Michael E Miranda General Contractor
- Based in
- San Francisco
- On San Francisco permits
- Nov 2009 to Oct 2024
- Last 24 months
- 0 permits filed
106 permits since 2000: 75 completed, 3 in progress, 16 never finaled, 12 expired or cancelled.
Of the 16 never-finaled permits, 11 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
3 deck permits: 2 never finaled, 1 expired or cancelled. Typically 490 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 10, 2019 | Never finaled issued Sep 2019, no final | 110 Castenada Av | replace existing 4 panel sliding door in kind on the second floor (street view) max u-factor 0.32. repair 3rd floor wood deck 50 percent or less joist only (street view) railing and decking to remain - door is wood interior with fiber glass clad exterior.Details
replace existing 4 panel sliding door in kind on the second floor (street view) max u-factor 0.32. repair 3rd floor wood deck 50 percent or less joist only (street view) railing and decking to remain - door is wood interior with fiber glass clad exterior. | $9,500 |
| Oct 25, 2013 | Never finaled issued Jun 2016, no final | 86 Bridgeview Dr | construct new rear yard deck (2 levels, g/f & 2/f) add new master bedroom, bathroom and landing. install new gas fireplace, install one new rear window and 3 new exterior doors. termite rot repairs.Details
construct new rear yard deck (2 levels, g/f & 2/f) add new master bedroom, bathroom and landing. install new gas fireplace, install one new rear window and 3 new exterior doors. termite rot repairs. | $35,000 |
| Sep 16, 2013 | Expired or cancelled cancelled Jan 2026 | 1436 Revere Av | construct new wood deck 8'x25' with stairway to ground level, remove 2 rear windows & install 2 new sliding glass doors in same.Details
construct new wood deck 8'x25' with stairway to ground level, remove 2 rear windows & install 2 new sliding glass doors in same. | $7,500 |