Paul Power Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2010 to Apr 2026
- Last 24 months
- 2 permits filed
40 permits since 2000: 34 completed, 1 in progress, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
2 roof deck permits: 2 completed. Typically 236 days from filing to permit and 579 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 13, 2017 | Completed final sign-off May 2019 | 661 Page St | add unit at basement lvl & 1st flr, pvt roof deck w/no stair penthouse. new skylights, int remodel of flr plans @ (e) 2 units. eliminate wood stair, fully sprinklered bldg nfpa-13r under separate, seismic upgrade,1-hr fire rated upgraded wall assemblies. add 1-1/2 baths on unit 2 & 3.Details
add unit at basement lvl & 1st flr, pvt roof deck w/no stair penthouse. new skylights, int remodel of flr plans @ (e) 2 units. eliminate wood stair, fully sprinklered bldg nfpa-13r under separate, seismic upgrade,1-hr fire rated upgraded wall assemblies. add 1-1/2 baths on unit 2 & 3. | $600,000 |
| Mar 27, 2015 | Completed final sign-off Oct 2017 | 428 Collingwood St | horizontal addition, vertical addition of one story, additional 3 bedrooms and 3 baths on level 3, new interior layout on all floors, new electrical, new plumbing, new roof deck, minor excavation and finishing of garage levelDetails
horizontal addition, vertical addition of one story, additional 3 bedrooms and 3 baths on level 3, new interior layout on all floors, new electrical, new plumbing, new roof deck, minor excavation and finishing of garage level | $190,000 |