Block 3656, lot 010
4026 24th St
- City’s use
- Multi-Family Residential
- Built
- 1924
- Stories
- 3
- Units
- 5
- Rooms
- 6 bedrooms, 5 bathrooms
- Building
- 6,844 sq ft
- Lot
- 2,848 sq ft
- Zoning
- 24NOE
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
22 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 8, 2019 | Completed final sign-off Jan 2019 | 4026 24th St | International Fire Equip | installation of ul300 fire system. ref #201805229760.Details
installation of ul300 fire system. ref #201805229760. | $5,500 |
| Nov 6, 2018 | Completed final sign-off Jan 2019 | 4026 24th St | Planart Construction Corp | revision to permit #201805229760. revision of main bar with reduction of equipment. change to be a serving counter only.Details
revision to permit #201805229760. revision of main bar with reduction of equipment. change to be a serving counter only. | |
| Sep 10, 2018 | Never finaled issued Sep 2018, no final | 4026 24th St | All Star Fire Protection Llc | relocate 4 heads. ref t.i pa 201805169526Details
relocate 4 heads. ref t.i pa 201805169526 | $2,800 |
| May 22, 2018 | Completed final sign-off Jan 2019 | 4026 24th St | Planart Construction Corp | tenant improvement of (e) shell to inlcude; commercial kitchen; trash room; food storage, walk in cooler/freezer; interior remodel for restaurantDetails
tenant improvement of (e) shell to inlcude; commercial kitchen; trash room; food storage, walk in cooler/freezer; interior remodel for restaurant | $265,000 |
| May 18, 2018 | Completed final sign-off Jan 2019 | 4026 24th St | Planart Construction Corp | ti of (e) commercial restaurant shell to include walls & counters for future restaurantDetails
ti of (e) commercial restaurant shell to include walls & counters for future restaurant | $100,000 |
| May 25, 2017 | Never finaled issued May 2017, no final | 4022 24th St | street spaceDetails
street space | ||
| Jan 31, 2017 | Never finaled issued Jan 2017, no final | 4022 24th St | street space permitDetails
street space permit | ||
| Jan 24, 2017 | Never finaled issued Jan 2017, no final | 4022 24th St | per pa #201405206229, add address to additional two units at block 3656, lot 010 as; 4022a, 4024a 24th streetDetails
per pa #201405206229, add address to additional two units at block 3656, lot 010 as; 4022a, 4024a 24th street | ||
| Dec 7, 2016 | Completed final sign-off Jun 2017 | 4022 24th St | San Francisco Fire Protection | ti 201405206229,201606220641;install new fire alarm system incl fire control panel,sd above & pull stn near panel.notif.appliances will be installed thru out.install monitor modules to tie in waterflow & tamper switch to new panel,install aes radio comm.Details
ti 201405206229,201606220641;install new fire alarm system incl fire control panel,sd above & pull stn near panel.notif.appliances will be installed thru out.install monitor modules to tie in waterflow & tamper switch to new panel,install aes radio comm. | $7,300 |
| Jul 25, 2016 | Never finaled issued Jul 2016, no final | 4022 24th St | street spaceDetails
street space | ||
| Jun 22, 2016 | Completed final sign-off Jul 2017 | 4022 24th St | Fong's Construction & Plumbing | ref pa# 2014-0520-6229-s install nfpa-13 fire sprinkler system throughout building including underground fire service, total sprinklers 86.Details
ref pa# 2014-0520-6229-s install nfpa-13 fire sprinkler system throughout building including underground fire service, total sprinklers 86. | $44,720 |
| Aug 26, 2015 | Completed final sign-off Jun 2016 | 4022 24th St | Pacific General Construction | shoring: soldier pile and wood lagging shoring on sides and back rear of lot. ref to pa#201405206229Details
shoring: soldier pile and wood lagging shoring on sides and back rear of lot. ref to pa#201405206229 | $15,000 |
| May 4, 2015 | Expired or cancelled cancelled Jul 2017 | 4026 24th St | Pacific General Construction | fire rapair only. remove and replace damaged materials in kind.Details
fire rapair only. remove and replace damaged materials in kind. | $200,000 |
| May 20, 2014 | Completed final sign-off Jul 2017 | 4022 24th St | Pacific General Construction, Eignor Construction Inc. | renovation of (e) mixed-use bldg: repair fire damage throughout, structural upgrade, horizontal addition to rear, increase in dwelling unit form 2 to 4, (n) roof deck & stair cabins, plumbing & elctrical work (via) separate permit.Details
renovation of (e) mixed-use bldg: repair fire damage throughout, structural upgrade, horizontal addition to rear, increase in dwelling unit form 2 to 4, (n) roof deck & stair cabins, plumbing & elctrical work (via) separate permit. | $745,000 |
| Apr 18, 2013 | Completed final sign-off Jul 2013 | 4022 24th St | remodel appliances to comply with complaint #201389471, plumbing permit: cap gas and ewater, legalized with permits when the building is renovated from fire damage. cabinets, electr work were done with permit.Details
remodel appliances to comply with complaint #201389471, plumbing permit: cap gas and ewater, legalized with permits when the building is renovated from fire damage. cabinets, electr work were done with permit. | $100 | |
| Mar 10, 2008 | Never finaled issued Mar 2008, no final | 4022 24th St | street space & sidewalk.Details
street space & sidewalk. | ||
| Feb 12, 2008 | Never finaled issued Feb 2008, no final | 4022 24th St | sidewalk onlyDetails
sidewalk only | ||
| Jan 17, 2006 | Completed final sign-off Jan 2006 | 4022 24th St | install counter & cabinets in living room alcove for both units.Details
install counter & cabinets in living room alcove for both units. | $2,500 | |
| May 13, 2005 | Completed final sign-off Jan 2006 | 4022 24th St | convesrt 2 single family res. to 2 congregate res.convert (e) "studio"to bedrooms w/new fire egressDetails
convesrt 2 single family res. to 2 congregate res.convert (e) "studio"to bedrooms w/new fire egress | $1,500 | |
| Dec 10, 2004 | Completed final sign-off Jan 2006 | 4022 24th St | add 1 new bedroom and bathroom, remodel kitchen for new dining roomDetails
add 1 new bedroom and bathroom, remodel kitchen for new dining room | $20,000 | |
| Sep 20, 2004 | Never finaled issued Sep 2004, no final | 4024 24th St | add one new bedroom & bathroom, relocate kitchen and bedroom # 3 and create dining / family roomDetails
add one new bedroom & bathroom, relocate kitchen and bedroom # 3 and create dining / family room | $25,000 | |
| Apr 30, 2001 | Completed final sign-off Jun 2001 | 4022 24th St | remodeling kitchen,bathrm,repair (e)stairs; repl 15 stepsDetails
remodeling kitchen,bathrm,repair (e)stairs; repl 15 steps | $9,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Pacific General Construction (3), Planart Construction Corp (3), All Star Fire Protection Llc, Eignor Construction Inc., Fong's Construction & Plumbing, International Fire Equip, San Francisco Fire Protection
- Architects
- Ross Levy (4), Alan K. Toma (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.