197 permits since 2000: 121 completed, 21 in progress, 44 never finaled, 11 expired or cancelled.
Of the 44 never-finaled permits, 11 are 3 to 5 years old, 16 are 5 to 10 years old, 17 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
92 bathroom remodel permits: 57 completed, 8 in progress, 19 never finaled, 8 expired or cancelled. Typically 5 days from filing to permit and 377 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 27, 2026 | In progress issued Jul 2026 | 1665 Filbert St | replace wet bar cabinets and sink (additional) revise the scope of work from 4 bathrooms to 2 bathrooms from permit pa#202512151941. the bathrooms on the 3rd floor will not be remodeled. only the ground floor bathrooms are on the new scope of work.Details
replace wet bar cabinets and sink (additional) revise the scope of work from 4 bathrooms to 2 bathrooms from permit pa#202512151941. the bathrooms on the 3rd floor will not be remodeled. only the ground floor bathrooms are on the new scope of work. | |
| Jun 24, 2026 | In progress issued Jul 2026 | 624 46th Av | 1st fl - relocate garage door, recycle area, laundry, mechanical room & storage. new bathroom, new multi use room & bedroom; 2nd fl - upgrade stair way, convert (e) dining room into kitchen and kitchen into dining room; roof - add new skylights. (e) curb to remain unchanged.Details
1st fl - relocate garage door, recycle area, laundry, mechanical room & storage. new bathroom, new multi use room & bedroom; 2nd fl - upgrade stair way, convert (e) dining room into kitchen and kitchen into dining room; roof - add new skylights. (e) curb to remain unchanged. | $120,000 |
| May 21, 2026 | In progress issued May 2026 | 290 Rutledge St | remodel of sfd, new wood siding in place of (e) , remodel (e) 3rd floor bathroom (in kind replacement of fixtures). replacement 3rd floor window (not street visible), new decking at 3rd floor deck (not street visible)Details
remodel of sfd, new wood siding in place of (e) , remodel (e) 3rd floor bathroom (in kind replacement of fixtures). replacement 3rd floor window (not street visible), new decking at 3rd floor deck (not street visible) | $50,000 |
| Jan 8, 2026 | In progress issued Jul 2026 | 83 Mirabel Av | vertical addition. renovation throughout (e) 1st & 2nd floor. horizontal addition @ rear. 3rd story addition includes new kitchen, bath & living space. new rear yard stairs & deck require for fire access & secondary egress. new siding, doors, windows & roof. no work within rear yard setback.Details
vertical addition. renovation throughout (e) 1st & 2nd floor. horizontal addition @ rear. 3rd story addition includes new kitchen, bath & living space. new rear yard stairs & deck require for fire access & secondary egress. new siding, doors, windows & roof. no work within rear yard setback. | $475,000 |
| Dec 16, 2025 | In progress issued Dec 2025 | 1665 Filbert St | remodel existing ground floor bathrooms in kind (2 bathrooms) and 2 bathrooms on the 3rd floor in kind. maintain the current layout and configurations, no structural modifications. 4 bathrooms total. no change to floor layout. no change to wall layout. no structural work.Details
remodel existing ground floor bathrooms in kind (2 bathrooms) and 2 bathrooms on the 3rd floor in kind. maintain the current layout and configurations, no structural modifications. 4 bathrooms total. no change to floor layout. no change to wall layout. no structural work. | $100,000 |
| Dec 2, 2025 | In progress issued Dec 2025 | 2478 32nd Av | remodel the (e)bathroom on the ground-floor level inside master suite. replace bathroom window and patio door; like for like. no structural work. window is in back of home.Details
remodel the (e)bathroom on the ground-floor level inside master suite. replace bathroom window and patio door; like for like. no structural work. window is in back of home. | $50,000 |
| Oct 27, 2025 | In progress issued Jan 2026 | 348 Cumberland St | conversion of 356 sf of (e) garage to living area. reconfiguration of (e) interior stair between first and second fls. remodel of (e) 2nd fl kitchen & bath.Details
conversion of 356 sf of (e) garage to living area. reconfiguration of (e) interior stair between first and second fls. remodel of (e) 2nd fl kitchen & bath. | $250,000 |
| Apr 10, 2025 | Completed final sign-off Jul 2025 | 845 Oak St | remodel in kind (1) bathroom - no structural - 45 sq ftDetails
remodel in kind (1) bathroom - no structural - 45 sq ft | $20,000 |
| Feb 21, 2025 | Completed final sign-off Aug 2025 | 531 Kansas St | replace front deck tile, repair/replace front exterior mouldings, paint front facade. remodel 3rd floor hall bath in kind - no structural work.Details
replace front deck tile, repair/replace front exterior mouldings, paint front facade. remodel 3rd floor hall bath in kind - no structural work. | $40,000 |
| Jul 23, 2024 | Completed final sign-off Dec 2024 | 727 11th Av | lower level bathroom remodel - no structural work. all new plumbing fixtures, new electrical and plumbing including a shower pan.Details
lower level bathroom remodel - no structural work. all new plumbing fixtures, new electrical and plumbing including a shower pan. | $50,000 |
| Sep 13, 2023 | Completed final sign-off Jan 2024 | 182 Albion St | remodel of existing bathroom (in kind). no structural work.Details
remodel of existing bathroom (in kind). no structural work. | $21,000 |
| Aug 15, 2023 | Completed final sign-off May 2024 | 509 Cayuga Av | lover level remodel: no structural work. convert (e) bathroom into (n) laundry. convert (e) recreational room into (n) butler & pantry, recreational room and bedroom. add (n) bathroom replace windowsDetails
lover level remodel: no structural work. convert (e) bathroom into (n) laundry. convert (e) recreational room into (n) butler & pantry, recreational room and bedroom. add (n) bathroom replace windows | $40,000 |
| Jul 13, 2023 | Completed final sign-off Jan 2024 | 3441 Clay St | remodel bathroom 3rd level in kind. no structural work. no change walls.Details
remodel bathroom 3rd level in kind. no structural work. no change walls. | $50,000 |
| May 17, 2023 | Completed final sign-off Aug 2025 | 531 Kansas St | remodel of existing master bathroom in kind-3rd floor. no plans/ no structural work.Details
remodel of existing master bathroom in kind-3rd floor. no plans/ no structural work. | $25,000 |
| Mar 20, 2023 | Completed final sign-off Jul 2024 | 336 Cumberland St | 1/f: interior remodel. primary bedroom, primary bath, primary wic , desk area. 2/f: interior remodel. bath, sheetrock repair and paint.Details
1/f: interior remodel. primary bedroom, primary bath, primary wic , desk area. 2/f: interior remodel. bath, sheetrock repair and paint. | $200,000 |
| Sep 15, 2022 | Expired or cancelled withdrawn Jun 2024 | 624 46th Av | 1/f:laundry mech room,storage,(n) bath,relocate stairs; 2/f:relocate stair to 1/f,(n) stiar to3/f.convert livingroom into fam room,convert (e) kitchen in master bath,w.i. closet.3/f:(n)floor vertical expansion,relocate kitchen,dining living,new powder room,(n) rear and front deck,(n) spiral stairs.Details
1/f:laundry mech room,storage,(n) bath,relocate stairs; 2/f:relocate stair to 1/f,(n) stiar to3/f.convert livingroom into fam room,convert (e) kitchen in master bath,w.i. closet.3/f:(n)floor vertical expansion,relocate kitchen,dining living,new powder room,(n) rear and front deck,(n) spiral stairs. | $200,000 |
| Sep 14, 2022 | In progress issued Sep 2026 | 839 Edinburgh St | to comply with nov202294070/202292967: 1/f-remove (e) wall,family/game room,relocate bathroom, add (n) storage areas, rear horizontal addition for office & guest bedroom, new sunken patio. 2/f:interior remodel,(n) skylights,upgrade electrical system,rear horizontal addition for (n) master bedroom.Details
to comply with nov202294070/202292967: 1/f-remove (e) wall,family/game room,relocate bathroom, add (n) storage areas, rear horizontal addition for office & guest bedroom, new sunken patio. 2/f:interior remodel,(n) skylights,upgrade electrical system,rear horizontal addition for (n) master bedroom. | $100,000 |
| Aug 5, 2022 | Completed final sign-off Aug 2025 | 531 Kansas St | 1/f: remodel (e) bathroom, new office. 2/f: remodel (e) dining room and kitchen, rear wall and windows, door removal and add new double sliding door.Details
1/f: remodel (e) bathroom, new office. 2/f: remodel (e) dining room and kitchen, rear wall and windows, door removal and add new double sliding door. | $35,000 |
| May 19, 2022 | Completed final sign-off Oct 2022 | 174 Taraval St | bathroom remodeling in kind non structuralDetails
bathroom remodeling in kind non structural | $10,000 |
| May 16, 2022 | Never finaled issued May 2022, no final | 53 Martha Av | 1/f: revision to no-plan permit 202203089505 (non structural work). remove (e) fireplace and convert into new laundry area. 2/f: non-structural work. remodel (e) master bathroom and bathroom #1.Details
1/f: revision to no-plan permit 202203089505 (non structural work). remove (e) fireplace and convert into new laundry area. 2/f: non-structural work. remodel (e) master bathroom and bathroom #1. | |
| May 5, 2022 | Never finaled issued May 2022, no final | 1930 12th Av | new laundry, mud room, bathroom, bedrooms, office, webbar on ground floor only. relocate the staircase and maintain spatial connection between the 1st and 2nd fl. no stove on the ground floor.Details
new laundry, mud room, bathroom, bedrooms, office, webbar on ground floor only. relocate the staircase and maintain spatial connection between the 1st and 2nd fl. no stove on the ground floor. | $250,000 |
| Mar 8, 2022 | Never finaled issued Apr 2022, no final | 53 Martha Av | one master bathroom remodeling in kind at 2nd fl. non structuralDetails
one master bathroom remodeling in kind at 2nd fl. non structural | $8,000 |
| Aug 3, 2021 | Completed final sign-off Nov 2023 | 715 Cole St | 1/f: add guest bedrm, bathrm, closet. extend (e) mechanical room. 2/f: expand kitchen, relocate dining room, convert bath into powder rm and closet. 3/f: remodel master bedrm, bathrm, remove chimney. roof replacementDetails
1/f: add guest bedrm, bathrm, closet. extend (e) mechanical room. 2/f: expand kitchen, relocate dining room, convert bath into powder rm and closet. 3/f: remodel master bedrm, bathrm, remove chimney. roof replacement | $150,000 |
| Jul 14, 2021 | Completed final sign-off Aug 2024 | 2864 Jackson St | nonstructural remodel (2) bathrooms & (1) kitchen, replacing in-kindDetails
nonstructural remodel (2) bathrooms & (1) kitchen, replacing in-kind | $50,000 |
| Apr 8, 2021 | Completed final sign-off Jan 2023 | 504 02nd Av | 1/f: new gym, bathroom, storage area, laundry, new rear patio by grade; 2/f: open stairway access to connect w/1/f; 3/f: no work in this areaDetails
1/f: new gym, bathroom, storage area, laundry, new rear patio by grade; 2/f: open stairway access to connect w/1/f; 3/f: no work in this area | $100,000 |
| Feb 18, 2021 | Never finaled issued Jun 2021, no final | 1830 09th Av | 1st fl: add new bathroom under extg deck at rear area, expand construction area below the extg area at southwest side and convert into new family room. add nw laundry, rebuild extg stairway in accomodance to code. 2nd fl: remodel extg kitchen, relocate extg powder room. 3rd fl: no work in this areaDetails
1st fl: add new bathroom under extg deck at rear area, expand construction area below the extg area at southwest side and convert into new family room. add nw laundry, rebuild extg stairway in accomodance to code. 2nd fl: remodel extg kitchen, relocate extg powder room. 3rd fl: no work in this area | $120,000 |
| Jan 12, 2021 | Completed final sign-off Oct 2021 | 208 Joost Av | remodel kitchen an bathroom in kind, all new cabinets and appliances, upgrade kitchen electrical, all walls reain in placeDetails
remodel kitchen an bathroom in kind, all new cabinets and appliances, upgrade kitchen electrical, all walls reain in place | $25,000 |
| Dec 14, 2020 | Expired or cancelled cancelled Jan 2026 | 88 Manchester St | remodel garage, add actificty room & bathroom, relocate w/d enclose area. relocate (e) deck for office, remodel ktichen & living room, bedrooms, remove (e) skylights & add new. add powder room.Details
remodel garage, add actificty room & bathroom, relocate w/d enclose area. relocate (e) deck for office, remodel ktichen & living room, bedrooms, remove (e) skylights & add new. add powder room. | $140,000 |
| Nov 25, 2020 | Completed final sign-off Mar 2022 | 2318 09th Av | 1/f: add new bathroom, laundry and activity room. 2/f: remodel (e) kitchen, living room & bathroom. 3/f: remodel (e) bedrooms and bathrooms.Details
1/f: add new bathroom, laundry and activity room. 2/f: remodel (e) kitchen, living room & bathroom. 3/f: remodel (e) bedrooms and bathrooms. | $90,000 |
| Oct 24, 2020 | Completed final sign-off Mar 2024 | 25 Conrad St | interior remodel of kitchen & bathrooms, new skylights on roof not visit from street. all new exterior fenestrations. new stairs to basement.Details
interior remodel of kitchen & bathrooms, new skylights on roof not visit from street. all new exterior fenestrations. new stairs to basement. | $225,000 |
| Sep 24, 2020 | Completed final sign-off Nov 2022 | 363 Polaris Wy | 1/f: add living room, bathroom & kitchen. remodel (e) stairs. 2/f: remodel bedrooms, relocate bathrooms, relocate washer/dryer. remodel stairs. no change of use. single family only. no kitchen at second level (wet bar only).Details
1/f: add living room, bathroom & kitchen. remodel (e) stairs. 2/f: remodel bedrooms, relocate bathrooms, relocate washer/dryer. remodel stairs. no change of use. single family only. no kitchen at second level (wet bar only). | $100,000 |
| Sep 23, 2020 | Completed final sign-off Aug 2021 | 2151 Sacramento St | n nunit 2. 1st flr. remodel kitchen and bathroom, laundry, remodel bedroom for window access.Details
n nunit 2. 1st flr. remodel kitchen and bathroom, laundry, remodel bedroom for window access. | $40,000 |
| Sep 15, 2020 | Expired or cancelled cancelled Jan 2026 | 1310 Sanchez St | renovation to garage to include leveling floor throughout, addition of bath & laundry, added work space, renovated backyard access & addition of stairway from garage to floor through existing lightwell.Details
renovation to garage to include leveling floor throughout, addition of bath & laundry, added work space, renovated backyard access & addition of stairway from garage to floor through existing lightwell. | $100,000 |
| Aug 27, 2020 | Never finaled filed Aug 2020, never issued | 254 12th Av | 1st fl: remodel kitchen, add bedroom, great room & patio. 2nd fl: remodel kitchen, dining room, and deck. 3rd fl: add master bedroom, master bath, balcony, & skylights. all of which results to a rear addition.Details
1st fl: remodel kitchen, add bedroom, great room & patio. 2nd fl: remodel kitchen, dining room, and deck. 3rd fl: add master bedroom, master bath, balcony, & skylights. all of which results to a rear addition. | $200,000 |
| Feb 19, 2020 | Completed final sign-off Mar 2021 | 763 Andover St | 1st fl - remodel (e) bedroom, add new bathroom, family room & laundry; 2nd fl - remodel closets in (e) bedroomsDetails
1st fl - remodel (e) bedroom, add new bathroom, family room & laundry; 2nd fl - remodel closets in (e) bedrooms | $40,000 |
| Oct 25, 2019 | Completed final sign-off Jul 2022 | 3524 Fulton St | seismic upgrade @ basement. basement addition to extent deck, includes bed, multipurpose and new bath. add new internal stair to basement. kitchen remodel & new windows. deck & exterior stairs within existing footprint.Details
seismic upgrade @ basement. basement addition to extent deck, includes bed, multipurpose and new bath. add new internal stair to basement. kitchen remodel & new windows. deck & exterior stairs within existing footprint. | $340,000 |
| Jun 21, 2019 | Completed final sign-off Apr 2020 | 247 Liberty St | kitchen and bath remodel, in-kind, like for likeDetails
kitchen and bath remodel, in-kind, like for like | $80,000 |
| Jun 7, 2019 | Completed final sign-off Apr 2022 | 3015 Franklin St | rev to pa# 201905231584; 1st fl. add (n) office in garage area, relocate (e) bathroom, relocate (e) laundry, repair (e) exterior stairway (3 levels) - 2nd fl. remodel (e) kitchen, remodel (e) bedrooms area, add (n) master bath into (e) sun room, remodel (e) bathroom, 3rd fl: remodel (e) kitchen,Details
rev to pa# 201905231584; 1st fl. add (n) office in garage area, relocate (e) bathroom, relocate (e) laundry, repair (e) exterior stairway (3 levels) - 2nd fl. remodel (e) kitchen, remodel (e) bedrooms area, add (n) master bath into (e) sun room, remodel (e) bathroom, 3rd fl: remodel (e) kitchen, | $140,000 |
| Jun 7, 2019 | Completed final sign-off Oct 2020 | 1354 21st Av | 1st fl.- add (n) family room into (e) laundry area, relocate laundry room, update (e) bathroom, update (e) bedroom, 2nd fl.- udate (e) kitchenDetails
1st fl.- add (n) family room into (e) laundry area, relocate laundry room, update (e) bathroom, update (e) bedroom, 2nd fl.- udate (e) kitchen | $100,000 |
| Feb 26, 2019 | Never finaled issued Feb 2019, no final | 1809 Page St | remodel 1 bath full, 1 powder room and 1 kitchen. plumbing to remain, new electrical . no structural work.Details
remodel 1 bath full, 1 powder room and 1 kitchen. plumbing to remain, new electrical . no structural work. | $50,000 |
| Nov 13, 2018 | Completed final sign-off Oct 2019 | 3441 Clay St | attic work: revision to pemit #201808076694, inspector ask for permitted dwgs: (remodel existing bathroom, repair stairway, replace plaster for new drywall, replace existing sklights, add 3 new skylights). no structural work. no work in common areas inside unit only.Details
attic work: revision to pemit #201808076694, inspector ask for permitted dwgs: (remodel existing bathroom, repair stairway, replace plaster for new drywall, replace existing sklights, add 3 new skylights). no structural work. no work in common areas inside unit only. | $5,000 |
| Sep 11, 2018 | Never finaled issued Sep 2018, no final | 2031 18th Av | 1st floor remodeling:master bathroom and bathroom #2. laundry and storage area.Details
1st floor remodeling:master bathroom and bathroom #2. laundry and storage area. | $60,000 |
| Aug 7, 2018 | Completed final sign-off Oct 2019 | 3441 Clay St | repair and upgrade stairway to the attic area. same size like for like. remodel existing bathroom @ attic area. replace existing skylight (6 units) upgrade electric system at attic area. repair drywall and insulation at attic area. no structural work under this permit.Details
repair and upgrade stairway to the attic area. same size like for like. remodel existing bathroom @ attic area. replace existing skylight (6 units) upgrade electric system at attic area. repair drywall and insulation at attic area. no structural work under this permit. | $30,000 |
| Aug 3, 2018 | Never finaled issued Aug 2018, no final | 746 Divisadero St | removing (e) sun room at rear, renovations of (e) kitchen and bathrooms, revised room layout, associated structural improvements to (e) framing *note; 2nd floorDetails
removing (e) sun room at rear, renovations of (e) kitchen and bathrooms, revised room layout, associated structural improvements to (e) framing *note; 2nd floor | $150,000 |
| Mar 27, 2018 | Completed final sign-off Aug 2021 | 3258 Lyon St | horizontal addition @ 1st & 3rd fl. general remodel to relocate kitchen, living & dining to 1st fl. add remodel (e) bathrooms.Details
horizontal addition @ 1st & 3rd fl. general remodel to relocate kitchen, living & dining to 1st fl. add remodel (e) bathrooms. | $585,000 |
| Dec 15, 2017 | Never finaled issued Dec 2017, no final | 41 Wood St | remodel 2 existing bathrooms on 2nd fl. no new walls, new plumbing, elec, replacement of furnaceDetails
remodel 2 existing bathrooms on 2nd fl. no new walls, new plumbing, elec, replacement of furnace | $40,000 |
| Dec 15, 2017 | Completed final sign-off Nov 2018 | 1754 Grove St | remodel e bath, kitchen, powder rm, remodel closets, add laundry, add glass door at rear sunroomDetails
remodel e bath, kitchen, powder rm, remodel closets, add laundry, add glass door at rear sunroom | $60,000 |
| Nov 7, 2017 | Completed final sign-off Oct 2018 | 317 Cherry St | interior alterations at lower unit: remodel bathrooms, kitchen and bedrooms. no work proposed on other floors. n/a for maherDetails
interior alterations at lower unit: remodel bathrooms, kitchen and bedrooms. no work proposed on other floors. n/a for maher | $20,000 |
| Aug 18, 2017 | Completed final sign-off Jan 2019 | 1102 Dolores St | interior remodel of dwelling to include 1)new bathroom, 2)remodel extg bathroom, 3)plmg and electrical work.Details
interior remodel of dwelling to include 1)new bathroom, 2)remodel extg bathroom, 3)plmg and electrical work. | $30,500 |
| Jul 7, 2017 | Completed final sign-off Jul 2018 | 547 09th Av | 3rd floor: remodel master bedroom - convert (e) bthroom into (n) master bathroom & bathroom #2. relocate master lcoset. no structural work.Details
3rd floor: remodel master bedroom - convert (e) bthroom into (n) master bathroom & bathroom #2. relocate master lcoset. no structural work. | $40,000 |
| Jun 6, 2017 | Expired or cancelled expired Nov 2018 | 451 17th Av | to comply with nov #201782601. 1st fl: (n) gym rm, replace water heater and furnace. 2nd fl: remodel kitchen, (n) powder rm & studio. 3rd fl: convert (e) bathroom into (n) master suite & 2nd bath; add (n) laundry and closets.Details
to comply with nov #201782601. 1st fl: (n) gym rm, replace water heater and furnace. 2nd fl: remodel kitchen, (n) powder rm & studio. 3rd fl: convert (e) bathroom into (n) master suite & 2nd bath; add (n) laundry and closets. | $100,000 |
| May 16, 2017 | Completed final sign-off Jun 2018 | 2478 32nd Av | remodel bathroom in kind, new electrical fixtures and new plumbing fixtures, new tile around tubDetails
remodel bathroom in kind, new electrical fixtures and new plumbing fixtures, new tile around tub | $20,000 |
| May 16, 2017 | Completed final sign-off Sep 2018 | 451 17th Av | demo and removal of plaster in garage. partial interior demo in kitchen and bathroom only.Details
demo and removal of plaster in garage. partial interior demo in kitchen and bathroom only. | $8,000 |
| Apr 5, 2017 | Expired or cancelled cancelled Jan 2026 | 1568 08th Av | 1st fl convert e area into new inlaw unit. remodel bath and add new kitchen in e living area. 2nd fl remodel kitchen, convert e living and dining rm into bedrooms, convert e bedroom into dining rm, open kitchen aerea to integrate great rmDetails
1st fl convert e area into new inlaw unit. remodel bath and add new kitchen in e living area. 2nd fl remodel kitchen, convert e living and dining rm into bedrooms, convert e bedroom into dining rm, open kitchen aerea to integrate great rm | $120,000 |
| Mar 31, 2017 | Never finaled issued Mar 2017, no final | 1390 Fell St | remodel master bath. replace all plumbing fixtures and redo tile and add new lighting in bathroom and master bedroom. remodel in kind. no walls to be altered.Details
remodel master bath. replace all plumbing fixtures and redo tile and add new lighting in bathroom and master bedroom. remodel in kind. no walls to be altered. | $10,000 |
| Jan 17, 2017 | Completed final sign-off Oct 2017 | 504 02nd Av | interior remodel with four new windows and one exterior door at rear facade includes: new kitchen, new powder room, division of upper level to include 2 bedrooms & 1 new bathrooms. installation of 2 new skylights. removal of extg walls on main floor & new beams to replace.Details
interior remodel with four new windows and one exterior door at rear facade includes: new kitchen, new powder room, division of upper level to include 2 bedrooms & 1 new bathrooms. installation of 2 new skylights. removal of extg walls on main floor & new beams to replace. | $65,000 |
| Aug 23, 2016 | Never finaled issued Sep 2016, no final | 131 Chaves Av | 1st flr: convert (e)storage space into (n) 2 bedrooms,1 bathroom & laundry. 2nd flr: kitchen remodel,relocate bathroom, remodel bedrooms,add attic access.Details
1st flr: convert (e)storage space into (n) 2 bedrooms,1 bathroom & laundry. 2nd flr: kitchen remodel,relocate bathroom, remodel bedrooms,add attic access. | $120,000 |
| Aug 12, 2016 | Completed final sign-off Mar 2017 | 1400 Webster St | unit 3: kitchen &2 batrms remodeling, no charnge in wall and opening layout. kitchen remodel - replace in kind, counter, sink, cabinets put in new tiling, dishwasher, washer/dryer (electric) exhaust hood (vent-less). bathroom remodel: replace in kind toilets, tubs. install shower pan. upgradeDetails
unit 3: kitchen &2 batrms remodeling, no charnge in wall and opening layout. kitchen remodel - replace in kind, counter, sink, cabinets put in new tiling, dishwasher, washer/dryer (electric) exhaust hood (vent-less). bathroom remodel: replace in kind toilets, tubs. install shower pan. upgrade | $100,000 |
| Aug 4, 2016 | Never finaled issued Aug 2016, no final | 1809 Page St | revision to 2016-0427-5851: remodel 2 bathrooms, add 2 skylights at 3rd and 4th flDetails
revision to 2016-0427-5851: remodel 2 bathrooms, add 2 skylights at 3rd and 4th fl | $5,000 |
| Jul 6, 2016 | Completed final sign-off Jul 2018 | 707 03rd Av | horizontal addition at the rear yard of a 1 fam dwg. additional sq footage added at level one, 2 & 3 new fam rm & bath at level 1. new exterior stair from level 2 to back yard. new master suite level 3, relocate (e) powder room at level 2Details
horizontal addition at the rear yard of a 1 fam dwg. additional sq footage added at level one, 2 & 3 new fam rm & bath at level 1. new exterior stair from level 2 to back yard. new master suite level 3, relocate (e) powder room at level 2 | $250,000 |
| Apr 27, 2016 | Completed final sign-off Feb 2018 | 1809 Page St | 3rd floor: remodel in kind (e) master bathroom, replace (e0 windows @ master bathroom area (light well); 4th floor: remodel in kind (e) bathroom, (n) skylight @ bathroom area min. 5'6" from property line. masx skylight 2'x4' (2) double joist at skylight opening. 5/8 type x ceiling.Details
3rd floor: remodel in kind (e) master bathroom, replace (e0 windows @ master bathroom area (light well); 4th floor: remodel in kind (e) bathroom, (n) skylight @ bathroom area min. 5'6" from property line. masx skylight 2'x4' (2) double joist at skylight opening. 5/8 type x ceiling. | $20,000 |
| Mar 15, 2016 | Never finaled issued Mar 2016, no final | 701 Minnesota St | bathroom remodel, all plumbing remains in same location. n/a maherDetails
bathroom remodel, all plumbing remains in same location. n/a maher | $8,000 |
| Jul 23, 2015 | Completed final sign-off May 2017 | 1523 Shafter Av | replace rear area due to structural damage. replace foundation. remodel lower floor, remodel upper floor. gr fl add full bath, and bedroom, remove stair, add family room under ex sunroom.2nd fl convert sunroom to kitchen. remodel 1 bath, add full bath, add 1 bedroom. windows at rear. rear balconyDetails
replace rear area due to structural damage. replace foundation. remodel lower floor, remodel upper floor. gr fl add full bath, and bedroom, remove stair, add family room under ex sunroom.2nd fl convert sunroom to kitchen. remodel 1 bath, add full bath, add 1 bedroom. windows at rear. rear balcony | $120,000 |
| Apr 28, 2015 | Completed final sign-off Oct 2020 | 701 Minnesota St | #206 - kitchen countertop replacement, under cabients lighting & bathroom remodeling.Details
#206 - kitchen countertop replacement, under cabients lighting & bathroom remodeling. | $2,000 |
| Apr 27, 2015 | Expired or cancelled expired Nov 2018 | 683 09th Av | comply w/nov 201539751- int. remodel: (n) bedroom & bath @ 1st flr. (n) power room @ 2nd flr, kitchen remodel; convert (e) bath @ 3rf flr into (n) master bath & (n) 2nd bath, (n) electrical system, replace plaster w/drywall 80% of the house.Details
comply w/nov 201539751- int. remodel: (n) bedroom & bath @ 1st flr. (n) power room @ 2nd flr, kitchen remodel; convert (e) bath @ 3rf flr into (n) master bath & (n) 2nd bath, (n) electrical system, replace plaster w/drywall 80% of the house. | $180,000 |
| Jan 8, 2015 | Completed final sign-off Mar 2016 | 196 Saint Elmo Wy | first floor: remodel existing media room, add new bathroom, replace doors, replace windows (2), add new window (1), add new closet spacesDetails
first floor: remodel existing media room, add new bathroom, replace doors, replace windows (2), add new window (1), add new closet spaces | $25,000 |
| Sep 30, 2014 | Completed final sign-off Jul 2015 | 2100 Green St | #302- remodel extg master bathroom, remodel extg bathroom #2. convert extg closet into new power room, non-structural work. n/a ordinance #155-13Details
#302- remodel extg master bathroom, remodel extg bathroom #2. convert extg closet into new power room, non-structural work. n/a ordinance #155-13 | $20,000 |
| Aug 12, 2014 | Completed final sign-off Oct 2014 | 34 Heather Av | 2 bathrooms remodel (in kind); repair interior walls and stairway, new electrical at area of work. to comply with cec 150.0(k)5Details
2 bathrooms remodel (in kind); repair interior walls and stairway, new electrical at area of work. to comply with cec 150.0(k)5 | $20,000 |
| Jun 16, 2014 | Never finaled issued Jul 2014, no final | 2434 Leavenworth St | 2nd flr: convert (e) master bathrm into (n) master bathroom, 2nd bathroom, laundry, closet. repl (e) stairway to attic. attic replace (e) stairway, (n) roof over stairway, (n) electric, dry wall replacementDetails
2nd flr: convert (e) master bathrm into (n) master bathroom, 2nd bathroom, laundry, closet. repl (e) stairway to attic. attic replace (e) stairway, (n) roof over stairway, (n) electric, dry wall replacement | $30,000 |
| Jun 16, 2014 | Completed final sign-off Sep 2015 | 922 Minnesota St | work @ 1st flr only (except stairway 2nd flr), convert (e) study family rm into (n) master suite, relocate (e) bathroom, new laundry, water heater, replace stairwayDetails
work @ 1st flr only (except stairway 2nd flr), convert (e) study family rm into (n) master suite, relocate (e) bathroom, new laundry, water heater, replace stairway | $40,000 |
| May 12, 2014 | Never finaled issued Jul 2015, no final | 281 32nd Av | vertical addition. 1st floor: new bedroom, bathroom & family room & laundry. 2nd floor: remodel bathroom, bedroom & kitchen. 3rd floor: new master suite (new floor).Details
vertical addition. 1st floor: new bedroom, bathroom & family room & laundry. 2nd floor: remodel bathroom, bedroom & kitchen. 3rd floor: new master suite (new floor). | $160,000 |
| Apr 11, 2014 | Completed final sign-off Feb 2015 | 2298 Cecilia Av | amendment and addition to 201308063623. redesign interior stairway to meet code regulations. remodel existing master bath at 3rd fl. remodel existing bath #2 at 3rd flDetails
amendment and addition to 201308063623. redesign interior stairway to meet code regulations. remodel existing master bath at 3rd fl. remodel existing bath #2 at 3rd fl | $15,000 |
| Apr 7, 2014 | Never finaled issued Jul 2015, no final | 1219 Cole St | interior renovation & vertical & horizontal expansion of (e) single family residence. remodel kitchen, bathrooms, (n) interior staircase, (n) 4th fl master suite w/ roof deck.Details
interior renovation & vertical & horizontal expansion of (e) single family residence. remodel kitchen, bathrooms, (n) interior staircase, (n) 4th fl master suite w/ roof deck. | $175,000 |
| Mar 20, 2014 | Completed final sign-off Jul 2014 | 229 Stanyan St | basement renovation: remodel (e) office space, new bathroom, replace rear windows & doors, replace furnace & water heater, new electric layout.Details
basement renovation: remodel (e) office space, new bathroom, replace rear windows & doors, replace furnace & water heater, new electric layout. | $25,000 |
| Feb 19, 2014 | Completed final sign-off Jun 2016 | 625 11th Av | rear addition to extend (e) 1st & 2nd floor. construct new family room, bedroom & bathroom on 1st fl. (e) 2nd fl sunroom to be extended to new family room. new stair connect 1st & 2nd floor.Details
rear addition to extend (e) 1st & 2nd floor. construct new family room, bedroom & bathroom on 1st fl. (e) 2nd fl sunroom to be extended to new family room. new stair connect 1st & 2nd floor. | $52,000 |
| Jan 21, 2014 | Expired or cancelled expired Mar 2016 | 247 Hartford St | 1st floor interior bathroom addition and kitchen alteration with partial wall removal.Details
1st floor interior bathroom addition and kitchen alteration with partial wall removal. | $65,000 |
| Dec 3, 2013 | Never finaled issued Jul 2014, no final | 134 05th Av | addition to back of house on 2nd & 3rd fl includes renovated kitchen, (n) deck, (n) master bathroom on 3rd level, renovated master bedroom on 3rd level.Details
addition to back of house on 2nd & 3rd fl includes renovated kitchen, (n) deck, (n) master bathroom on 3rd level, renovated master bedroom on 3rd level. | $175,000 |
| Oct 22, 2013 | Never finaled issued Oct 2013, no final | 38 Heather Av | to add (n) internal stairway between 1/f and 2/f; remodel 2 bathrooms work to occur on the 1st and 2nd floors all within unit-a.Details
to add (n) internal stairway between 1/f and 2/f; remodel 2 bathrooms work to occur on the 1st and 2nd floors all within unit-a. | $20,000 |
| Aug 6, 2013 | Completed final sign-off Feb 2015 | 2298 Cecilia Av | 1st fl interior remodel, new stairway, new bedroom, bathroom, and family room. 2nd fl: remodel e kitchen, relocate powder roomDetails
1st fl interior remodel, new stairway, new bedroom, bathroom, and family room. 2nd fl: remodel e kitchen, relocate powder room | $90,000 |
| Aug 6, 2013 | Completed final sign-off Feb 2015 | 566 11th Av | 1st fl. rehabilitaion new laundry, new bath, new great room, enlarge garage doorDetails
1st fl. rehabilitaion new laundry, new bath, new great room, enlarge garage door | $160,000 |
| Jul 10, 2013 | Completed final sign-off Sep 2013 | 546 09th Av | bathroom remodel in kindDetails
bathroom remodel in kind | $12,000 |
| Jan 14, 2013 | Completed final sign-off Mar 2013 | 219 Miguel St | bathroom remodeling (in kind) replace fixtures-new floor tile, new wall tile, paint and finishesDetails
bathroom remodeling (in kind) replace fixtures-new floor tile, new wall tile, paint and finishes | $10,000 |
| Sep 18, 2012 | Completed final sign-off Jul 2013 | 861 Alvarado St | rev to 2012/05/16/0624, 2011/12/22/1190: 1st fl: convert(e) storage area into(n)bedroom,enlarge kitchen,reloc mech room to attic.non struc bathroom layout chg.redesign&reduce rear deck.new stairway to attic space.attic rehabilitatn; new bedroom,bathrm&family rm.Details
rev to 2012/05/16/0624, 2011/12/22/1190: 1st fl: convert(e) storage area into(n)bedroom,enlarge kitchen,reloc mech room to attic.non struc bathroom layout chg.redesign&reduce rear deck.new stairway to attic space.attic rehabilitatn; new bedroom,bathrm&family rm. | $30,000 |
| Sep 11, 2012 | Completed final sign-off Jun 2013 | 52 Dellbrook Av | add 736 s.f. of conditioned space includ. bathroom in (e) fullheight basement, new spaces include bathroom, bedroom & family room.Details
add 736 s.f. of conditioned space includ. bathroom in (e) fullheight basement, new spaces include bathroom, bedroom & family room. | $30,000 |
| Jul 11, 2012 | Completed final sign-off Jan 2013 | 2504 Bush St | kitchen remodel on 2nd floor, powder room remodel on 2nd floor, bathroom remodel on 3rd floor & add new bathroom in master suite on 3rd floorDetails
kitchen remodel on 2nd floor, powder room remodel on 2nd floor, bathroom remodel on 3rd floor & add new bathroom in master suite on 3rd floor | $25,000 |
| Apr 2, 2012 | Completed final sign-off Jan 2014 | 567 09th Av | 1st floor:habitable, add bathroom at basement, structural strengthening at 1st floor. enlarge garage door- kitchen remodeling. new powder room at 2nd floor. new master bathroom at 3rd floor in rear sunroom area.Details
1st floor:habitable, add bathroom at basement, structural strengthening at 1st floor. enlarge garage door- kitchen remodeling. new powder room at 2nd floor. new master bathroom at 3rd floor in rear sunroom area. | $80,000 |
| Feb 7, 2012 | Completed final sign-off Nov 2012 | 575 11th Av | ground floor rehabilitation - (n) study, (n) family room, (n) bathroom. replace (e) stairway, structural strengthing, additional foundation slab upgrade, widen garage door to 10 ft.Details
ground floor rehabilitation - (n) study, (n) family room, (n) bathroom. replace (e) stairway, structural strengthing, additional foundation slab upgrade, widen garage door to 10 ft. | $60,000 |
| Oct 14, 2011 | Never finaled issued Oct 2011, no final | 138 Parker Av | 3rd floor-1 bathroom remodel, replace tub & sinks, re-tiling around shower, replace (e) door to pocket doors. lighting per cec 150 (k) 10.Details
3rd floor-1 bathroom remodel, replace tub & sinks, re-tiling around shower, replace (e) door to pocket doors. lighting per cec 150 (k) 10. | $10,000 |
| Sep 2, 2011 | Completed final sign-off Apr 2013 | 166 19th Av | create new garden room behind garage/new roof deck at rear. relocate extg bathroom. replace extg windows in kind. replace extg stairs in kind at rear.Details
create new garden room behind garage/new roof deck at rear. relocate extg bathroom. replace extg windows in kind. replace extg stairs in kind at rear. | $50,000 |
| Jan 18, 2011 | Completed final sign-off Jul 2011 | 1010 Balboa St | 1st fl-voluntary lateral grade, new garage door, replace stairway, replace k.a.v water heater. 2nd fl-kitchen remodeling-add powder room. 3rd fl-remode (e) bathroom, new master bathroom closet. upgrade electrical system in house.Details
1st fl-voluntary lateral grade, new garage door, replace stairway, replace k.a.v water heater. 2nd fl-kitchen remodeling-add powder room. 3rd fl-remode (e) bathroom, new master bathroom closet. upgrade electrical system in house. | $70,000 |
| Oct 4, 2010 | Expired or cancelled expired Nov 2012 | 572 12th Av | 2 bathrooms remodel, replace (e) plaster for (n) drywall @3rd floor & partial second floor, repalce (e)skylights(3), replace (e) aluminum front windows w/(n) wood clad windows, replace(e)wood burning fireplace w/(n) gas fireplace, add insulation(r19)@ceiling and (r13)@walls, replace (e) furnaceDetails
2 bathrooms remodel, replace (e) plaster for (n) drywall @3rd floor & partial second floor, repalce (e)skylights(3), replace (e) aluminum front windows w/(n) wood clad windows, replace(e)wood burning fireplace w/(n) gas fireplace, add insulation(r19)@ceiling and (r13)@walls, replace (e) furnace | $50,000 |
| Jun 17, 2010 | Completed final sign-off Dec 2010 | 854 Haight St | bathroom remodel, new fistures, tile, replace e window in kindDetails
bathroom remodel, new fistures, tile, replace e window in kind | $9,000 |