Back to kitchen remodel contractors
Paul Power Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2010 to Apr 2026
- Last 24 months
- 2 permits filed
40 permits since 2000: 34 completed, 1 in progress, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 0 days from filing to permit and 18 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 23, 2023 | Completed final sign-off Mar 2023 | 2434 Union St | correct all violations which include remove all water damaged areas and replace to comply with complaint 202302305. install new water heater in tv room. all water damage is in the tv room, downstairs hallway, downstairs kitchen, living room, downstairs closet and garage.Details
correct all violations which include remove all water damaged areas and replace to comply with complaint 202302305. install new water heater in tv room. all water damage is in the tv room, downstairs hallway, downstairs kitchen, living room, downstairs closet and garage. | $5,000 |