Block 0580, lot 021
2230 Pacific Av
- City’s use
- Single Family Residential
- Built
- 1949
- Stories
- 1
- Units
- 1
- Rooms
- 1 bathroom
- Building
- 730 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
12 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 1, 2025 | Completed final sign-off Sep 2026 | 2230 Pacific Av | Tadek Constructions | unit #101: bathroom face lift in kind, shower, tub, vanity, and toilet. plumbing stays the same and no wall changes. replace tile, new paint, and change light.Details
unit #101: bathroom face lift in kind, shower, tub, vanity, and toilet. plumbing stays the same and no wall changes. replace tile, new paint, and change light. | $9,800 |
| Aug 29, 2024 | Completed final sign-off Jan 2025 | 2230 Pacific Av | Crime Watch Security Sys Llc | upgrade existing fire alarm system to comply with sffc 1103.7.6.1 all unitsDetails
upgrade existing fire alarm system to comply with sffc 1103.7.6.1 all units | $36,800 |
| Nov 23, 2021 | Never finaled issued Nov 2021, no final | 2230 Pacific Av | recommencement and completion of work approved under pa# 201806152058Details
recommencement and completion of work approved under pa# 201806152058 | $5,000 | |
| Jul 26, 2019 | Completed final sign-off Aug 2019 | 2230 Pacific Av | Michael E Miranda General Contractor | repair in kind parking garage door, door framing and exterior stucco. repair damage caused by motor vehicle.Details
repair in kind parking garage door, door framing and exterior stucco. repair damage caused by motor vehicle. | $12,000 |
| Nov 15, 2018 | Never finaled issued Nov 2018, no final | 2230 Pacific Av | street spaceDetails
street space | ||
| Oct 30, 2018 | Expired or cancelled cancelled Jan 2026 | 2230 Pacific Av | Michael E Miranda General Contractor | revision to pa 201806152058, to include minor structural alterations per engineer directionl minor adjustment of bearing walls require additional support for ceiling joist lap splices. no change to plumbing/electrical.Details
revision to pa 201806152058, to include minor structural alterations per engineer directionl minor adjustment of bearing walls require additional support for ceiling joist lap splices. no change to plumbing/electrical. | $500 |
| Jul 23, 2018 | Never finaled issued Jul 2018, no final | 2230 Pacific Av | street spaceDetails
street space | ||
| Jun 15, 2018 | Never finaled issued Jun 2018, no final | 2230 Pacific Av | Michael E Miranda General Contractor | unit 101: kitchen remodel, use (e) floor plan, appliancesm fixtures in same location, water damage & dry rot repair in adjacent livingroom floor & walls, 140 sq. ft. max, maintain all (2) accessible heights & clearancesDetails
unit 101: kitchen remodel, use (e) floor plan, appliancesm fixtures in same location, water damage & dry rot repair in adjacent livingroom floor & walls, 140 sq. ft. max, maintain all (2) accessible heights & clearances | $20,000 |
| Jul 6, 2017 | Never finaled issued Jul 2017, no final | 2230 Pacific Av | street spaceDetails
street space | ||
| Mar 17, 2017 | Completed final sign-off Apr 2017 | 2230 Pacific Av | Super Roofing Company | reroofingDetails
reroofing | $30,000 |
| Mar 3, 2017 | Completed final sign-off Jul 2020 | 2230 Pacific Av | Michael E Miranda General Contractor | soft story seismic retrofit in accordance with mandatory city of sf ord - tier iii. soft story retrofit per sfebc chapter 4d engineering criteria: other rational design.Details
soft story seismic retrofit in accordance with mandatory city of sf ord - tier iii. soft story retrofit per sfebc chapter 4d engineering criteria: other rational design. | $75,000 |
| Feb 22, 2000 | Completed final sign-off Jun 2000 | 2230 Pacific Av | Marcus Aurelius Construction | remove and install new ceramic title floor in lobby, linoleum in laundry roomDetails
remove and install new ceramic title floor in lobby, linoleum in laundry room |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.