Block 5746, lot 004
106 Leese St
- City’s use
- Multi-Family Residential
- Built
- 1905
- Stories
- 2
- Units
- 4
- Rooms
- 9 bedrooms, 6 bathrooms
- Building
- 4,337 sq ft
- Lot
- 3,101 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
16 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 30, 2026 | Completed final sign-off May 2026 | 106 Leese St | Combine Roofing Inc. | reroofing- no hot work. remove(e) asphalt shingle roof, install new underlayment and new 30 year architectural asphalt shingles.Details
reroofing- no hot work. remove(e) asphalt shingle roof, install new underlayment and new 30 year architectural asphalt shingles. | $54,970 |
| Dec 15, 2020 | Completed final sign-off Apr 2021 | 106 Leese St | Redwood City Alarms Inc | install supervisor fire alarm system and wireless audible devices for sf bedroom compliance.Details
install supervisor fire alarm system and wireless audible devices for sf bedroom compliance. | $6,000 |
| Aug 21, 2019 | Completed final sign-off Jan 2021 | 106 Leese St | Michael E Miranda General Contractor | replace front entry (street facing) steps, due to deterioration & dryrot. exist step are wood frame/terra cotta tile.Details
replace front entry (street facing) steps, due to deterioration & dryrot. exist step are wood frame/terra cotta tile. | $3,500 |
| Jul 29, 2019 | Never finaled issued Jul 2019, no final | 106 Leese St | street spaceDetails
street space | ||
| Jun 19, 2019 | Never finaled issued Jun 2019, no final | 106 Leese St | street spaceDetails
street space | ||
| Aug 29, 2018 | Never finaled issued Nov 2018, no final | 106 Leese St | Control Fire Inc. | ref pa# 201807174694; as-builts for instalattion of overhead fire protection sprinkler system, 16 sprinklers, nfpa 13 standard.Details
ref pa# 201807174694; as-builts for instalattion of overhead fire protection sprinkler system, 16 sprinklers, nfpa 13 standard. | $7,202 |
| Jul 17, 2018 | Completed final sign-off Apr 2021 | 106 Leese St | Control Fire Inc. | installation of partial over head and sprinklers 2" fire only underground for first floor fire protection sprinkler system. construction plans 201608154917. sprinkler monitoring separate permitDetails
installation of partial over head and sprinklers 2" fire only underground for first floor fire protection sprinkler system. construction plans 201608154917. sprinkler monitoring separate permit | $7,202 |
| Mar 30, 2018 | Never finaled issued Mar 2018, no final | 106 Leese St | street spaceDetails
street space | ||
| Nov 2, 2017 | Never finaled issued Nov 2017, no final | 108 Leese St | per pa #201608154972, add address to new unit at block 5746, lot 004 as; 108a leese streetDetails
per pa #201608154972, add address to new unit at block 5746, lot 004 as; 108a leese street | ||
| Oct 11, 2017 | Never finaled issued Oct 2017, no final | 106 Leese St | street space permitDetails
street space permit | ||
| Aug 15, 2016 | Completed final sign-off Apr 2021 | 106 Leese St | Michael E Miranda General Contractor | add an adu per ordinance 30-15. permit #201608104660. new dwelling with kitchen & 2 bathrooms at lower level. new unit will be fire sprinklered under separate permit.Details
add an adu per ordinance 30-15. permit #201608104660. new dwelling with kitchen & 2 bathrooms at lower level. new unit will be fire sprinklered under separate permit. | $100,000 |
| Aug 10, 2016 | Completed final sign-off Apr 2021 | 106 Leese St | Hawk N Lee Co | revisions to appn. 201605248220; revise administrative bulletin #98 to ab94 on scope of work for voluntary seismic upgrade.Details
revisions to appn. 201605248220; revise administrative bulletin #98 to ab94 on scope of work for voluntary seismic upgrade. | |
| May 24, 2016 | Completed final sign-off Apr 2021 | 106 Leese St | voluntary soft story retrofit per ab098 for seismic retrofit. method 2012 iebc appex 4aDetails
voluntary soft story retrofit per ab098 for seismic retrofit. method 2012 iebc appex 4a | $30,000 | |
| Aug 23, 2011 | Completed final sign-off Jan 2012 | 106 Leese St | conversion of (e) cottage basement at rear to new bedroom and bathroomDetails
conversion of (e) cottage basement at rear to new bedroom and bathroom | $20,000 | |
| Aug 22, 2011 | Never finaled issued Aug 2011, no final | 106 Leese St | rear building address: 106-a leese street.Details
rear building address: 106-a leese street. | ||
| Mar 30, 2001 | Completed final sign-off Jun 2001 | 108 Leese St | demolish existing illegal unit on ground floor, as noted an noticeDetails
demolish existing illegal unit on ground floor, as noted an notice | $2,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Control Fire Inc. (2), Michael E Miranda General Contractor (2), Combine Roofing Inc., Hawk N Lee Co, Redwood City Alarms Inc
- Architects
- David S. Locicero (2)
- Engineers
- Hawk Lee
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.