Planart Construction Corp
- Based in
- San Francisco
- On San Francisco permits
- May 2010 to Jul 2026
- Last 24 months
- 24 permits filed
197 permits since 2000: 121 completed, 21 in progress, 44 never finaled, 11 expired or cancelled.
Of the 44 never-finaled permits, 11 are 3 to 5 years old, 16 are 5 to 10 years old, 17 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
16 deck permits: 6 completed, 4 in progress, 4 never finaled, 2 expired or cancelled. Typically 84 days from filing to permit and 264 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 1, 2026 | In progress issued Sep 2026 | 969 Treat Av | install a retractable shade structure with fire-retardant fabric including all required mounting hardware and attachements in the second level deck.Details
install a retractable shade structure with fire-retardant fabric including all required mounting hardware and attachements in the second level deck. | $20,000 |
| May 21, 2026 | In progress issued May 2026 | 290 Rutledge St | remodel of sfd, new wood siding in place of (e) , remodel (e) 3rd floor bathroom (in kind replacement of fixtures). replacement 3rd floor window (not street visible), new decking at 3rd floor deck (not street visible)Details
remodel of sfd, new wood siding in place of (e) , remodel (e) 3rd floor bathroom (in kind replacement of fixtures). replacement 3rd floor window (not street visible), new decking at 3rd floor deck (not street visible) | $50,000 |
| Feb 13, 2026 | In progress issued Jul 2026 | 1559 Willard St | replacement of door for wider sliding door & replacement of window and lowering sill. expansion of existing deck to include lower level with a hot tubDetails
replacement of door for wider sliding door & replacement of window and lowering sill. expansion of existing deck to include lower level with a hot tub | $45,000 |
| Jan 8, 2026 | In progress issued Jul 2026 | 83 Mirabel Av | vertical addition. renovation throughout (e) 1st & 2nd floor. horizontal addition @ rear. 3rd story addition includes new kitchen, bath & living space. new rear yard stairs & deck require for fire access & secondary egress. new siding, doors, windows & roof. no work within rear yard setback.Details
vertical addition. renovation throughout (e) 1st & 2nd floor. horizontal addition @ rear. 3rd story addition includes new kitchen, bath & living space. new rear yard stairs & deck require for fire access & secondary egress. new siding, doors, windows & roof. no work within rear yard setback. | $475,000 |
| Jun 30, 2025 | Completed final sign-off May 2026 | 420 Monterey Bl | existing front decks to be replaced in original location and size. front windows and doors to be replaced in existing openings. existing wood siding to remain and be painted.Details
existing front decks to be replaced in original location and size. front windows and doors to be replaced in existing openings. existing wood siding to remain and be painted. | $30,000 |
| Feb 21, 2025 | Completed final sign-off Aug 2025 | 531 Kansas St | replace front deck tile, repair/replace front exterior mouldings, paint front facade. remodel 3rd floor hall bath in kind - no structural work.Details
replace front deck tile, repair/replace front exterior mouldings, paint front facade. remodel 3rd floor hall bath in kind - no structural work. | $40,000 |
| Sep 15, 2022 | Expired or cancelled withdrawn Jun 2024 | 624 46th Av | 1/f:laundry mech room,storage,(n) bath,relocate stairs; 2/f:relocate stair to 1/f,(n) stiar to3/f.convert livingroom into fam room,convert (e) kitchen in master bath,w.i. closet.3/f:(n)floor vertical expansion,relocate kitchen,dining living,new powder room,(n) rear and front deck,(n) spiral stairs.Details
1/f:laundry mech room,storage,(n) bath,relocate stairs; 2/f:relocate stair to 1/f,(n) stiar to3/f.convert livingroom into fam room,convert (e) kitchen in master bath,w.i. closet.3/f:(n)floor vertical expansion,relocate kitchen,dining living,new powder room,(n) rear and front deck,(n) spiral stairs. | $200,000 |
| Apr 29, 2022 | Completed final sign-off Aug 2024 | 2864 Jackson St | revision to pa# 202103176770 per field inspector comments to revise roof framing, add 1-hr rated wall at (e) 4th fl deck & revised 4th fl framing.Details
revision to pa# 202103176770 per field inspector comments to revise roof framing, add 1-hr rated wall at (e) 4th fl deck & revised 4th fl framing. | |
| Feb 18, 2021 | Never finaled issued Jun 2021, no final | 1830 09th Av | 1st fl: add new bathroom under extg deck at rear area, expand construction area below the extg area at southwest side and convert into new family room. add nw laundry, rebuild extg stairway in accomodance to code. 2nd fl: remodel extg kitchen, relocate extg powder room. 3rd fl: no work in this areaDetails
1st fl: add new bathroom under extg deck at rear area, expand construction area below the extg area at southwest side and convert into new family room. add nw laundry, rebuild extg stairway in accomodance to code. 2nd fl: remodel extg kitchen, relocate extg powder room. 3rd fl: no work in this area | $120,000 |
| Dec 14, 2020 | Expired or cancelled cancelled Jan 2026 | 88 Manchester St | remodel garage, add actificty room & bathroom, relocate w/d enclose area. relocate (e) deck for office, remodel ktichen & living room, bedrooms, remove (e) skylights & add new. add powder room.Details
remodel garage, add actificty room & bathroom, relocate w/d enclose area. relocate (e) deck for office, remodel ktichen & living room, bedrooms, remove (e) skylights & add new. add powder room. | $140,000 |
| Aug 27, 2020 | Never finaled filed Aug 2020, never issued | 254 12th Av | 1st fl: remodel kitchen, add bedroom, great room & patio. 2nd fl: remodel kitchen, dining room, and deck. 3rd fl: add master bedroom, master bath, balcony, & skylights. all of which results to a rear addition.Details
1st fl: remodel kitchen, add bedroom, great room & patio. 2nd fl: remodel kitchen, dining room, and deck. 3rd fl: add master bedroom, master bath, balcony, & skylights. all of which results to a rear addition. | $200,000 |
| Oct 25, 2019 | Completed final sign-off Jul 2022 | 3524 Fulton St | seismic upgrade @ basement. basement addition to extent deck, includes bed, multipurpose and new bath. add new internal stair to basement. kitchen remodel & new windows. deck & exterior stairs within existing footprint.Details
seismic upgrade @ basement. basement addition to extent deck, includes bed, multipurpose and new bath. add new internal stair to basement. kitchen remodel & new windows. deck & exterior stairs within existing footprint. | $340,000 |
| Sep 23, 2014 | Completed final sign-off Jul 2015 | 41 Wilder St | convert existing unconditioned space on 1st floor to master suite with (n) deck. (6" above grade).Details
convert existing unconditioned space on 1st floor to master suite with (n) deck. (6" above grade). | $48,000 |
| Dec 3, 2013 | Never finaled issued Jul 2014, no final | 134 05th Av | addition to back of house on 2nd & 3rd fl includes renovated kitchen, (n) deck, (n) master bathroom on 3rd level, renovated master bedroom on 3rd level.Details
addition to back of house on 2nd & 3rd fl includes renovated kitchen, (n) deck, (n) master bathroom on 3rd level, renovated master bedroom on 3rd level. | $175,000 |
| Sep 18, 2012 | Completed final sign-off Jul 2013 | 861 Alvarado St | rev to 2012/05/16/0624, 2011/12/22/1190: 1st fl: convert(e) storage area into(n)bedroom,enlarge kitchen,reloc mech room to attic.non struc bathroom layout chg.redesign&reduce rear deck.new stairway to attic space.attic rehabilitatn; new bedroom,bathrm&family rm.Details
rev to 2012/05/16/0624, 2011/12/22/1190: 1st fl: convert(e) storage area into(n)bedroom,enlarge kitchen,reloc mech room to attic.non struc bathroom layout chg.redesign&reduce rear deck.new stairway to attic space.attic rehabilitatn; new bedroom,bathrm&family rm. | $30,000 |
| Aug 30, 2012 | Never finaled issued Sep 2012, no final | 341 Cornwall St | interior remodel, rear back wall replacement due to structural failure and leaking, new windows and doors, finishes, electrical, plumbing, raise (e) back deck, new enclosure 60 sf under existing 3rd fl roomDetails
interior remodel, rear back wall replacement due to structural failure and leaking, new windows and doors, finishes, electrical, plumbing, raise (e) back deck, new enclosure 60 sf under existing 3rd fl room | $175,000 |