Joseph Quilici
- Listed as
- engineer
- Firm
- Quilici Engineers Inc.
- Based in
- Campbell
- On San Francisco permits
- Jan 2006 to Mar 2022
23 permits since 2000 (engineer on 23 permits): 17 completed, 5 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 1, 2022 | Completed final sign-off Jun 2022 | 5000 Diamond Heights Bl | The G B Group Inc. | remove and replace dryrot framing per plans. install approx 125 sf of bldg paper.install approx 125 sf of stucco like for like. install approx 50 sf of wood shingles siding like for like. remove & replace window trim like for like. prime and paint all (n) material to match. install approx 125 sf ofDetails
remove and replace dryrot framing per plans. install approx 125 sf of bldg paper.install approx 125 sf of stucco like for like. install approx 50 sf of wood shingles siding like for like. remove & replace window trim like for like. prime and paint all (n) material to match. install approx 125 sf of | $32,500 |
| Mar 1, 2022 | Never finaled issued Apr 2022, no final | 5004 Diamond Heights Bl | The G B Group Inc. | remove and replace dryrot framing per plans. install approx 125 sf of bldg paper.install approx 125 sf of stucco like for like. install approx 50 sf of wood shingles siding like for like. remove & replace window trim like for like. prime and paint all (n) material to match. install approx 125 sf ofDetails
remove and replace dryrot framing per plans. install approx 125 sf of bldg paper.install approx 125 sf of stucco like for like. install approx 50 sf of wood shingles siding like for like. remove & replace window trim like for like. prime and paint all (n) material to match. install approx 125 sf of | $48,000 |
| Jun 9, 2021 | Completed final sign-off Jul 2021 | 1200 Clayton St | Axis Construction | inspector's revision request per engineer's drawings. dryrot repairs at entrance door's framing. ref pa 202101192886.Details
inspector's revision request per engineer's drawings. dryrot repairs at entrance door's framing. ref pa 202101192886. | $3,000 |
| Mar 1, 2021 | Completed final sign-off May 2022 | 1326 Scott St | Axis Construction | retaining wall/fence replacement. demo ~25 lf of concrete retaining wall & wood fence. install & dowel in (n) rebar for (n) footing & retaining wall. set dowels in epoxy. pour concrete retaining wall to resemble (e) as close as possible. install (n) pt wood fence.Details
retaining wall/fence replacement. demo ~25 lf of concrete retaining wall & wood fence. install & dowel in (n) rebar for (n) footing & retaining wall. set dowels in epoxy. pour concrete retaining wall to resemble (e) as close as possible. install (n) pt wood fence. | $15,000 |
| Jan 15, 2021 | Completed final sign-off May 2021 | 5040 Diamond Heights Bl | The G B Group Inc. | #5044: remove/replace ~420 sq. ft. stucco. new water proofing as needed. remove (e) 4x headers at patio door & install new 3.5x11.25 psl. replace decayed framing like for like. remove/replace (e) plywood 420sf like for like. add straps per engineering drawing. not visible from street.Details
#5044: remove/replace ~420 sq. ft. stucco. new water proofing as needed. remove (e) 4x headers at patio door & install new 3.5x11.25 psl. replace decayed framing like for like. remove/replace (e) plywood 420sf like for like. add straps per engineering drawing. not visible from street. | $17,635 |
| Jan 15, 2021 | Completed final sign-off May 2021 | 5040 Diamond Heights Bl | The G B Group Inc. | #5032: remove/replace approx. 420 sq. ft. stucco. new water proofing as needed. remove (e) 4x headers at patio door and install new 3.5x11.25 psl. replace decayed framing like for like. remove/replace (e) plywood 420sf like for like. add straps per engineering drawing. not visible from street.Details
#5032: remove/replace approx. 420 sq. ft. stucco. new water proofing as needed. remove (e) 4x headers at patio door and install new 3.5x11.25 psl. replace decayed framing like for like. remove/replace (e) plywood 420sf like for like. add straps per engineering drawing. not visible from street. | $17,635 |
| Jan 15, 2021 | Completed final sign-off May 2021 | 5040 Diamond Heights Bl | The G B Group Inc. | #5036: remove/replace approx. 150 sq. ft. stucco. new water proofing as needed. remove (e) 4x headers at patio door and install new 3.5x11.25 psl. replace decayed framing like for like. remove/replace (e) plywood like for like. add straps per engineering drawing. not visible from street.Details
#5036: remove/replace approx. 150 sq. ft. stucco. new water proofing as needed. remove (e) 4x headers at patio door and install new 3.5x11.25 psl. replace decayed framing like for like. remove/replace (e) plywood like for like. add straps per engineering drawing. not visible from street. | $17,635 |
| May 30, 2019 | Completed final sign-off Sep 2019 | 115 Red Rock Wy | Andrew Chekene Enterprises/ Dba Ac Enter | revision to pa #201812107850. repair of existing pedestrial pool gates and existing enclosure. structural drawings to accompany previously approved architectural drawings.Details
revision to pa #201812107850. repair of existing pedestrial pool gates and existing enclosure. structural drawings to accompany previously approved architectural drawings. | |
| Jan 14, 2019 | Completed final sign-off Feb 2019 | 357 Castenada Av | to ocmply with nov 201710951 retaining wall maher naDetails
to ocmply with nov 201710951 retaining wall maher na | $7,500 | |
| Dec 28, 2017 | Completed final sign-off Apr 2018 | 100 Parker Av | Andrew Chekene Enterprises/ Dba Ac Enter | foundation revision to existing permit #201711204439. soft story retrofitDetails
foundation revision to existing permit #201711204439. soft story retrofit | |
| Nov 9, 2017 | Completed final sign-off Apr 2018 | 100 Parker Av | Andrew Chekene Enterprises/ Dba Ac Enter | common area- revision to soft story pa#201607142420, updated and revised structural details due to field conditions, framing offsets.Details
common area- revision to soft story pa#201607142420, updated and revised structural details due to field conditions, framing offsets. | |
| Nov 8, 2017 | Completed final sign-off Sep 2018 | 130 Grand View Av | Craig Freeman | revision to pa #201705045726 to comply with nov 201767651 #2 - add engineered plans only for remedial repair of 2 decks (structural)Details
revision to pa #201705045726 to comply with nov 201767651 #2 - add engineered plans only for remedial repair of 2 decks (structural) | $25,000 |
| Jun 23, 2017 | Completed final sign-off Nov 2018 | 2912 Steiner St | Blue Mountain Construction Services Inc | soft story seismic upgrade per city ord 2016 cebc app a-4.Details
soft story seismic upgrade per city ord 2016 cebc app a-4. | $60,000 |
| May 16, 2017 | Never finaled issued May 2017, no final | 1300 Ridge Ln | The G B Group Inc. | remove and replace walkway containing dry rot like and kind - pre paint repairs. remove and replace post like and kind per plans.Details
remove and replace walkway containing dry rot like and kind - pre paint repairs. remove and replace post like and kind per plans. | $4,000 |
| May 16, 2017 | Never finaled issued May 2017, no final | 1000 Saddleback Dr | The G B Group Inc. | remove and replace walkway containing dry rot like and kind - pre paint repairs. remove and replace post like and kind per plans.Details
remove and replace walkway containing dry rot like and kind - pre paint repairs. remove and replace post like and kind per plans. | $4,000 |
| Mar 3, 2017 | Completed final sign-off Jul 2020 | 2230 Pacific Av | Michael E Miranda General Contractor | soft story seismic retrofit in accordance with mandatory city of sf ord - tier iii. soft story retrofit per sfebc chapter 4d engineering criteria: other rational design.Details
soft story seismic retrofit in accordance with mandatory city of sf ord - tier iii. soft story retrofit per sfebc chapter 4d engineering criteria: other rational design. | $75,000 |
| Feb 13, 2017 | Never finaled issued Mar 2017, no final | 1500 Birchwood Ct | The G B Group Inc. | remove & replace walkway beams containing dryrot, like for kind (pre-paint repairs), remove & replace support post like & kind per plan.Details
remove & replace walkway beams containing dryrot, like for kind (pre-paint repairs), remove & replace support post like & kind per plan. | $4,000 |
| Feb 13, 2017 | Never finaled issued Mar 2017, no final | 1400 Birchwood Ct | The G B Group Inc. | remove & replace walkway beams containing dryrot, like for kind (pre-paint repairs), remove & replace support post like & kind per plan.Details
remove & replace walkway beams containing dryrot, like for kind (pre-paint repairs), remove & replace support post like & kind per plan. | $4,000 |
| Dec 16, 2016 | Completed final sign-off Nov 2017 | 1805 Pine St | Bai Construction | mandatory soft story retrofit. must comply with sffc 1103.6.1.Details
mandatory soft story retrofit. must comply with sffc 1103.6.1. | $50,000 |
| Jul 14, 2016 | Completed final sign-off Apr 2018 | 100 Parker Av | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4 | $30,000 | |
| Mar 22, 2016 | Completed final sign-off Mar 2016 | 39 Albion St | Moroso Construction Inc | revision to 201601076564 structural detailsDetails
revision to 201601076564 structural details | |
| Dec 21, 2012 | Completed final sign-off May 2023 | 3 Burnett Av | Robles Construction | structural repairs. sister (3) 1-3/4 x 11-1/4 lvl to (e) 6x12. sister c8x18.75 to (e) 4x12Details
structural repairs. sister (3) 1-3/4 x 11-1/4 lvl to (e) 6x12. sister c8x18.75 to (e) 4x12 | $8,500 |
| Jan 23, 2006 | Expired or cancelled expired Nov 2007 | 20 Presidio Av | construction of retaining walls and stairs, general landscaping and lighting, replacement of extg fire escape and ladder to roof, replacement of extg 2nd means of egressDetails
construction of retaining walls and stairs, general landscaping and lighting, replacement of extg fire escape and ladder to roof, replacement of extg 2nd means of egress | $40,000 |