Back to kitchen remodel contractors
M F Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2007 to Aug 2026
- Last 24 months
- 9 permits filed
177 permits since 2000: 149 completed, 1 in progress, 11 never finaled, 16 expired or cancelled.
Of the 11 never-finaled permits, 1 is 3 to 5 years old, 5 are 5 to 10 years old, 5 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
32 kitchen remodel permits: 28 completed, 2 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 133 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 8, 2025 | Completed final sign-off Feb 2026 | 2711 Octavia St | unit 102: replace kitchen cabinets and counters, remove carpet and place hardwood flooring.Details
unit 102: replace kitchen cabinets and counters, remove carpet and place hardwood flooring. | $50,000 |
| Sep 18, 2025 | Completed final sign-off Jul 2026 | 415 Fillmore St | remodel existing kitchen and two bathrooms new cabinets new counters new tile repair lath and plaster patch with sheet rock. no removal of wallsDetails
remodel existing kitchen and two bathrooms new cabinets new counters new tile repair lath and plaster patch with sheet rock. no removal of walls | $100,000 |
| Dec 2, 2020 | Never finaled issued Dec 2020, no final | 296 Clipper St | remodel kitchen and bathroom in existing configuration.Details
remodel kitchen and bathroom in existing configuration. | $40,000 |
| Oct 2, 2019 | Completed final sign-off Nov 2022 | 170 Day St | gr fl 3 bedrooms, 2 full baths, stairs to all 3 floors. 2nd fl remodel kitchen, 1/2 bath, relocate living rm, din rm, family rm, new rear deck. convert attic to master bdrm, bath, roof deck, dormers, skylightsDetails
gr fl 3 bedrooms, 2 full baths, stairs to all 3 floors. 2nd fl remodel kitchen, 1/2 bath, relocate living rm, din rm, family rm, new rear deck. convert attic to master bdrm, bath, roof deck, dormers, skylights | $200,000 |
| Jul 18, 2018 | Completed final sign-off Dec 2020 | 1723 Noe St | (front bldg) for upper unit of front 2-unit residence. relocate (e) kitchen. add two and replace one double-hung wood windows at existing study. replace (e) sliding door with new 8' wood sliding door.Details
(front bldg) for upper unit of front 2-unit residence. relocate (e) kitchen. add two and replace one double-hung wood windows at existing study. replace (e) sliding door with new 8' wood sliding door. | $30,000 |
| Oct 12, 2017 | Completed final sign-off Aug 2018 | 141 Gough St | #8 - remodel kitchen and bath unit #8Details
#8 - remodel kitchen and bath unit #8 | $15,000 |
| Oct 12, 2017 | Completed final sign-off Aug 2018 | 141 Gough St | #7 - remodel kitchens and baths in unit #7Details
#7 - remodel kitchens and baths in unit #7 | $15,000 |
| Aug 16, 2017 | Completed final sign-off Jun 2018 | 350 Colon Av | kitchen remodel: replace cabinets, coutner,s fi8xtures, lighting & appliances. refinish existing flooring, repair rotted, leaking windows @ kitchen not street visible, repair stucco @ windows, u-factor 0.32max.Details
kitchen remodel: replace cabinets, coutner,s fi8xtures, lighting & appliances. refinish existing flooring, repair rotted, leaking windows @ kitchen not street visible, repair stucco @ windows, u-factor 0.32max. | $60,000 |
| Jul 13, 2017 | Completed final sign-off May 2018 | 337 Warren Dr | remove existing walls doors, finishes. new walls, door, install new finishes. remodel kitchen and bath.add media room, bedroom & bathroom on level 1.Details
remove existing walls doors, finishes. new walls, door, install new finishes. remodel kitchen and bath.add media room, bedroom & bathroom on level 1. | $125,000 |
| Jul 22, 2016 | Completed final sign-off Dec 2016 | 306 Fell St | remodel kitchen & bathroom (new cabinets) new counters, new tile, new fixtures, upgrade electricalDetails
remodel kitchen & bathroom (new cabinets) new counters, new tile, new fixtures, upgrade electrical | $30,000 |
| May 12, 2016 | Completed final sign-off Sep 2016 | 1535 Chestnut St | remodel kitchen and 2 bathrooms in unit # 303Details
remodel kitchen and 2 bathrooms in unit # 303 | $50,000 |
| Aug 25, 2015 | Completed final sign-off Dec 2015 | 21 Marview Wy | remodel kitchen & (2) bathrooms. no change to layout of fixtures. new cabinets, counters, flooring, tile & fixtures.Details
remodel kitchen & (2) bathrooms. no change to layout of fixtures. new cabinets, counters, flooring, tile & fixtures. | $30,000 |
| Mar 10, 2015 | Completed final sign-off Mar 2016 | 217 San Carlos St | renovation of upper unit 217 on 3rd floor of extg duplex. relocate extg bedroom, kitchen, and bathroom and add half bath. add interior stair and roof hatch to access new roof deck(392 sq ft)Details
renovation of upper unit 217 on 3rd floor of extg duplex. relocate extg bedroom, kitchen, and bathroom and add half bath. add interior stair and roof hatch to access new roof deck(392 sq ft) | $100,000 |
| Aug 15, 2014 | Completed final sign-off Nov 2015 | 215 San Carlos St | renovation of lower unit #215 of extg duplex. relocate extg bedroom, kitchen, bathroom and add half bath on 2nd floor. add interior stair to connect new family room, master bedroom, master bathroom and laundry closet plus or minus sq ft on 1st floor.Details
renovation of lower unit #215 of extg duplex. relocate extg bedroom, kitchen, bathroom and add half bath on 2nd floor. add interior stair to connect new family room, master bedroom, master bathroom and laundry closet plus or minus sq ft on 1st floor. | $80,000 |
| Jul 30, 2014 | Completed final sign-off May 2016 | 1230 Castro St | physical inspection report #cc 7197 remove undocumented kitchen at ground floor. correct record to reflect (e) 1940's 4th fl bedroom.Details
physical inspection report #cc 7197 remove undocumented kitchen at ground floor. correct record to reflect (e) 1940's 4th fl bedroom. | $1,000 |
| Apr 21, 2014 | Completed final sign-off Jul 2014 | 3918 Sacramento St | kitchen & 2 baths remodel; remove lath & lath plaster; rewire, new plumbing, new sheetrock;, new tile new cabinets new fixtures; replace doors. comply with cec150(k) 8 & 10Details
kitchen & 2 baths remodel; remove lath & lath plaster; rewire, new plumbing, new sheetrock;, new tile new cabinets new fixtures; replace doors. comply with cec150(k) 8 & 10 | $38,000 |
| Feb 19, 2013 | Completed final sign-off Jun 2013 | 638 Cayuga Av | kitchen remodel. replace cabinets, counter floor & trim. replace skylite which is 6' from property line. repair rotter roof framing. repair roof.Details
kitchen remodel. replace cabinets, counter floor & trim. replace skylite which is 6' from property line. repair rotter roof framing. repair roof. | $30,000 |
| Dec 27, 2012 | Expired or cancelled expired Oct 2016 | 365 25th Av | 365 remodel bathroom remodel & reconfigure kitchen , 367 remodel bathroom remodel kitchen , remove lathr & plaster on interior to min 1hr between unit, install radiant floor heating upgrade electrical & plumbing insall tankless waterh eater.Details
365 remodel bathroom remodel & reconfigure kitchen , 367 remodel bathroom remodel kitchen , remove lathr & plaster on interior to min 1hr between unit, install radiant floor heating upgrade electrical & plumbing insall tankless waterh eater. | $30,000 |
| Sep 19, 2012 | Never finaled issued Sep 2012, no final | 3993 24th St | remodel kitchen in residential unit. replace cabinets, counter and sink lighting to comply with t-24. to comply with cbc 420.4 for co alarms.Details
remodel kitchen in residential unit. replace cabinets, counter and sink lighting to comply with t-24. to comply with cbc 420.4 for co alarms. | $12,000 |
| Jul 5, 2012 | Completed final sign-off Oct 2012 | 740 39th Av | revision to app#200404282452 renewal app#201204037450. provide flatroof scope at rear to match extg roof. reconfigure and rearrange 3rd floor.remove interior non bearing wall at 2nd floor kitchen. replace extg metal spiral stair with new wood stair.Details
revision to app#200404282452 renewal app#201204037450. provide flatroof scope at rear to match extg roof. reconfigure and rearrange 3rd floor.remove interior non bearing wall at 2nd floor kitchen. replace extg metal spiral stair with new wood stair. | $35,000 |
| Nov 9, 2011 | Completed final sign-off Jan 2012 | 2574 41st Av | kitchen remodel - new cabinets, counters, flooring, trim, fixturers. all (n) lighting must comply w/cec 150(k).Details
kitchen remodel - new cabinets, counters, flooring, trim, fixturers. all (n) lighting must comply w/cec 150(k). | $25,000 |
| Oct 11, 2011 | Completed final sign-off Apr 2012 | 224 Ordway St | legalize bedroom & bath @ 1st floor, remodel kitchen & bath, change doors & casing, replace trim & baseboard, repair & replace lath & plaster w/gyp borad, repair & replace "in-kind" windows in living room & bedroom at front on 2nd floor , repair damaged dryrot areas at front.Details
legalize bedroom & bath @ 1st floor, remodel kitchen & bath, change doors & casing, replace trim & baseboard, repair & replace lath & plaster w/gyp borad, repair & replace "in-kind" windows in living room & bedroom at front on 2nd floor , repair damaged dryrot areas at front. | $25,000 |
| Jun 27, 2011 | Completed final sign-off Oct 2011 | 580 Banks St | add family room, bathroom, 2 bedrooms on 1st floor. upgrade existing interior stair. remodel existing kitchen and bath on 2nd fl. replace 13 windows in kindDetails
add family room, bathroom, 2 bedrooms on 1st floor. upgrade existing interior stair. remodel existing kitchen and bath on 2nd fl. replace 13 windows in kind | $50,000 |
| Mar 4, 2011 | Completed final sign-off Nov 2011 | 537 Congo St | remodel kitchen, baths, demo lath & plaster, rewire, replumb, install new gypsum board, comply with his nov #200338890 (repair front stairway)Details
remodel kitchen, baths, demo lath & plaster, rewire, replumb, install new gypsum board, comply with his nov #200338890 (repair front stairway) | $55,000 |
| Dec 1, 2010 | Completed final sign-off Mar 2011 | 3912 Folsom St | remodel kitchen and bath. remove cabinets and fixtures & replace with new. repalce windows at front with wood rear with vinyl, u factor =.40. repair dryrot at front facade. provide high efficency lights or o.s. per cec150(k)Details
remodel kitchen and bath. remove cabinets and fixtures & replace with new. repalce windows at front with wood rear with vinyl, u factor =.40. repair dryrot at front facade. provide high efficency lights or o.s. per cec150(k) | $40,000 |
| Mar 2, 2010 | Completed final sign-off Apr 2010 | 796 Moultrie St | remodel kitchen & bath on bottom unit. stair repair @ rear less than 50%.lighting per cec 150 k . no change ti exhust systemDetails
remodel kitchen & bath on bottom unit. stair repair @ rear less than 50%.lighting per cec 150 k . no change ti exhust system | $15,000 |
| Jan 26, 2010 | Completed final sign-off Mar 2010 | 794 Moultrie St | work on #794 only remodel kitchen & bathroom on top floor unitDetails
work on #794 only remodel kitchen & bathroom on top floor unit | $10,000 |
| Oct 10, 2008 | Completed final sign-off Oct 2008 | 726 Ellsworth St | to comply w/ nov 200874534, to remove kitchen & bath at ground floor.Details
to comply w/ nov 200874534, to remove kitchen & bath at ground floor. | $5,000 |
| Sep 19, 2008 | Completed final sign-off Jul 2009 | 55 Manchester St | remove lath & plaster, rewire, repair plumbing, install gyp board, install new doors & windows @ rear install new trim & casing. remodel kitchens (2) & baths(4) . repair dryrot, paint comply w/nov#2000338855 items 2.3.4.5. reroofDetails
remove lath & plaster, rewire, repair plumbing, install gyp board, install new doors & windows @ rear install new trim & casing. remodel kitchens (2) & baths(4) . repair dryrot, paint comply w/nov#2000338855 items 2.3.4.5. reroof | $75,000 |
| Jul 15, 2008 | Completed final sign-off Apr 2009 | 2569 Post St | remove kitchen in unit 2571. repair dryrot @ rear stairs.Details
remove kitchen in unit 2571. repair dryrot @ rear stairs. | |
| Feb 5, 2008 | Expired or cancelled cancelled Jan 2020 | 151 23rd Av | comply with physical inspectio report 3r-5120 to change 2nd & 3rd floor bathrooms & kitchen. add door on 1st floor & 4th floor. convert single bathroom into two batrooms at 2nd & 3rd floor, extend countertop in kitchen. new windows on 2nd & 3rd floor.Details
comply with physical inspectio report 3r-5120 to change 2nd & 3rd floor bathrooms & kitchen. add door on 1st floor & 4th floor. convert single bathroom into two batrooms at 2nd & 3rd floor, extend countertop in kitchen. new windows on 2nd & 3rd floor. | $50,000 |
| Dec 11, 2007 | Completed final sign-off Apr 2008 | 760 Anderson St | kitchen and 2 bath remodel, rmove wall coverings, add insulation add gypboard, replace sliding dodor at rear, new floor coverings and furnace, new vinyl windows not visible from streetDetails
kitchen and 2 bath remodel, rmove wall coverings, add insulation add gypboard, replace sliding dodor at rear, new floor coverings and furnace, new vinyl windows not visible from street | $30,000 |