Back to bathroom remodel contractors
Nomellini Construction * Ask For Id *
- Based in
- Brisbane
- On San Francisco permits
- Aug 2013 to Jan 2023
- Last 24 months
- 0 permits filed
601 permits since 2000: 446 completed, 118 never finaled, 37 expired or cancelled.
Of the 118 never-finaled permits, 10 are 3 to 5 years old, 45 are 5 to 10 years old, 63 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
536 bathroom remodel permits: 406 completed, 95 never finaled, 35 expired or cancelled. Typically 0 days from filing to permit and 65 days from permit to final inspection.
Showing the 100 most recent of 536.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 30, 2023 | Completed final sign-off Apr 2024 | 455 Eddy St | unit 807:1 kitchen & 1 bath remodel in kind. no structural/ exterior work required. no charge to wall layout. all work within unit. no fire alarm or sprinkler work required. unit 807 only.Details
unit 807:1 kitchen & 1 bath remodel in kind. no structural/ exterior work required. no charge to wall layout. all work within unit. no fire alarm or sprinkler work required. unit 807 only. | $30,000 |
| Nov 8, 2022 | Never finaled issued Nov 2022, no final | 1074 Union St | units 4,5,6,8,9,10,12,14,&15: remove/replace kitchen cabinets & (e) bath fixtures in-kind; no removal of wallsDetails
units 4,5,6,8,9,10,12,14,&15: remove/replace kitchen cabinets & (e) bath fixtures in-kind; no removal of walls | $15,000 |
| Oct 7, 2022 | Completed final sign-off Jun 2023 | 1158 Montgomery St | unit #283:1 kitchen and 1 bathroom remodel in kind. no structural/exterior work required. no change to kwall layout. all work within unit. no fire alarm on unit #283 onlyDetails
unit #283:1 kitchen and 1 bathroom remodel in kind. no structural/exterior work required. no change to kwall layout. all work within unit. no fire alarm on unit #283 only | $30,000 |
| Aug 25, 2022 | Completed final sign-off Nov 2022 | 1751 Market St | unit #8: (1) kitchen (1) bathroom remodel in kind. no structural/exterior work required. no change to wall layout. all work within unit. no fire alarm or sprinkler work required. unit #8 only.Details
unit #8: (1) kitchen (1) bathroom remodel in kind. no structural/exterior work required. no change to wall layout. all work within unit. no fire alarm or sprinkler work required. unit #8 only. | $30,000 |
| Aug 3, 2022 | Completed final sign-off Sep 2022 | 840 Van Ness Av | unit 508 only: kitchen and bath remodel. no structural/ no exterior no change to wall layout. no fire alarm or sprinkler work req.Details
unit 508 only: kitchen and bath remodel. no structural/ no exterior no change to wall layout. no fire alarm or sprinkler work req. | $30,000 |
| Jul 19, 2022 | Completed final sign-off Sep 2022 | 789 06th Av | unit 4: (1) kitchen and (1) bath remodel in kind. no structural/ exterior work req. no change to wall layout. all work within unit. no fire or sprinkler.Details
unit 4: (1) kitchen and (1) bath remodel in kind. no structural/ exterior work req. no change to wall layout. all work within unit. no fire or sprinkler. | $30,000 |
| Jun 7, 2022 | Never finaled issued Jun 2022, no final | 590 08th Av | unit #4: 1 kitchen and 1 bath remodel in kind. no structural/exterior work required. no change to wall layout. all work within unit. no fire alarm or sprinkler work req. unit #4 only.Details
unit #4: 1 kitchen and 1 bath remodel in kind. no structural/exterior work required. no change to wall layout. all work within unit. no fire alarm or sprinkler work req. unit #4 only. | $30,000 |
| May 26, 2022 | Never finaled issued May 2022, no final | 401 Steiner St | unit #9: 1 kitchen and 1 bath remodel in kind. no structural/exterior work req. no change to wall layout. all work within unit. no fire or sprinkler work req. unit #9 only.Details
unit #9: 1 kitchen and 1 bath remodel in kind. no structural/exterior work req. no change to wall layout. all work within unit. no fire or sprinkler work req. unit #9 only. | $30,000 |
| May 18, 2022 | Completed final sign-off Jul 2022 | 2775 Market St | unit #101 only: 1 kitchen and 1 bath remodel in kind. no structural/exterior work req. no change to wall layout. all work within unit. no fire or sprinkler work req.Details
unit #101 only: 1 kitchen and 1 bath remodel in kind. no structural/exterior work req. no change to wall layout. all work within unit. no fire or sprinkler work req. | $30,000 |
| May 5, 2022 | Completed final sign-off Jul 2022 | 999 Fell St | unit #6 (in kind): (1) kitchen and (1) bath remodel. no structural/exterior work req. no change to wall layout. all work within unit. no fire or sprinkler work req.Details
unit #6 (in kind): (1) kitchen and (1) bath remodel. no structural/exterior work req. no change to wall layout. all work within unit. no fire or sprinkler work req. | $30,000 |
| May 3, 2022 | Completed final sign-off Jul 2022 | 750 Ofarrell St | unit #206. one kitchen + one bathroom remodel in kind. no structural/exterior work required. no change to wall layout. all work within unit. no fire or sprinkler work required. unit #206 only.Details
unit #206. one kitchen + one bathroom remodel in kind. no structural/exterior work required. no change to wall layout. all work within unit. no fire or sprinkler work required. unit #206 only. | $30,000 |
| Apr 20, 2022 | Completed final sign-off Jun 2022 | 765 Geary St | unit #110: kitchen & bath remodel. no structural / exterior work. no change to wall/layout. all work within unit. no fire / sprinkler work. in kindDetails
unit #110: kitchen & bath remodel. no structural / exterior work. no change to wall/layout. all work within unit. no fire / sprinkler work. in kind | $30,000 |
| Apr 12, 2022 | Never finaled issued Apr 2022, no final | 1029 Geary St | unit #29: kitchen and bath remodel. no structural/exterior work required. no change to wall layout. all work within unit. no fire or sprinkler work required.Details
unit #29: kitchen and bath remodel. no structural/exterior work required. no change to wall layout. all work within unit. no fire or sprinkler work required. | $30,000 |
| Mar 28, 2022 | Completed final sign-off May 2022 | 775 Geary St | apt 604: remodel kitchen & bathroom only. no structural / exterior work. no change to wall/floor layout. all work within unit. no fire alarm or sprinkler modfications required. remodel in kind.Details
apt 604: remodel kitchen & bathroom only. no structural / exterior work. no change to wall/floor layout. all work within unit. no fire alarm or sprinkler modfications required. remodel in kind. | $30,000 |
| Mar 28, 2022 | Never finaled issued Mar 2022, no final | 891 Post St | apt 305: remodel kitchen & bathroom only. no structural / exterior work. no change to wall/floor layout. all work within unit. no fire alarm or sprinkler modfications required. remodel in-kind.Details
apt 305: remodel kitchen & bathroom only. no structural / exterior work. no change to wall/floor layout. all work within unit. no fire alarm or sprinkler modfications required. remodel in-kind. | $30,000 |
| Feb 28, 2022 | Expired or cancelled cancelled Sep 2022 | 590 08th Av | unit 10 and 11: kitchen and bath remodel. no structural/exterior work req'd. no change to wall layout. all work within unit. no fire alarm or sprinkler wok req'd.Details
unit 10 and 11: kitchen and bath remodel. no structural/exterior work req'd. no change to wall layout. all work within unit. no fire alarm or sprinkler wok req'd. | $30,000 |
| Feb 10, 2022 | Completed final sign-off Apr 2022 | 2350 Washington St | unit #10: kitchen & bath remodel. no structural/exterior work required. no change to wall layout. all work within unit. no fire alarm or sprinkler work required.Details
unit #10: kitchen & bath remodel. no structural/exterior work required. no change to wall layout. all work within unit. no fire alarm or sprinkler work required. | $30,000 |
| Feb 7, 2022 | Never finaled issued Feb 2022, no final | 590 08th Av | unit #1 only. (1) kitchen + (1) bath remodel. no structural/exterior work required. no change to wall layout. all work within unit. no fire alarm or sprinkler work.Details
unit #1 only. (1) kitchen + (1) bath remodel. no structural/exterior work required. no change to wall layout. all work within unit. no fire alarm or sprinkler work. | $30,000 |
| Jan 21, 2022 | Completed final sign-off Mar 2022 | 1521 Taylor St | unit #3: kitchen & bathroom remodel in-kind. no structural/exterior work. no change to wall layout. all work within unit. no fire safety work.Details
unit #3: kitchen & bathroom remodel in-kind. no structural/exterior work. no change to wall layout. all work within unit. no fire safety work. | $30,000 |
| Jan 21, 2022 | Completed final sign-off Apr 2022 | 45 Brosnan St | unit #5: kitchen & bathroom remodel. no structural/exterior work. no change to wall layout. all work within unit. no fire safety work.Details
unit #5: kitchen & bathroom remodel. no structural/exterior work. no change to wall layout. all work within unit. no fire safety work. | $30,000 |
| Jan 12, 2022 | Completed final sign-off Apr 2022 | 140 Haight St | unit #9. kitchen & bath remodel. no structural/exterior work. no change to wall layout. all work within unit. no fire alarm or sprinkler work req. unit 9 only.Details
unit #9. kitchen & bath remodel. no structural/exterior work. no change to wall layout. all work within unit. no fire alarm or sprinkler work req. unit 9 only. | $30,000 |
| Jan 5, 2022 | Completed final sign-off Mar 2022 | 1565 Washington St | unit 1: kitchen & bath remodel, no structural/exterior work required, no change to wall layout, all work w/in unit, no fire alarm or sprinkler work required. unit 1 only.Details
unit 1: kitchen & bath remodel, no structural/exterior work required, no change to wall layout, all work w/in unit, no fire alarm or sprinkler work required. unit 1 only. | $30,000 |
| Jan 4, 2022 | Completed final sign-off Mar 2022 | 245 Leavenworth St | apt# 36: kitchen and bath remodel only. no structural/ exterior work req. no change to wall layout. all work within unit. no fire alarm or sprinkler work req. in kind.Details
apt# 36: kitchen and bath remodel only. no structural/ exterior work req. no change to wall layout. all work within unit. no fire alarm or sprinkler work req. in kind. | $30,000 |
| Nov 23, 2021 | Completed final sign-off Jan 2022 | 54 04th St | units#621 & #622. 2 bathroom remodels only. no structural/exterior work required. no change to wall layout. all work within bathroom. no fire alarm or sprinkler work required. no kitchen in or being added to units #621 and #622 only.Details
units#621 & #622. 2 bathroom remodels only. no structural/exterior work required. no change to wall layout. all work within bathroom. no fire alarm or sprinkler work required. no kitchen in or being added to units #621 and #622 only. | $15,000 |
| Oct 21, 2021 | Never finaled issued Oct 2021, no final | 901 Valencia St | #9. kitchen and bath remodel. no structural/exterior work required. no change to wall layout. all work within unit. no fire alarm or sprinkler work required. unit 9 only.Details
#9. kitchen and bath remodel. no structural/exterior work required. no change to wall layout. all work within unit. no fire alarm or sprinkler work required. unit 9 only. | $30,000 |
| Oct 21, 2021 | Completed final sign-off Jan 2022 | 901 Valencia St | #24. kitchen and bath remodel. no structural/exterior work required. no change to wall layout. all work within unit. no fire alarm or sprinkler work required. unit 24 only.Details
#24. kitchen and bath remodel. no structural/exterior work required. no change to wall layout. all work within unit. no fire alarm or sprinkler work required. unit 24 only. | $30,000 |
| Oct 21, 2021 | Expired or cancelled cancelled Apr 2022 | 901 Valencia St | #18. kitchen and bath remodel. no structural/exterior work required. no change to wall layout. all work within unit. no fire alarm or sprinkler work required. unit 18 only.Details
#18. kitchen and bath remodel. no structural/exterior work required. no change to wall layout. all work within unit. no fire alarm or sprinkler work required. unit 18 only. | $30,000 |
| Oct 21, 2021 | Completed final sign-off Jan 2022 | 704 Bush St | #103. kitchen and bath remodel. no structural/exterior work required. no change to wall layout. all work within unit. no fire alarm or sprinkler work required. unit 103 only.Details
#103. kitchen and bath remodel. no structural/exterior work required. no change to wall layout. all work within unit. no fire alarm or sprinkler work required. unit 103 only. | $30,000 |
| Oct 12, 2021 | Completed final sign-off Nov 2021 | 425 Hyde St | unit 55:kitchen and bath remodel only. kitchen: 72sqft bath 40sqftDetails
unit 55:kitchen and bath remodel only. kitchen: 72sqft bath 40sqft | $30,000 |
| Sep 22, 2021 | Completed final sign-off Nov 2021 | 952 Sutter St | unit 605: kitchen & bath remodel in kind. kitchen 72 sqft, bath 40 sqft. h.e. lighting & controlled per cec 150.0(k)Details
unit 605: kitchen & bath remodel in kind. kitchen 72 sqft, bath 40 sqft. h.e. lighting & controlled per cec 150.0(k) | $30,000 |
| Jul 13, 2021 | Expired or cancelled cancelled Dec 2021 | 50 Golden Gate Av | kitchen and bath remodel. no structural / exterior work req. no change to wall layout. all work within unit. no fire alarm or sprinkler work req. unit 404 and 504 only.Details
kitchen and bath remodel. no structural / exterior work req. no change to wall layout. all work within unit. no fire alarm or sprinkler work req. unit 404 and 504 only. | $35,000 |
| Oct 20, 2020 | Completed final sign-off Dec 2020 | 970 Geary St | kitchen + bath remodel. no structural/exterior work req. no change to wall layout. all work within unit. no fire alarm or sprinkler work req. unit #22 only.Details
kitchen + bath remodel. no structural/exterior work req. no change to wall layout. all work within unit. no fire alarm or sprinkler work req. unit #22 only. | $30,000 |
| Oct 9, 2020 | Completed final sign-off Dec 2020 | 1751 Market St | apt 44 - 3rd flr: rev to pa202008212285: as-builts to (e) layout: infill (e) bathroom door through kitchen and relocate to hallway. add non-bearing walls to great closet in (e) closet. all per plans. maher n/a.Details
apt 44 - 3rd flr: rev to pa202008212285: as-builts to (e) layout: infill (e) bathroom door through kitchen and relocate to hallway. add non-bearing walls to great closet in (e) closet. all per plans. maher n/a. | $500 |
| Sep 29, 2020 | Completed final sign-off Nov 2020 | 970 Geary St | unit 21 - kitchen and bathroom remodel in-kind. no structural/ exterior work. no fire alarm/ sprinkler work.Details
unit 21 - kitchen and bathroom remodel in-kind. no structural/ exterior work. no fire alarm/ sprinkler work. | $30,000 |
| Aug 21, 2020 | Completed final sign-off Dec 2020 | 1751 Market St | unit# 44. kitchen & bath remodel only. no change in walls & openings layout.Details
unit# 44. kitchen & bath remodel only. no change in walls & openings layout. | $30,000 |
| Aug 3, 2020 | Completed final sign-off Sep 2020 | 970 Geary St | apt 40: kitchen (14x13) and bath (6x5.5) remodel. new cabinets, countertops and fixtures. no structural, no exterior work. no change in existing layouts or wall modifications/infills. all work within unit. no fire alarm sprinkler work req.Details
apt 40: kitchen (14x13) and bath (6x5.5) remodel. new cabinets, countertops and fixtures. no structural, no exterior work. no change in existing layouts or wall modifications/infills. all work within unit. no fire alarm sprinkler work req. | $32,000 |
| Jul 6, 2020 | Completed final sign-off Aug 2020 | 146 Mcallister St | kitchen & bath remodel. apartment #109 onlyDetails
kitchen & bath remodel. apartment #109 only | $30,000 |
| Jul 6, 2020 | Completed final sign-off Aug 2020 | 839 Leavenworth St | kitchen & bathroom remodel. unit #201 onlyDetails
kitchen & bathroom remodel. unit #201 only | $30,000 |
| Jun 15, 2020 | Completed final sign-off Aug 2020 | 371 Turk St | unit #32: kitchen and bath remodel. new cabinets, countertops and fixtures in kind. no structural, no exterior work. no change in existing layouts or wall modifications/infills. all work within unit. no fire alarm or sprinkler work req.Details
unit #32: kitchen and bath remodel. new cabinets, countertops and fixtures in kind. no structural, no exterior work. no change in existing layouts or wall modifications/infills. all work within unit. no fire alarm or sprinkler work req. | $30,000 |
| Jun 1, 2020 | Completed final sign-off Jul 2020 | 350 Turk St | apt 201: kitchen and bath remodel. new cabinets, countertops and fixtures. no structural, no exterior work. no change in existing layouts or wall modifications/infills. all work within unit. no fire alarm sprinkler work req.Details
apt 201: kitchen and bath remodel. new cabinets, countertops and fixtures. no structural, no exterior work. no change in existing layouts or wall modifications/infills. all work within unit. no fire alarm sprinkler work req. | $32,000 |
| Jun 1, 2020 | Completed final sign-off Aug 2020 | 1359 Hayes St | apt 7: kitchen and bath remodel. new cabinets, countertops and fixtures. no structural, no exterior work. no change in existing layouts or wall modifications/infills. all work within unit. no fire alarm sprinkler work req.Details
apt 7: kitchen and bath remodel. new cabinets, countertops and fixtures. no structural, no exterior work. no change in existing layouts or wall modifications/infills. all work within unit. no fire alarm sprinkler work req. | $32,000 |
| May 6, 2020 | Completed final sign-off Aug 2020 | 970 Geary St | apt 37: kitchen and bath remodel. new cabinets, countertops and fixtures. no structural, no exterior work. no change in existing layouts or wall modifications/infills. all work within unit. no fire alarm sprinkler work req.Details
apt 37: kitchen and bath remodel. new cabinets, countertops and fixtures. no structural, no exterior work. no change in existing layouts or wall modifications/infills. all work within unit. no fire alarm sprinkler work req. | $18,000 |
| May 6, 2020 | Completed final sign-off Jul 2020 | 958 Geary St | apt 26: kitchen and bath remodel. new cabinets, countertops and fixtures. no structural, no exterior work. no change in existing layouts or wall modifications/infills. all work within unit. no fire alarm sprinkler work req.Details
apt 26: kitchen and bath remodel. new cabinets, countertops and fixtures. no structural, no exterior work. no change in existing layouts or wall modifications/infills. all work within unit. no fire alarm sprinkler work req. | $18,000 |
| May 6, 2020 | Completed final sign-off Jul 2020 | 245 Leavenworth St | apt 67: kitchen and bath remodel. new cabinets, countertops and fixtures. no structural, no exterior work. no change in existing layouts or wall modifications/infills. all work within unit. no fire alarm sprinkler work req.Details
apt 67: kitchen and bath remodel. new cabinets, countertops and fixtures. no structural, no exterior work. no change in existing layouts or wall modifications/infills. all work within unit. no fire alarm sprinkler work req. | $18,000 |
| May 6, 2020 | Completed final sign-off Jul 2020 | 350 Turk St | apt 1509: kitchen and bath remodel. new cabinets, countertops and fixtures. no structural, no exterior work. no change in existing layouts or wall modifications/infills. all work within unit. no fire alarm sprinkler work req.Details
apt 1509: kitchen and bath remodel. new cabinets, countertops and fixtures. no structural, no exterior work. no change in existing layouts or wall modifications/infills. all work within unit. no fire alarm sprinkler work req. | $18,000 |
| May 6, 2020 | Completed final sign-off Jul 2020 | 1968 Filbert St | in-kind: kitchen and bath remodel. new cabinets, countertops and fixtures. no structural, no exterior work. no change in existing layouts or wall modifications/infills. all work within unit. no fire alarm sprinkler work req.Details
in-kind: kitchen and bath remodel. new cabinets, countertops and fixtures. no structural, no exterior work. no change in existing layouts or wall modifications/infills. all work within unit. no fire alarm sprinkler work req. | $24,000 |
| May 6, 2020 | Completed final sign-off Jun 2020 | 840 Van Ness Av | apt 209: kitchen and bath remodel. new cabinets, countertops and fixtures. no structural, no exterior work. no change in existing layouts or wall modifications/infilled. all work within unit. no fire alarm / sprinkler work req.Details
apt 209: kitchen and bath remodel. new cabinets, countertops and fixtures. no structural, no exterior work. no change in existing layouts or wall modifications/infilled. all work within unit. no fire alarm / sprinkler work req. | $18,000 |
| Mar 3, 2020 | Completed final sign-off Jun 2020 | 970 Geary St | unit 51: kitchen and bath remodel. no structural/exterior work req. no change to wall layout. all work within unit. no fire alarm or sprinkler work req.Details
unit 51: kitchen and bath remodel. no structural/exterior work req. no change to wall layout. all work within unit. no fire alarm or sprinkler work req. | $35,000 |
| Feb 24, 2020 | Completed final sign-off May 2020 | 970 Geary St | unit 55: kitchen & bath remodel. no structural/exterior work req. no change to wall layout. all work within unit. no fire alarm or sprinkler work req.Details
unit 55: kitchen & bath remodel. no structural/exterior work req. no change to wall layout. all work within unit. no fire alarm or sprinkler work req. | $35,000 |
| Feb 20, 2020 | Completed final sign-off May 2020 | 840 Van Ness Av | unit 309: kitchen & bath remodel. no structural/exterior work req. no change to wall layout. all work within unit. no fire alarm or sprinkler work req. unit 309 onlyDetails
unit 309: kitchen & bath remodel. no structural/exterior work req. no change to wall layout. all work within unit. no fire alarm or sprinkler work req. unit 309 only | $25,000 |
| Feb 13, 2020 | Completed final sign-off Apr 2020 | 50 Golden Gate Av | unit 604 only: kitchen & bath remodel. no structural /exterior work req. no change to wall layout. all work within unit. no fire alarm or sprinkler work req. remodel in kind. comply w/ cec 150.0 (k) 3 & 150.0 (k) 5.Details
unit 604 only: kitchen & bath remodel. no structural /exterior work req. no change to wall layout. all work within unit. no fire alarm or sprinkler work req. remodel in kind. comply w/ cec 150.0 (k) 3 & 150.0 (k) 5. | $25,000 |
| Jan 27, 2020 | Completed final sign-off Mar 2020 | 350 Turk St | unit 505: kitchen & bath remodel. no structural /exterior work req. no change to wall layout. all work within unit. no fire alarm or sprinkler work req.Details
unit 505: kitchen & bath remodel. no structural /exterior work req. no change to wall layout. all work within unit. no fire alarm or sprinkler work req. | $25,000 |
| Jan 23, 2020 | Completed final sign-off Apr 2020 | 970 Geary St | apts 2, 32, 35: each unit, remodel 1 bathroom & kitchen. no structural or layout or walls mofidications or changes. no exterior work.Details
apts 2, 32, 35: each unit, remodel 1 bathroom & kitchen. no structural or layout or walls mofidications or changes. no exterior work. | $75,000 |
| Jan 7, 2020 | Never finaled issued Jan 2020, no final | 2360 Van Ness Av | apt 12: remodel kitchen & bathroom. no structural or exterior work.Details
apt 12: remodel kitchen & bathroom. no structural or exterior work. | $25,000 |
| Jan 7, 2020 | Completed final sign-off Feb 2020 | 839 Leavenworth St | apt 104: remodel kitchen & bathroom. no structural or exterior work.Details
apt 104: remodel kitchen & bathroom. no structural or exterior work. | $25,000 |
| Dec 18, 2019 | Completed final sign-off Mar 2020 | 381 Turk St | kitchen & bath remodels. no sturctural, no exterior work. in units #102, 102, 200, 202, 300, 307, 308.Details
kitchen & bath remodels. no sturctural, no exterior work. in units #102, 102, 200, 202, 300, 307, 308. | $105,000 |
| Nov 26, 2019 | Completed final sign-off Jan 2020 | 350 Turk St | unit 1607: kitchen & bath remodel, no structural/exterior work required, no change to wall layout. all work within unit, no fire alarm or sprinkler work required.Details
unit 1607: kitchen & bath remodel, no structural/exterior work required, no change to wall layout. all work within unit, no fire alarm or sprinkler work required. | $30,000 |
| Nov 12, 2019 | Completed final sign-off Jan 2020 | 1029 Geary St | #41: kitchen & 1 bath remodel. no structural/no exterior work. all work within unit. no change to wall laout. no fire alarm/sprinkler work req.Details
#41: kitchen & 1 bath remodel. no structural/no exterior work. all work within unit. no change to wall laout. no fire alarm/sprinkler work req. | $30,000 |
| Oct 30, 2019 | Completed final sign-off Jan 2020 | 146 Mcallister St | unit 218: kitchen (72 sq. ft.) & bath (40 sq. ft.) remodel, no structural/exterior work required, all work w/in unit. no change to layout/fire alarm/sprinker/removal of walls.Details
unit 218: kitchen (72 sq. ft.) & bath (40 sq. ft.) remodel, no structural/exterior work required, all work w/in unit. no change to layout/fire alarm/sprinker/removal of walls. | $25,000 |
| Oct 11, 2019 | Completed final sign-off Dec 2019 | 900 Oak St | unit 5: kitchen & bath remodel. no structural/exterior/layout/wall change. all work within unit. no fire alarm/sprinkler work required.Details
unit 5: kitchen & bath remodel. no structural/exterior/layout/wall change. all work within unit. no fire alarm/sprinkler work required. | $30,000 |
| Oct 11, 2019 | Completed final sign-off Dec 2019 | 350 Turk St | unit 701: kitchen (72 sq. ft.) & bath (40 sq. ft.) remodel. no structural/exterior/layout/wall change. all work within unit. no fire alarm/sprinkler work required.Details
unit 701: kitchen (72 sq. ft.) & bath (40 sq. ft.) remodel. no structural/exterior/layout/wall change. all work within unit. no fire alarm/sprinkler work required. | $30,000 |
| Oct 3, 2019 | Completed final sign-off Nov 2019 | 900 Oak St | unit 4: kitchen & bath remodel. no exterior/structural work. all work within unit. no change to wall layout. no fire alarm or sprinkler work req. bath: 40, kitchen 72Details
unit 4: kitchen & bath remodel. no exterior/structural work. all work within unit. no change to wall layout. no fire alarm or sprinkler work req. bath: 40, kitchen 72 | $30,000 |
| Sep 30, 2019 | Completed final sign-off Dec 2019 | 2350 Union St | #7: kitchen & bath remodel. no structural/exterior work. no chang eto wall alyout. all work within unit. no fire alarm/sprinkler work req.Details
#7: kitchen & bath remodel. no structural/exterior work. no chang eto wall alyout. all work within unit. no fire alarm/sprinkler work req. | $3,000 |
| Sep 18, 2019 | Completed final sign-off Nov 2019 | 50 Golden Gate Av | unit 300 - 1 kitchen and 1 bath remodel. no structural changes. no change to wall layout. all work in unit 3. kitchen: 72 sq ft, bath: 40 sq ftDetails
unit 300 - 1 kitchen and 1 bath remodel. no structural changes. no change to wall layout. all work in unit 3. kitchen: 72 sq ft, bath: 40 sq ft | $30,000 |
| Sep 18, 2019 | Completed final sign-off Nov 2019 | 72 Gough St | 1 kitchen and 1 bath remodel. no structural changes. no change to wall layout. all work in unit 3. kitchen: 72 sq ft, bath: 40 sq ftDetails
1 kitchen and 1 bath remodel. no structural changes. no change to wall layout. all work in unit 3. kitchen: 72 sq ft, bath: 40 sq ft | $30,000 |
| Sep 11, 2019 | Completed final sign-off Nov 2019 | 900 Oak St | unit #2: remodel kitchen and batrhoom: no structural/no exterior work. all work within unit #2. no change to wall layou. no fire alarm or sprinkler work req. kitchen 72sq ft, bathroom 40sq ft.Details
unit #2: remodel kitchen and batrhoom: no structural/no exterior work. all work within unit #2. no change to wall layou. no fire alarm or sprinkler work req. kitchen 72sq ft, bathroom 40sq ft. | $30,000 |
| Sep 6, 2019 | Completed final sign-off Nov 2019 | 825 Post St | unit 405: kitchen & bath remodel. no structural/no exterior work. all work within unit. no change to wall and opening layout. no fire alram or sprinkler work req.Details
unit 405: kitchen & bath remodel. no structural/no exterior work. all work within unit. no change to wall and opening layout. no fire alram or sprinkler work req. | $30,000 |
| Sep 6, 2019 | Completed final sign-off Oct 2019 | 455 Eddy St | unit 406: kitchen & bathroom remodel: no structural/ no exterior work. all work within unit. no change to wall & opening layout. no fire alarm/ sprinklers work req.Details
unit 406: kitchen & bathroom remodel: no structural/ no exterior work. all work within unit. no change to wall & opening layout. no fire alarm/ sprinklers work req. | $30,000 |
| Aug 26, 2019 | Completed final sign-off Sep 2019 | 2350 Washington St | unit 5 - kitchen and bath remodel. no structural/ no exterior works. all works within unit. no changes to wall layout. no fire alarm/sprinkler workDetails
unit 5 - kitchen and bath remodel. no structural/ no exterior works. all works within unit. no changes to wall layout. no fire alarm/sprinkler work | $30,000 |
| Aug 20, 2019 | Completed final sign-off Oct 2019 | 305 Hyde St | kitchen and bath remodel. no structural no exteror work no change to wall layout. all work within unit. no fire alarm or sprinklered work req . bath 40 sq, kitchen 70 sqDetails
kitchen and bath remodel. no structural no exteror work no change to wall layout. all work within unit. no fire alarm or sprinklered work req . bath 40 sq, kitchen 70 sq | $31,926 |
| Aug 7, 2019 | Completed final sign-off Sep 2019 | 2350 Union St | apt 10: bathroom remodel only.Details
apt 10: bathroom remodel only. | $4,500 |
| Aug 7, 2019 | Never finaled issued Aug 2019, no final | 350 Turk St | #202: kitchen and bath remodel. no structural/no exterior work. no change to wall layout. all work within unit. no fire alarm or sprinkler work req.Details
#202: kitchen and bath remodel. no structural/no exterior work. no change to wall layout. all work within unit. no fire alarm or sprinkler work req. | $30,000 |
| Jul 29, 2019 | Completed final sign-off Aug 2019 | 455 Eddy St | unit #802: 1 kitchen, and one bath remodel, no exterior work. all work within unit. no change to wall layout, no fire alarm or sprinkler work required. kitchen 72 sq ft and bath 40 sq ft.Details
unit #802: 1 kitchen, and one bath remodel, no exterior work. all work within unit. no change to wall layout, no fire alarm or sprinkler work required. kitchen 72 sq ft and bath 40 sq ft. | $25,000 |
| Jul 24, 2019 | Never finaled issued Jul 2019, no final | 350 Turk St | unit 205: kitchen and bathroom. no structural and no exterior work req. all work within unit. no changes to wall layout. no fire alarm/sprinkler work req. kitchen 72 sq bath 40 sq.Details
unit 205: kitchen and bathroom. no structural and no exterior work req. all work within unit. no changes to wall layout. no fire alarm/sprinkler work req. kitchen 72 sq bath 40 sq. | $25,000 |
| Jul 23, 2019 | Completed final sign-off Oct 2019 | 146 Mcallister St | unit 622: kitchen (72 sq. ft.) & bathroom (40 sq. ft.) remodel, no structural/exterior work, no change to wall layout/fire alarm/sprinkler.Details
unit 622: kitchen (72 sq. ft.) & bathroom (40 sq. ft.) remodel, no structural/exterior work, no change to wall layout/fire alarm/sprinkler. | $25,000 |
| Jul 12, 2019 | Completed final sign-off Aug 2019 | 245 Leavenworth St | unit 41: kitchen and bath remodel. no structural, no exterior work req no change in wall layout. all work within unit no fire alarm sprinkler work reqDetails
unit 41: kitchen and bath remodel. no structural, no exterior work req no change in wall layout. all work within unit no fire alarm sprinkler work req | $29,000 |
| Jun 3, 2019 | Never finaled issued Jun 2019, no final | 455 Eddy St | unit 505: kitchen and bathroom remodel. no exterior structural work req. all work within unit. no change to wall layout. no fire alarm/sprinkler work req. kichen 72 sqft and bath 40 sq ft. tile in bathroom. new cabinets/counter top. new appliances and electrical fixtures. flooring in unitDetails
unit 505: kitchen and bathroom remodel. no exterior structural work req. all work within unit. no change to wall layout. no fire alarm/sprinkler work req. kichen 72 sqft and bath 40 sq ft. tile in bathroom. new cabinets/counter top. new appliances and electrical fixtures. flooring in unit | $25,000 |
| May 30, 2019 | Completed final sign-off Aug 2019 | 825 Post St | unit 401: kitchen and bathroom remodel. no structural/no exterior work. no change to wall layout. all work within unit. no fire alarm or sprinkler work required.Details
unit 401: kitchen and bathroom remodel. no structural/no exterior work. no change to wall layout. all work within unit. no fire alarm or sprinkler work required. | $25,000 |
| May 30, 2019 | Completed final sign-off Aug 2019 | 765 Geary St | unit 211: kitchen and bathroom remodel. no structural/no exterior work. no change in wall layout. all work within unit. no fire alarm or sprinkler work required.Details
unit 211: kitchen and bathroom remodel. no structural/no exterior work. no change in wall layout. all work within unit. no fire alarm or sprinkler work required. | $25,000 |
| May 21, 2019 | Never finaled issued May 2019, no final | 410 Pierce St | unit 6: kitchen & bathroom remodel. no structural/ no exterior work required. no change in wall layout. all work within unit. no fire alarm/sprinkler work required.Details
unit 6: kitchen & bathroom remodel. no structural/ no exterior work required. no change in wall layout. all work within unit. no fire alarm/sprinkler work required. | $25,000 |
| May 21, 2019 | Completed final sign-off Jul 2019 | 455 Eddy St | unit 1103: kitchen & bath remodel. no structural/ no exterior work required. no change in wall layout. all wiork within unit. no fire alarm/sprinkler work required.Details
unit 1103: kitchen & bath remodel. no structural/ no exterior work required. no change in wall layout. all wiork within unit. no fire alarm/sprinkler work required. | $25,000 |
| May 8, 2019 | Completed final sign-off Jul 2019 | 275 Turk St | unit # 209: remodel kitchen and bathroom: no structural/exterior work required. no change in walls or layout. all work within unit. no fire alarm or sprinkler work required. kitchen 70sq, bathroom 40sqDetails
unit # 209: remodel kitchen and bathroom: no structural/exterior work required. no change in walls or layout. all work within unit. no fire alarm or sprinkler work required. kitchen 70sq, bathroom 40sq | $25,000 |
| Apr 24, 2019 | Never finaled issued Apr 2019, no final | 50 Golden Gate Av | unit #108: kitchen and bathroom remodel - no structural. no exterior work. no change in wall layout. all work within unit. no fire alarm/sprinkler work required. remodel in kind.Details
unit #108: kitchen and bathroom remodel - no structural. no exterior work. no change in wall layout. all work within unit. no fire alarm/sprinkler work required. remodel in kind. | $25,000 |
| Apr 22, 2019 | Never finaled issued Apr 2019, no final | 1060 Bush St | unit #307: kitchen and bathroom remodel. no exterior/ no structural work. all work within unit 307. no change to walls, layouts. no fire sprinkler work required.Details
unit #307: kitchen and bathroom remodel. no exterior/ no structural work. all work within unit 307. no change to walls, layouts. no fire sprinkler work required. | $25,000 |
| Apr 19, 2019 | Completed final sign-off Jun 2019 | 1060 Bush St | unit 100: kitchen and bathroom remodel. no exterior/no structural work. all work within unit. no change to wall layout. no fire sprinkler work required.Details
unit 100: kitchen and bathroom remodel. no exterior/no structural work. all work within unit. no change to wall layout. no fire sprinkler work required. | $25,000 |
| Apr 19, 2019 | Completed final sign-off Jun 2019 | 1008 Larkin St | unit 303: kitchen and bathroom remodel. no structural/no exterior work. no change in wall layout. all work within unit. no fire alarm or sprinkler work required.Details
unit 303: kitchen and bathroom remodel. no structural/no exterior work. no change in wall layout. all work within unit. no fire alarm or sprinkler work required. | $25,000 |
| Apr 18, 2019 | Never finaled issued Apr 2019, no final | 775 Geary St | unit 103: renovation of (e) unit on first floor. new fixtures and finishes at (e) kitchen and bathroom. no horizontal or vertical additionDetails
unit 103: renovation of (e) unit on first floor. new fixtures and finishes at (e) kitchen and bathroom. no horizontal or vertical addition | $25,000 |
| Apr 17, 2019 | Completed final sign-off Jun 2019 | 371 Turk St | unit 21: (1) kitchen and (1) bathroom remodel. no structural/no exterior work. all work within unit. no change to wall layout. no sprinkler work or fire alarm work requiredDetails
unit 21: (1) kitchen and (1) bathroom remodel. no structural/no exterior work. all work within unit. no change to wall layout. no sprinkler work or fire alarm work required | $25,000 |
| Apr 3, 2019 | Completed final sign-off May 2019 | 146 Mcallister St | to comply with nov201929681 install exhaust with humidistat fan in bathDetails
to comply with nov201929681 install exhaust with humidistat fan in bath | $250 |
| Apr 2, 2019 | Never finaled issued Apr 2019, no final | 891 Post St | unit# 201: kitchen and bathroom remodel. no structural/no exterior work. no change in wall layout. all work within unit. no fire alarm or sprinkler work required.Details
unit# 201: kitchen and bathroom remodel. no structural/no exterior work. no change in wall layout. all work within unit. no fire alarm or sprinkler work required. | $25,000 |
| Mar 27, 2019 | Completed final sign-off May 2019 | 825 Post St | unit 303. kitchen and bathroom remodel. neither exterior nor structural work done. all work done within unit. no change in wall layout. no fire sprinkler work req. kitchen 72 sq ft, bath 40 sq ftDetails
unit 303. kitchen and bathroom remodel. neither exterior nor structural work done. all work done within unit. no change in wall layout. no fire sprinkler work req. kitchen 72 sq ft, bath 40 sq ft | $25,000 |
| Mar 26, 2019 | Completed final sign-off May 2019 | 1060 Bush St | kitchen and bathroom remodel no exterior no structural work. all work within unit no change to wall layout. no fire sprinkler work required kitchen; 72 sq ft bath 40 sq ftDetails
kitchen and bathroom remodel no exterior no structural work. all work within unit no change to wall layout. no fire sprinkler work required kitchen; 72 sq ft bath 40 sq ft | $25,000 |
| Mar 26, 2019 | Completed final sign-off Apr 2019 | 455 Eddy St | unit 1604: kitchen and bathroom remodel no exterior no structural work. all work within unit no change to wall layout. no fire sprinkler work requiredDetails
unit 1604: kitchen and bathroom remodel no exterior no structural work. all work within unit no change to wall layout. no fire sprinkler work required | $25,000 |
| Mar 6, 2019 | Completed final sign-off Apr 2019 | 2775 Market St | apt 303: remodel full bathroom. change elctrical fixtures, refinish floring. install tile in kitchen. no change in wall layout.Details
apt 303: remodel full bathroom. change elctrical fixtures, refinish floring. install tile in kitchen. no change in wall layout. | $8,500 |
| Feb 27, 2019 | Never finaled issued Feb 2019, no final | 72 Gough St | unit 16a: remodel kitchenette. install flooring and cabinets. paint. no bathroom in unit. no structural/exterior work required. no change to wall layout. kitchen: 25 sqft.Details
unit 16a: remodel kitchenette. install flooring and cabinets. paint. no bathroom in unit. no structural/exterior work required. no change to wall layout. kitchen: 25 sqft. | $15,000 |
| Feb 22, 2019 | Completed final sign-off Apr 2019 | 1751 Market St | unit 26: kitchen and bathroom remodel. no structural/exterior work. no change in wall layout. all work within unit. no fire alarm or sprinkler work provided. kitchen: 72 sqft. bathroom: 40 sq ft.Details
unit 26: kitchen and bathroom remodel. no structural/exterior work. no change in wall layout. all work within unit. no fire alarm or sprinkler work provided. kitchen: 72 sqft. bathroom: 40 sq ft. | $25,000 |
| Feb 21, 2019 | Completed final sign-off Apr 2019 | 455 Eddy St | unit 902: kitchen & bathroom remodel, no structural/no exterior work, no change in wall layout. all work within unit. no fire alarm or sprinkler work required. kitchen 72 sf, bath 40 sf.Details
unit 902: kitchen & bathroom remodel, no structural/no exterior work, no change in wall layout. all work within unit. no fire alarm or sprinkler work required. kitchen 72 sf, bath 40 sf. | $25,000 |
| Feb 7, 2019 | Completed final sign-off Apr 2019 | 50 Golden Gate Av | unit 304. kitchen & bathroom remodel. no structural nor exterior work. no change in wall layout. all work within unit. no fire alarm or sprinkler work required. kitchen 72 bath 40 sq ftDetails
unit 304. kitchen & bathroom remodel. no structural nor exterior work. no change in wall layout. all work within unit. no fire alarm or sprinkler work required. kitchen 72 bath 40 sq ft | $25,000 |
| Feb 7, 2019 | Never finaled issued Feb 2019, no final | 305 Hyde St | unit 403. kitchen & bathroom remodel. no structural nor exterior work. no change in wall layout. all work within unit. no fire alarm or sprinkler work required. kitchen 72 bath 40 sq ftDetails
unit 403. kitchen & bathroom remodel. no structural nor exterior work. no change in wall layout. all work within unit. no fire alarm or sprinkler work required. kitchen 72 bath 40 sq ft | $25,000 |
| Jan 24, 2019 | Completed final sign-off Apr 2019 | 455 Eddy St | unit 1009. kitchen and bathroom remodel. no exterior / no structural work. all work within unit. no change to wall layout. kitchen 72 sq ft, bath 40 sq ftDetails
unit 1009. kitchen and bathroom remodel. no exterior / no structural work. all work within unit. no change to wall layout. kitchen 72 sq ft, bath 40 sq ft | $25,000 |