. 2/f: expand kitchen, relocate dining room, convert bath into powder rm and closet. 3/f: remodel master bedrm, bathrm, remove chimney. roof replacement | $150,000 |
| Jul 14, 2021 | Completed final sign-off Aug 2024 | 2864 Jackson St | nonstructural remodel (2) bathrooms & (1) kitchen, replacing in-kindDetails
nonstructural remodel (2) bathrooms & (1) kitchen, replacing in-kind | $50,000 |
| Feb 18, 2021 | Never finaled issued Jun 2021, no final | 1830 09th Av | 1st fl: add new bathroom under extg deck at rear area, expand construction area below the extg area at southwest side and convert into new family room. add nw laundry, rebuild extg stairway in accomodance to code. 2nd fl: remodel extg kitchen, relocate extg powder room. 3rd fl: no work in this areaDetails
1st fl: add new bathroom under extg deck at rear area, expand construction area below the extg area at southwest side and convert into new family room. add nw laundry, rebuild extg stairway in accomodance to code. 2nd fl: remodel extg kitchen, relocate extg powder room. 3rd fl: no work in this area | $120,000 |
| Jan 12, 2021 | Completed final sign-off Oct 2021 | 208 Joost Av | remodel kitchen an bathroom in kind, all new cabinets and appliances, upgrade kitchen electrical, all walls reain in placeDetails
remodel kitchen an bathroom in kind, all new cabinets and appliances, upgrade kitchen electrical, all walls reain in place | $25,000 |
| Nov 25, 2020 | Completed final sign-off Mar 2022 | 2318 09th Av | 1/f: add new bathroom, laundry and activity room. 2/f: remodel (e) kitchen, living room & bathroom. 3/f: remodel (e) bedrooms and bathrooms.Details
1/f: add new bathroom, laundry and activity room. 2/f: remodel (e) kitchen, living room & bathroom. 3/f: remodel (e) bedrooms and bathrooms. | $90,000 |
| Oct 24, 2020 | Completed final sign-off Mar 2024 | 25 Conrad St | interior remodel of kitchen & bathrooms, new skylights on roof not visit from street. all new exterior fenestrations. new stairs to basement.Details
interior remodel of kitchen & bathrooms, new skylights on roof not visit from street. all new exterior fenestrations. new stairs to basement. | $225,000 |
| Sep 24, 2020 | Completed final sign-off Nov 2022 | 363 Polaris Wy | 1/f: add living room, bathroom & kitchen. remodel (e) stairs. 2/f: remodel bedrooms, relocate bathrooms, relocate washer/dryer. remodel stairs. no change of use. single family only. no kitchen at second level (wet bar only).Details
1/f: add living room, bathroom & kitchen. remodel (e) stairs. 2/f: remodel bedrooms, relocate bathrooms, relocate washer/dryer. remodel stairs. no change of use. single family only. no kitchen at second level (wet bar only). | $100,000 |
| Sep 23, 2020 | Completed final sign-off Aug 2021 | 2151 Sacramento St | n nunit 2. 1st flr. remodel kitchen and bathroom, laundry, remodel bedroom for window access.Details
n nunit 2. 1st flr. remodel kitchen and bathroom, laundry, remodel bedroom for window access. | $40,000 |
| Aug 27, 2020 | Never finaled filed Aug 2020, never issued | 254 12th Av | 1st fl: remodel kitchen, add bedroom, great room & patio. 2nd fl: remodel kitchen, dining room, and deck. 3rd fl: add master bedroom, master bath, balcony, & skylights. all of which results to a rear addition.Details
1st fl: remodel kitchen, add bedroom, great room & patio. 2nd fl: remodel kitchen, dining room, and deck. 3rd fl: add master bedroom, master bath, balcony, & skylights. all of which results to a rear addition. | $200,000 |
| Dec 18, 2019 | Completed final sign-off May 2021 | 4 Cortes Av | remodel to existing kitchen & breakfast room. replace (e) window in kind.Details
remodel to existing kitchen & breakfast room. replace (e) window in kind. | $50,000 |
| Nov 26, 2019 | Never finaled issued Jun 2021, no final | 547 09th Av | 1st fl: structural work to support changes at 2nd fl. 2nd fl. remodel kitchen dinning room, relocate powder room, remove (e) wall to open kitchen area, 3rd fl. remove chiminey and cover into (n) closet areaDetails
1st fl: structural work to support changes at 2nd fl. 2nd fl. remodel kitchen dinning room, relocate powder room, remove (e) wall to open kitchen area, 3rd fl. remove chiminey and cover into (n) closet area | $60,000 |
| Oct 25, 2019 | Completed final sign-off Jul 2022 | 3524 Fulton St | seismic upgrade @ basement. basement addition to extent deck, includes bed, multipurpose and new bath. add new internal stair to basement. kitchen remodel & new windows. deck & exterior stairs within existing footprint.Details
seismic upgrade @ basement. basement addition to extent deck, includes bed, multipurpose and new bath. add new internal stair to basement. kitchen remodel & new windows. deck & exterior stairs within existing footprint. | $340,000 |
| Jun 21, 2019 | Completed final sign-off Apr 2020 | 247 Liberty St | kitchen and bath remodel, in-kind, like for likeDetails
kitchen and bath remodel, in-kind, like for like | $80,000 |
| Jun 7, 2019 | Completed final sign-off Apr 2022 | 3015 Franklin St | rev to pa# 201905231584; 1st fl. add (n) office in garage area, relocate (e) bathroom, relocate (e) laundry, repair (e) exterior stairway (3 levels) - 2nd fl. remodel (e) kitchen, remodel (e) bedrooms area, add (n) master bath into (e) sun room, remodel (e) bathroom, 3rd fl: remodel (e) kitchen,Details
rev to pa# 201905231584; 1st fl. add (n) office in garage area, relocate (e) bathroom, relocate (e) laundry, repair (e) exterior stairway (3 levels) - 2nd fl. remodel (e) kitchen, remodel (e) bedrooms area, add (n) master bath into (e) sun room, remodel (e) bathroom, 3rd fl: remodel (e) kitchen, | $140,000 |
| Jun 7, 2019 | Completed final sign-off Oct 2020 | 1354 21st Av | 1st fl.- add (n) family room into (e) laundry area, relocate laundry room, update (e) bathroom, update (e) bedroom, 2nd fl.- udate (e) kitchenDetails
1st fl.- add (n) family room into (e) laundry area, relocate laundry room, update (e) bathroom, update (e) bedroom, 2nd fl.- udate (e) kitchen | $100,000 |
| May 23, 2019 | Completed final sign-off Apr 2022 | 3017 Franklin St | kitchen remodeling, in-kind.Details
kitchen remodeling, in-kind. | $25,000 |
| Feb 26, 2019 | Never finaled issued Feb 2019, no final | 1809 Page St | remodel 1 bath full, 1 powder room and 1 kitchen. plumbing to remain, new electrical . no structural work.Details
remodel 1 bath full, 1 powder room and 1 kitchen. plumbing to remain, new electrical . no structural work. | $50,000 |
| Aug 3, 2018 | Never finaled issued Aug 2018, no final | 746 Divisadero St | removing (e) sun room at rear, renovations of (e) kitchen and bathrooms, revised room layout, associated structural improvements to (e) framing *note; 2nd floorDetails
removing (e) sun room at rear, renovations of (e) kitchen and bathrooms, revised room layout, associated structural improvements to (e) framing *note; 2nd floor | $150,000 |
| May 22, 2018 | Completed final sign-off Jan 2019 | 4026 24th St | tenant improvement of (e) shell to inlcude; commercial kitchen; trash room; food storage, walk in cooler/freezer; interior remodel for restaurantDetails
tenant improvement of (e) shell to inlcude; commercial kitchen; trash room; food storage, walk in cooler/freezer; interior remodel for restaurant | $265,000 |
| Apr 20, 2018 | Completed final sign-off Sep 2018 | 166 19th Av | remodel (e) kitchen in kind. new cabinets & appliances. paint front facadeDetails
remodel (e) kitchen in kind. new cabinets & appliances. paint front facade | $30,000 |
| Mar 27, 2018 | Completed final sign-off Aug 2021 | 3258 Lyon St | horizontal addition @ 1st & 3rd fl. general remodel to relocate kitchen, living & dining to 1st fl. add remodel (e) bathrooms.Details
horizontal addition @ 1st & 3rd fl. general remodel to relocate kitchen, living & dining to 1st fl. add remodel (e) bathrooms. | $585,000 |
| Dec 15, 2017 | Completed final sign-off Nov 2018 | 1754 Grove St | remodel e bath, kitchen, powder rm, remodel closets, add laundry, add glass door at rear sunroomDetails
remodel e bath, kitchen, powder rm, remodel closets, add laundry, add glass door at rear sunroom | $60,000 |
| Nov 7, 2017 | Completed final sign-off Oct 2018 | 317 Cherry St | interior alterations at lower unit: remodel bathrooms, kitchen and bedrooms. no work proposed on other floors. n/a for maherDetails
interior alterations at lower unit: remodel bathrooms, kitchen and bedrooms. no work proposed on other floors. n/a for maher | $20,000 |
| Jun 6, 2017 | Expired or cancelled expired Nov 2018 | 451 17th Av | to comply with nov #201782601. 1st fl: (n) gym rm, replace water heater and furnace. 2nd fl: remodel kitchen, (n) powder rm & studio. 3rd fl: convert (e) bathroom into (n) master suite & 2nd bath; add (n) laundry and closets.Details
to comply with nov #201782601. 1st fl: (n) gym rm, replace water heater and furnace. 2nd fl: remodel kitchen, (n) powder rm & studio. 3rd fl: convert (e) bathroom into (n) master suite & 2nd bath; add (n) laundry and closets. | $100,000 |
| May 16, 2017 | Completed final sign-off Sep 2018 | 451 17th Av | demo and removal of plaster in garage. partial interior demo in kitchen and bathroom only.Details
demo and removal of plaster in garage. partial interior demo in kitchen and bathroom only. | $8,000 |
| Apr 5, 2017 | Expired or cancelled cancelled Jan 2026 | 1568 08th Av | 1st fl convert e area into new inlaw unit. remodel bath and add new kitchen in e living area. 2nd fl remodel kitchen, convert e living and dining rm into bedrooms, convert e bedroom into dining rm, open kitchen aerea to integrate great rmDetails
1st fl convert e area into new inlaw unit. remodel bath and add new kitchen in e living area. 2nd fl remodel kitchen, convert e living and dining rm into bedrooms, convert e bedroom into dining rm, open kitchen aerea to integrate great rm | $120,000 |
| Jan 17, 2017 | Completed final sign-off Oct 2017 | 504 02nd Av | interior remodel with four new windows and one exterior door at rear facade includes: new kitchen, new powder room, division of upper level to include 2 bedrooms & 1 new bathrooms. installation of 2 new skylights. removal of extg walls on main floor & new beams to replace.Details
interior remodel with four new windows and one exterior door at rear facade includes: new kitchen, new powder room, division of upper level to include 2 bedrooms & 1 new bathrooms. installation of 2 new skylights. removal of extg walls on main floor & new beams to replace. | $65,000 |
| Aug 23, 2016 | Never finaled issued Sep 2016, no final | 131 Chaves Av | 1st flr: convert (e)storage space into (n) 2 bedrooms,1 bathroom & laundry. 2nd flr: kitchen remodel,relocate bathroom, remodel bedrooms,add attic access.Details
1st flr: convert (e)storage space into (n) 2 bedrooms,1 bathroom & laundry. 2nd flr: kitchen remodel,relocate bathroom, remodel bedrooms,add attic access. | $120,000 |
| Aug 12, 2016 | Completed final sign-off Mar 2017 | 1400 Webster St | unit 3: kitchen &2 batrms remodeling, no charnge in wall and opening layout. kitchen remodel - replace in kind, counter, sink, cabinets put in new tiling, dishwasher, washer/dryer (electric) exhaust hood (vent-less). bathroom remodel: replace in kind toilets, tubs. install shower pan. upgradeDetails
unit 3: kitchen &2 batrms remodeling, no charnge in wall and opening layout. kitchen remodel - replace in kind, counter, sink, cabinets put in new tiling, dishwasher, washer/dryer (electric) exhaust hood (vent-less). bathroom remodel: replace in kind toilets, tubs. install shower pan. upgrade | $100,000 |
| Jul 13, 2016 | Never finaled issued Jul 2016, no final | 1622 Greenwich St | kitchen remodel, in-kind, with new electrical. replace unit's furnace. no change on walls.Details
kitchen remodel, in-kind, with new electrical. replace unit's furnace. no change on walls. | $12,000 |
| Jul 23, 2015 | Completed final sign-off May 2017 | 1523 Shafter Av | replace rear area due to structural damage. replace foundation. remodel lower floor, remodel upper floor. gr fl add full bath, and bedroom, remove stair, add family room under ex sunroom.2nd fl convert sunroom to kitchen. remodel 1 bath, add full bath, add 1 bedroom. windows at rear. rear balconyDetails
replace rear area due to structural damage. replace foundation. remodel lower floor, remodel upper floor. gr fl add full bath, and bedroom, remove stair, add family room under ex sunroom.2nd fl convert sunroom to kitchen. remodel 1 bath, add full bath, add 1 bedroom. windows at rear. rear balcony | $120,000 |
| Apr 28, 2015 | Completed final sign-off Oct 2020 | 701 Minnesota St | #206 - kitchen countertop replacement, under cabients lighting & bathroom remodeling.Details
#206 - kitchen countertop replacement, under cabients lighting & bathroom remodeling. | $2,000 |
| Apr 27, 2015 | Expired or cancelled expired Nov 2018 | 683 09th Av | comply w/nov 201539751- int. remodel: (n) bedroom & bath @ 1st flr. (n) power room @ 2nd flr, kitchen remodel; convert (e) bath @ 3rf flr into (n) master bath & (n) 2nd bath, (n) electrical system, replace plaster w/drywall 80% of the house.Details
comply w/nov 201539751- int. remodel: (n) bedroom & bath @ 1st flr. (n) power room @ 2nd flr, kitchen remodel; convert (e) bath @ 3rf flr into (n) master bath & (n) 2nd bath, (n) electrical system, replace plaster w/drywall 80% of the house. | $180,000 |
| Feb 2, 2015 | Completed final sign-off May 2015 | 1390 Fell St | unit #3: kitchen remodeling in kind. replace finishes and fixtures only. n0 walls to be moved and no structural work.Details
unit #3: kitchen remodeling in kind. replace finishes and fixtures only. n0 walls to be moved and no structural work. | $15,000 |
| Feb 2, 2015 | Completed final sign-off May 2015 | 821 Folsom St | unit #306: kitchen remodeling in kind. replace finishes and fixtures only. n0 walls to be moved and no structural work.n/a for the maher.Details
unit #306: kitchen remodeling in kind. replace finishes and fixtures only. n0 walls to be moved and no structural work.n/a for the maher. | $15,000 |
| May 12, 2014 | Never finaled issued Jul 2015, no final | 281 32nd Av | vertical addition. 1st floor: new bedroom, bathroom & family room & laundry. 2nd floor: remodel bathroom, bedroom & kitchen. 3rd floor: new master suite (new floor).Details
vertical addition. 1st floor: new bedroom, bathroom & family room & laundry. 2nd floor: remodel bathroom, bedroom & kitchen. 3rd floor: new master suite (new floor). | $160,000 |
| Apr 7, 2014 | Never finaled issued Jul 2015, no final | 1219 Cole St | interior renovation & vertical & horizontal expansion of (e) single family residence. remodel kitchen, bathrooms, (n) interior staircase, (n) 4th fl master suite w/ roof deck.Details
interior renovation & vertical & horizontal expansion of (e) single family residence. remodel kitchen, bathrooms, (n) interior staircase, (n) 4th fl master suite w/ roof deck. | $175,000 |
| Jan 21, 2014 | Expired or cancelled expired Mar 2016 | 247 Hartford St | 1st floor interior bathroom addition and kitchen alteration with partial wall removal.Details
1st floor interior bathroom addition and kitchen alteration with partial wall removal. | $65,000 |
| Dec 3, 2013 | Never finaled issued Jul 2014, no final | 134 05th Av | addition to back of house on 2nd & 3rd fl includes renovated kitchen, (n) deck, (n) master bathroom on 3rd level, renovated master bedroom on 3rd level.Details
addition to back of house on 2nd & 3rd fl includes renovated kitchen, (n) deck, (n) master bathroom on 3rd level, renovated master bedroom on 3rd level. | $175,000 |
| Aug 6, 2013 | Completed final sign-off Feb 2015 | 2298 Cecilia Av | 1st fl interior remodel, new stairway, new bedroom, bathroom, and family room. 2nd fl: remodel e kitchen, relocate powder roomDetails
1st fl interior remodel, new stairway, new bedroom, bathroom, and family room. 2nd fl: remodel e kitchen, relocate powder room | $90,000 |
| Sep 18, 2012 | Completed final sign-off Jul 2013 | 861 Alvarado St | rev to 2012/05/16/0624, 2011/12/22/1190: 1st fl: convert(e) storage area into(n)bedroom,enlarge kitchen,reloc mech room to attic.non struc bathroom layout chg.redesign&reduce rear deck.new stairway to attic space.attic rehabilitatn; new bedroom,bathrm&family rm.Details
rev to 2012/05/16/0624, 2011/12/22/1190: 1st fl: convert(e) storage area into(n)bedroom,enlarge kitchen,reloc mech room to attic.non struc bathroom layout chg.redesign&reduce rear deck.new stairway to attic space.attic rehabilitatn; new bedroom,bathrm&family rm. | $30,000 |
| Jul 11, 2012 | Completed final sign-off Jan 2013 | 2504 Bush St | kitchen remodel on 2nd floor, powder room remodel on 2nd floor, bathroom remodel on 3rd floor & add new bathroom in master suite on 3rd floorDetails
kitchen remodel on 2nd floor, powder room remodel on 2nd floor, bathroom remodel on 3rd floor & add new bathroom in master suite on 3rd floor | $25,000 |
| Apr 2, 2012 | Completed final sign-off Jan 2014 | 567 09th Av | 1st floor:habitable, add bathroom at basement, structural strengthening at 1st floor. enlarge garage door- kitchen remodeling. new powder room at 2nd floor. new master bathroom at 3rd floor in rear sunroom area.Details
1st floor:habitable, add bathroom at basement, structural strengthening at 1st floor. enlarge garage door- kitchen remodeling. new powder room at 2nd floor. new master bathroom at 3rd floor in rear sunroom area. | $80,000 |
| Sep 29, 2011 | Completed final sign-off Dec 2011 | 2445 Greenwich St | in - kind kitchen remodel. replace cabinets & counter.Details
in - kind kitchen remodel. replace cabinets & counter. | $8,000 |
| Jan 18, 2011 | Completed final sign-off Jul 2011 | 1010 Balboa St | 1st fl-voluntary lateral grade, new garage door, replace stairway, replace k.a.v water heater. 2nd fl-kitchen remodeling-add powder room. 3rd fl-remode (e) bathroom, new master bathroom closet. upgrade electrical system in house.Details
1st fl-voluntary lateral grade, new garage door, replace stairway, replace k.a.v water heater. 2nd fl-kitchen remodeling-add powder room. 3rd fl-remode (e) bathroom, new master bathroom closet. upgrade electrical system in house. | $70,000 |