Nomellini Construction * Ask For Id *
- Based in
- Brisbane
- On San Francisco permits
- Aug 2013 to Jan 2023
- Last 24 months
- 0 permits filed
601 permits since 2000: 446 completed, 118 never finaled, 37 expired or cancelled.
Of the 118 never-finaled permits, 10 are 3 to 5 years old, 45 are 5 to 10 years old, 63 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
5 stairs permits: 3 completed, 1 never finaled, 1 expired or cancelled. Typically 85 days from filing to permit and 12 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 20, 2017 | Completed final sign-off Sep 2019 | 1029 Geary St | revision to 201612215531. repair stairs, provide 2nd means of egress to geary st sprinkler path of travel per nfpa 13Details
revision to 201612215531. repair stairs, provide 2nd means of egress to geary st sprinkler path of travel per nfpa 13 | $1,000 |
| Dec 29, 2016 | Never finaled issued Dec 2016, no final | 747 Ellis St | apt #5: kitchen & bathroom renovation. using current layout. no structural changes. to comply with 201647512-complete item #4, repair stairs ballister.Details
apt #5: kitchen & bathroom renovation. using current layout. no structural changes. to comply with 201647512-complete item #4, repair stairs ballister. | $25,000 |
| Feb 10, 2015 | Completed final sign-off Feb 2015 | 839 Leavenworth St | comply with nov 201414431 - repair stair read, supply proper handrial grip, provide 4 ???? for safety. provide guard rail on top of landingDetails
comply with nov 201414431 - repair stair read, supply proper handrial grip, provide 4 ???? for safety. provide guard rail on top of landing | $600 |
| Dec 3, 2014 | Expired or cancelled expired Sep 2018 | 48 Golden Gate Av | interior t/i to (e) professional services lease space: replace (e) main entrance/exit with new code complying doors, construct new professional services entry lobby and exit vestibles; provide new 2nd exit stair and corridor, raise existing residential floors at units 100 and 106 to provide additionDetails
interior t/i to (e) professional services lease space: replace (e) main entrance/exit with new code complying doors, construct new professional services entry lobby and exit vestibles; provide new 2nd exit stair and corridor, raise existing residential floors at units 100 and 106 to provide addition | $100,000 |
| Mar 17, 2014 | Completed final sign-off Jan 2017 | 825 Post St | all exterior main entry doors to be replace in kind. repaint, replace and add surface mtd ceiling lights and recessed wall lightrs in all common hallways. open walls for structure of roof deck. addition of roof deck and stair penthouse. relocate of doors at laundry and garbage room.Details
all exterior main entry doors to be replace in kind. repaint, replace and add surface mtd ceiling lights and recessed wall lightrs in all common hallways. open walls for structure of roof deck. addition of roof deck and stair penthouse. relocate of doors at laundry and garbage room. | $160,000 |