Back to kitchen remodel contractors
Michael E Miranda General Contractor
- Based in
- San Francisco
- On San Francisco permits
- Nov 2009 to Oct 2024
- Last 24 months
- 0 permits filed
106 permits since 2000: 75 completed, 3 in progress, 16 never finaled, 12 expired or cancelled.
Of the 16 never-finaled permits, 11 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
22 kitchen remodel permits: 18 completed, 3 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 156 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 16, 2023 | Completed final sign-off Jun 2023 | 3057 Sacramento St | unit 2: one kitchen & one bathroom upgrades, new cabinets, plumbing and eletrical fixtures, convert (e) closet to laundry, replace 8 (e) non street view windows in kind, no floor plan changesDetails
unit 2: one kitchen & one bathroom upgrades, new cabinets, plumbing and eletrical fixtures, convert (e) closet to laundry, replace 8 (e) non street view windows in kind, no floor plan changes | $24,000 |
| Jan 29, 2020 | Completed final sign-off Sep 2020 | 857 Church St | remodel 1 kitchen using (e) flor plan envelope. new fixtures, appliances, cabinets, countertops and lighting. no exterior work.Details
remodel 1 kitchen using (e) flor plan envelope. new fixtures, appliances, cabinets, countertops and lighting. no exterior work. | $35,000 |
| Jun 15, 2018 | Never finaled issued Jun 2018, no final | 2230 Pacific Av | unit 101: kitchen remodel, use (e) floor plan, appliancesm fixtures in same location, water damage & dry rot repair in adjacent livingroom floor & walls, 140 sq. ft. max, maintain all (2) accessible heights & clearancesDetails
unit 101: kitchen remodel, use (e) floor plan, appliancesm fixtures in same location, water damage & dry rot repair in adjacent livingroom floor & walls, 140 sq. ft. max, maintain all (2) accessible heights & clearances | $20,000 |
| May 9, 2018 | Completed final sign-off Oct 2018 | 506 Grove St | apt 104: upgrade kichen & bathrom elect. reinstall sinks, toilet upgrades to kitchen & bathroom in unit. replace (e) kitchen cabinets, countertop & tile in-kind.replace (e) tile in bathrom shower surround & bath floor. to comply with nov201862205.Details
apt 104: upgrade kichen & bathrom elect. reinstall sinks, toilet upgrades to kitchen & bathroom in unit. replace (e) kitchen cabinets, countertop & tile in-kind.replace (e) tile in bathrom shower surround & bath floor. to comply with nov201862205. | $7,000 |
| Dec 20, 2017 | Completed final sign-off Jul 2021 | 116 Whittier St | legalization (e) in-law unit per ordinance# 43-14. to comply with nov# 200869313, # 200993384 & # 201061553. replace a window - fire rate wall @ prop line. fire rate wall between in-law & garage. fire rate floor / ceiling. update kitchen & bath. install heat for the legalization of the illegal unit.Details
legalization (e) in-law unit per ordinance# 43-14. to comply with nov# 200869313, # 200993384 & # 201061553. replace a window - fire rate wall @ prop line. fire rate wall between in-law & garage. fire rate floor / ceiling. update kitchen & bath. install heat for the legalization of the illegal unit. | $58,350 |
| Sep 5, 2017 | Completed final sign-off Nov 2017 | 1565 Sacramento St | #4 - kitchen remodel - upgrade plumbing & elec. new lighting, cabinets, countertop , flooring. adjust sink location to accomdodate dishwasherDetails
#4 - kitchen remodel - upgrade plumbing & elec. new lighting, cabinets, countertop , flooring. adjust sink location to accomdodate dishwasher | $19,000 |
| Jun 22, 2017 | Completed final sign-off Jan 2018 | 4020 Folsom St | bath (master/1st floor) & kitchen remodel, replace (e) tub, toilet, vanity, install new tile, replace (e) range hood in kitchen, install (2) new cabinets, replace (e) incandescent lighting.Details
bath (master/1st floor) & kitchen remodel, replace (e) tub, toilet, vanity, install new tile, replace (e) range hood in kitchen, install (2) new cabinets, replace (e) incandescent lighting. | $34,000 |
| Jun 8, 2017 | Completed final sign-off Jan 2018 | 300 Bocana St | kitchen & bath remodel #2 no floor plan changes, replace all (e) plumbing & electrical fixturesDetails
kitchen & bath remodel #2 no floor plan changes, replace all (e) plumbing & electrical fixtures | $35,000 |
| May 30, 2017 | Completed final sign-off May 2018 | 2722 Irving St | remodel powder room and add new pantry at 2nd floor kitchen. replace windows at rear facade on 2nd story. renovate 3rd floor master bath. remodel bedroom closetsDetails
remodel powder room and add new pantry at 2nd floor kitchen. replace windows at rear facade on 2nd story. renovate 3rd floor master bath. remodel bedroom closets | $30,000 |
| Apr 11, 2017 | Completed final sign-off Jun 2017 | 1565 Sacramento St | replace (e) tub with site built shower. (e) toilet and sink to remain.convert adjacent closet to stack laundry. re-tile kitchen backsplash and fireplace.Details
replace (e) tub with site built shower. (e) toilet and sink to remain.convert adjacent closet to stack laundry. re-tile kitchen backsplash and fireplace. | $11,000 |
| Nov 22, 2016 | Never finaled issued Nov 2016, no final | 51 Bridgeview Dr | remodel (e) 1/f kitchen and bathroom. no walls moved, removed, added or infilled. all (e) layouts remain unchanged. install new garage door opener, drywall repairs. repair rot and termite damage at rear of poperty, siding and framing in-kind.Details
remodel (e) 1/f kitchen and bathroom. no walls moved, removed, added or infilled. all (e) layouts remain unchanged. install new garage door opener, drywall repairs. repair rot and termite damage at rear of poperty, siding and framing in-kind. | $20,000 |
| Nov 15, 2016 | Completed final sign-off Jan 2017 | 2262 Pine St | remodel (e) bathroom, replace tub with shower pan, replace (e) counter tops & appliances in kitchen, change stove from electric to gas, repalce kitchen windowDetails
remodel (e) bathroom, replace tub with shower pan, replace (e) counter tops & appliances in kitchen, change stove from electric to gas, repalce kitchen window | $20,000 |
| Sep 7, 2016 | Completed final sign-off Jan 2017 | 720 York St | apt 207: kitchen, bath & laundry remodel, no floor plan changesDetails
apt 207: kitchen, bath & laundry remodel, no floor plan changes | $28,000 |
| Aug 15, 2016 | Completed final sign-off Apr 2021 | 106 Leese St | add an adu per ordinance 30-15. permit #201608104660. new dwelling with kitchen & 2 bathrooms at lower level. new unit will be fire sprinklered under separate permit.Details
add an adu per ordinance 30-15. permit #201608104660. new dwelling with kitchen & 2 bathrooms at lower level. new unit will be fire sprinklered under separate permit. | $100,000 |
| Feb 11, 2016 | Never finaled issued Mar 2016, no final | 4040 24th St | interior alteration of an existing office space: 3 new office conference rooms, 2 new offices, 1 new kitchen, 3 new windows at rear, (n) ceiling tiles, (n) lighting, (n) finishes.Details
interior alteration of an existing office space: 3 new office conference rooms, 2 new offices, 1 new kitchen, 3 new windows at rear, (n) ceiling tiles, (n) lighting, (n) finishes. | $110,000 |
| Oct 19, 2015 | Completed final sign-off Feb 2016 | 3357 Folsom St | kitchen and bathroom remodel in existing space. new appliances, cabinets, countertops and plumbing fixtures in kitchen. new cabinet and sink and fixtures in bath. (e) tub to remain. no wall moved, removed, added. all existing layouts unchanged.Details
kitchen and bathroom remodel in existing space. new appliances, cabinets, countertops and plumbing fixtures in kitchen. new cabinet and sink and fixtures in bath. (e) tub to remain. no wall moved, removed, added. all existing layouts unchanged. | $20,000 |
| May 13, 2015 | Expired or cancelled expired Dec 2016 | 4630 Fulton St | 2nd floor: remodel kitchen and 1/2 bath on 2nd floor. remove partition walls at kitchen. 3rd floor:remodel 2 bathrooms and add washer and dryer. enlarge closet, remove partition wall at rear bedroom.Details
2nd floor: remodel kitchen and 1/2 bath on 2nd floor. remove partition walls at kitchen. 3rd floor:remodel 2 bathrooms and add washer and dryer. enlarge closet, remove partition wall at rear bedroom. | $50,000 |
| Apr 14, 2014 | Completed final sign-off Sep 2014 | 52 Exeter St | electrical upgrade, new service, existing kitchen, master bath, guest bath and laundry remodel, minor non-structural framing, dry rot repair as may be required, plumbing & electrical upgrade under seperate permits.Details
electrical upgrade, new service, existing kitchen, master bath, guest bath and laundry remodel, minor non-structural framing, dry rot repair as may be required, plumbing & electrical upgrade under seperate permits. | $75,000 |
| Aug 12, 2013 | Completed final sign-off Oct 2013 | 1001 Pine St | kitchen remodel, install new cabinets, sink, appliances, and counter tops, remove old, water damged kitchen partions wall and repair with new metal stud wall & 5/8 type x gyp board.Details
kitchen remodel, install new cabinets, sink, appliances, and counter tops, remove old, water damged kitchen partions wall and repair with new metal stud wall & 5/8 type x gyp board. | $18,000 |
| Jan 11, 2013 | Completed final sign-off Jul 2013 | 3909 23rd St | renovation of extg 1000 sq ft residential unit including kitchen remodel and a new bathroom. install new forced air gas furnace and new tankless on demand water heater. relocate extg laudnry room. all on 2nd floor. replace windows with wood dbl hung and lugDetails
renovation of extg 1000 sq ft residential unit including kitchen remodel and a new bathroom. install new forced air gas furnace and new tankless on demand water heater. relocate extg laudnry room. all on 2nd floor. replace windows with wood dbl hung and lug | $55,000 |
| Dec 18, 2012 | Completed final sign-off Nov 2013 | 86 Bridgeview Dr | kitchen remodel, replace existing 2nd flr doors, 2nd flr living room, dining room, lighting and drywall repairDetails
kitchen remodel, replace existing 2nd flr doors, 2nd flr living room, dining room, lighting and drywall repair | $20,000 |
| Nov 27, 2012 | Completed final sign-off Feb 2013 | 1169 Guerrero St | kitchen remodel, new lighting, electrical & plumbming, caniets, counter tops and flooring.Details
kitchen remodel, new lighting, electrical & plumbming, caniets, counter tops and flooring. | $25,000 |