Paul Power Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2010 to Apr 2026
- Last 24 months
- 2 permits filed
40 permits since 2000: 34 completed, 1 in progress, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
3 deck permits: 1 completed, 1 in progress, 1 never finaled. Typically 0 days from filing to permit and 205 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 29, 2025 | In progress issued Apr 2026 | 4546 19th St | demo interior window walls @ foyer (to be replaced w/guardrail). new roof over atrium w/12 skylights. new leveled flr @ atrium. add gas fireplace appliance @ east wall. add new electric in newly enclosed space. refinish (e) walls w/new drywall finish. extend (e) rear deck 4'-3", fully cantilevered.Details
demo interior window walls @ foyer (to be replaced w/guardrail). new roof over atrium w/12 skylights. new leveled flr @ atrium. add gas fireplace appliance @ east wall. add new electric in newly enclosed space. refinish (e) walls w/new drywall finish. extend (e) rear deck 4'-3", fully cantilevered. | $73,660 |
| Dec 30, 2013 | Completed final sign-off Jul 2014 | 2559 14th Av | add new deck to existing backyard inside setback requiredDetails
add new deck to existing backyard inside setback required | $3,000 |
| Apr 20, 2012 | Never finaled issued Apr 2012, no final | 235 Laidley St | replace some of the framing members of deck that has dryrot, less than 50%, not visable from street.Details
replace some of the framing members of deck that has dryrot, less than 50%, not visable from street. | $1,200 |