Back to bathroom remodel contractors
Paul Power Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2010 to Apr 2026
- Last 24 months
- 2 permits filed
40 permits since 2000: 34 completed, 1 in progress, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 4 completed, 1 never finaled. Typically 203 days from filing to permit and 579 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 10, 2026 | Completed final sign-off Jul 2026 | 203 Eureka St | convert (e) walk in closet to bathroom. add toilet, shower, change door 24" to 28", convert 110v to gfci. add sconce.Details
convert (e) walk in closet to bathroom. add toilet, shower, change door 24" to 28", convert 110v to gfci. add sconce. | $9,755 |
| Feb 9, 2023 | Never finaled issued Feb 2023, no final | 868 Union St | remodel (e) bathroom & halfbath with new tub, toilet & sinks. remodel (e) master closet. add cabinets to (e) pantry/ laundry area.Details
remodel (e) bathroom & halfbath with new tub, toilet & sinks. remodel (e) master closet. add cabinets to (e) pantry/ laundry area. | $45,000 |
| Jun 13, 2017 | Completed final sign-off May 2019 | 661 Page St | add unit at basement lvl & 1st flr, pvt roof deck w/no stair penthouse. new skylights, int remodel of flr plans @ (e) 2 units. eliminate wood stair, fully sprinklered bldg nfpa-13r under separate, seismic upgrade,1-hr fire rated upgraded wall assemblies. add 1-1/2 baths on unit 2 & 3.Details
add unit at basement lvl & 1st flr, pvt roof deck w/no stair penthouse. new skylights, int remodel of flr plans @ (e) 2 units. eliminate wood stair, fully sprinklered bldg nfpa-13r under separate, seismic upgrade,1-hr fire rated upgraded wall assemblies. add 1-1/2 baths on unit 2 & 3. | $600,000 |
| May 29, 2015 | Completed final sign-off Dec 2020 | 316 Douglass St | excavate (e) garage & crawl space to allow 8' ceiling; 1 car garage to remain & add bedroom, bath & den @ 1st fl & stairs to 2nd fl. (n) foundation & seismic work, clad wood windows. add 3rd fl including bedroom, bathroom & den.Details
excavate (e) garage & crawl space to allow 8' ceiling; 1 car garage to remain & add bedroom, bath & den @ 1st fl & stairs to 2nd fl. (n) foundation & seismic work, clad wood windows. add 3rd fl including bedroom, bathroom & den. | $210,000 |
| Mar 27, 2015 | Completed final sign-off Oct 2017 | 428 Collingwood St | horizontal addition, vertical addition of one story, additional 3 bedrooms and 3 baths on level 3, new interior layout on all floors, new electrical, new plumbing, new roof deck, minor excavation and finishing of garage levelDetails
horizontal addition, vertical addition of one story, additional 3 bedrooms and 3 baths on level 3, new interior layout on all floors, new electrical, new plumbing, new roof deck, minor excavation and finishing of garage level | $190,000 |