Paul Power Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2010 to Apr 2026
- Last 24 months
- 2 permits filed
40 permits since 2000: 34 completed, 1 in progress, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 3 completed. Typically 203 days from filing to permit and 499 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 19, 2018 | Completed final sign-off Jan 2019 | 1000 Filbert St | to comply w/ nov# 201868971 items# 2,7, and 13; fix riser height outside rear door. install new handrail on back stairs repai wood damage on rear stairs unit 1022Details
to comply w/ nov# 201868971 items# 2,7, and 13; fix riser height outside rear door. install new handrail on back stairs repai wood damage on rear stairs unit 1022 | $2,500 |
| Jun 13, 2017 | Completed final sign-off May 2019 | 661 Page St | add unit at basement lvl & 1st flr, pvt roof deck w/no stair penthouse. new skylights, int remodel of flr plans @ (e) 2 units. eliminate wood stair, fully sprinklered bldg nfpa-13r under separate, seismic upgrade,1-hr fire rated upgraded wall assemblies. add 1-1/2 baths on unit 2 & 3.Details
add unit at basement lvl & 1st flr, pvt roof deck w/no stair penthouse. new skylights, int remodel of flr plans @ (e) 2 units. eliminate wood stair, fully sprinklered bldg nfpa-13r under separate, seismic upgrade,1-hr fire rated upgraded wall assemblies. add 1-1/2 baths on unit 2 & 3. | $600,000 |
| May 29, 2015 | Completed final sign-off Dec 2020 | 316 Douglass St | excavate (e) garage & crawl space to allow 8' ceiling; 1 car garage to remain & add bedroom, bath & den @ 1st fl & stairs to 2nd fl. (n) foundation & seismic work, clad wood windows. add 3rd fl including bedroom, bathroom & den.Details
excavate (e) garage & crawl space to allow 8' ceiling; 1 car garage to remain & add bedroom, bath & den @ 1st fl & stairs to 2nd fl. (n) foundation & seismic work, clad wood windows. add 3rd fl including bedroom, bathroom & den. | $210,000 |