Block 3533, lot 073
45 Brosnan St
- City’s use
- Multi-Family Residential
- Built
- 1922
- Stories
- 3
- Units
- 12
- Rooms
- 12 bathrooms
- Building
- 9,390 sq ft
- Lot
- 5,248 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
18 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 12, 2023 | Never finaled issued Sep 2023, no final | 45 Brosnan St | C F Y Construction Inc | reroofingDetails
reroofing | $47,750 |
| Aug 31, 2023 | Completed final sign-off Dec 2023 | 45 Brosnan St | Crime Watch Security Sys Llc | upgrade existing fire alarm system to comply with sffc section 1103.7.6.1Details
upgrade existing fire alarm system to comply with sffc section 1103.7.6.1 | $30,200 |
| Jan 21, 2022 | Completed final sign-off Apr 2022 | 45 Brosnan St | Nomellini Construction * Ask For Id * | unit #5: kitchen & bathroom remodel. no structural/exterior work. no change to wall layout. all work within unit. no fire safety work.Details
unit #5: kitchen & bathroom remodel. no structural/exterior work. no change to wall layout. all work within unit. no fire safety work. | $30,000 |
| Nov 28, 2016 | Completed final sign-off Jan 2017 | 45 Brosnan St | U S Prime Contractor Inc | revision to 201511132578 for fire notes on plan s1.0Details
revision to 201511132578 for fire notes on plan s1.0 | |
| Aug 9, 2016 | Never finaled issued Aug 2016, no final | 45 Brosnan St | street spaceDetails
street space | ||
| Mar 23, 2016 | Completed final sign-off Apr 2016 | 45 Brosnan St | Malagic Construction | #2: comply with complaint 201690901; replace shower tile, repair damage bath floor, replace broken glass on kitchen window, no structural work.Details
#2: comply with complaint 201690901; replace shower tile, repair damage bath floor, replace broken glass on kitchen window, no structural work. | $1,500 |
| Nov 13, 2015 | Completed final sign-off Jan 2017 | 45 Brosnan St | U S Prime Contractor Inc | mandatory soft story retrofit per sfbc chapter 34b. 2012 iebc appendix a-4. n/a for maherDetails
mandatory soft story retrofit per sfbc chapter 34b. 2012 iebc appendix a-4. n/a for maher | $80,000 |
| May 3, 2007 | Completed final sign-off May 2007 | 45 Brosnan St | Rivera Construction | repair minor dryrot on rear stairs and deck. less than 50% of the existing construction affected.Details
repair minor dryrot on rear stairs and deck. less than 50% of the existing construction affected. | $1,200 |
| Mar 13, 2007 | Never finaled issued Mar 2007, no final | 45 Brosnan St | street space permit only.Details
street space permit only. | ||
| Jan 10, 2007 | Never finaled issued Jan 2007, no final | 45 Brosnan St | street spaceDetails
street space | ||
| Jan 5, 2007 | Completed final sign-off Apr 2007 | 45 Brosnan St | Sam Afu | to renew building permit pa#200410055932.Details
to renew building permit pa#200410055932. | $8,000 |
| Nov 8, 2006 | Never finaled issued Nov 2006, no final | 45 Brosnan St | street space permitDetails
street space permit | ||
| Oct 17, 2006 | Never finaled issued Oct 2006, no final | 45 Brosnan St | street space permitDetails
street space permit | ||
| May 3, 2006 | Expired or cancelled expired Sep 2007 | 45 Brosnan St | anchor bolts throughout/top and bottom connectors at all posts in basement approx 21 post. refer to app#200601273265Details
anchor bolts throughout/top and bottom connectors at all posts in basement approx 21 post. refer to app#200601273265 | $12,000 | |
| Jan 27, 2006 | Never finaled issued Jan 2006, no final | 45 Brosnan St | renew;200410055932 to start and complete workDetails
renew;200410055932 to start and complete work | $8,000 | |
| Oct 5, 2004 | Never finaled issued Oct 2004, no final | 45 Brosnan St | epair of existing footings for partial bearing on soilDetails
epair of existing footings for partial bearing on soil | $8,000 | |
| Jun 30, 2004 | Never finaled issued Jun 2004, no final | 45 Brosnan St | correction for (e) footing partial bearing on soil.Details
correction for (e) footing partial bearing on soil. | $5,000 | |
| Sep 10, 2003 | Completed final sign-off Sep 2003 | 45 Brosnan St | One Stop Construction Co. | dry rot repair @ rear stairsDetails
dry rot repair @ rear stairs | $8,000 |