Block 0838, lot 003
145 Gough St
- City’s use
- Multi-Family Residential
- Built
- 1913
- Stories
- 3
- Units
- 10
- Rooms
- 4 bedrooms, 10 bathrooms
- Building
- 5,970 sq ft
- Lot
- 2,622 sq ft
- Zoning
- HAYES
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
16 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 14, 2022 | Never finaled filed Dec 2022, never issued | 145 Gough St | C & E Electric & Fire Alarm Services | voluntry new sytem install and replacing like for like to meet sffc 209 sec 1103.7.6.1. add horn strobe and pull station in commercial space.Details
voluntry new sytem install and replacing like for like to meet sffc 209 sec 1103.7.6.1. add horn strobe and pull station in commercial space. | $26,600 |
| Jul 3, 2018 | Completed final sign-off Aug 2018 | 145 Gough St | M F Construction | #7 -rev to pa 2017 1012 1040 -change adddress to 145 gough st.Details
#7 -rev to pa 2017 1012 1040 -change adddress to 145 gough st. | |
| Jul 3, 2018 | Completed final sign-off Aug 2018 | 145 Gough St | M F Construction | #8 -rev to pa 2017 1012 1039 - change address to 145 gough st.Details
#8 -rev to pa 2017 1012 1039 - change address to 145 gough st. | |
| May 8, 2018 | Completed final sign-off Jun 2018 | 141 Gough St | S'top Roofing Company Inc | reroofingDetails
reroofing | $18,800 |
| Oct 12, 2017 | Completed final sign-off Aug 2018 | 141 Gough St | M F Construction | #7 - remodel kitchens and baths in unit #7Details
#7 - remodel kitchens and baths in unit #7 | $15,000 |
| Oct 12, 2017 | Completed final sign-off Aug 2018 | 141 Gough St | M F Construction | #8 - remodel kitchen and bath unit #8Details
#8 - remodel kitchen and bath unit #8 | $15,000 |
| May 30, 2017 | Completed final sign-off Nov 2018 | 141 Gough St | change of use from retail to restaurant. no contruction or work needed. space to be used as is. no structure change.Details
change of use from retail to restaurant. no contruction or work needed. space to be used as is. no structure change. | ||
| Feb 11, 2016 | Completed final sign-off Jun 2016 | 141 Gough St | West Coast Premier Construction Inc | soft story seismic retrofit per sfbc chapter 34b per 2012 iebc appendix a-4. residential cost application.Details
soft story seismic retrofit per sfbc chapter 34b per 2012 iebc appendix a-4. residential cost application. | $120,000 |
| Feb 11, 2016 | Completed final sign-off Jun 2016 | 141 Gough St | West Coast Premier Construction Inc | soft story seismic retrofit per sfbc chapter 34b per 2012 iebc appendix a-4. retail cost application.Details
soft story seismic retrofit per sfbc chapter 34b per 2012 iebc appendix a-4. retail cost application. | $60,000 |
| Dec 3, 2013 | Never finaled issued Dec 2013, no final | 145 Gough St | street spaceDetails
street space | ||
| Feb 29, 2012 | Completed final sign-off Aug 2012 | 145 Gough St | San Francisco Fire Protection | emergency fire panel replacement only:install 1 silent knight sk-4 fire panel connecting to extg devices 3 system sensor smoke detectors, 1 pull station, 2 bells removing 1 notifier sfp-400b fire panel. provide as-builts.Details
emergency fire panel replacement only:install 1 silent knight sk-4 fire panel connecting to extg devices 3 system sensor smoke detectors, 1 pull station, 2 bells removing 1 notifier sfp-400b fire panel. provide as-builts. | $1,500 |
| Oct 12, 2011 | Expired or cancelled cancelled Jan 2026 | 141 Gough St | De Jong Construction | accessibily upgrade to front entrance to comply with cbc 2010, chapter 11b.Details
accessibily upgrade to front entrance to comply with cbc 2010, chapter 11b. | $2,500 |
| Aug 2, 2011 | Completed final sign-off Oct 2011 | 141 Gough St | De Jong Construction | change of use from m retail to m retail food market. relocation of front door, installation of partition walls, refrigeration, sinks & equipment for specialty food market. counter, flooring, electrical, plubming for interior t.i.Details
change of use from m retail to m retail food market. relocation of front door, installation of partition walls, refrigeration, sinks & equipment for specialty food market. counter, flooring, electrical, plubming for interior t.i. | $25,000 |
| Mar 3, 2010 | Completed final sign-off May 2010 | 145 Gough St | Sure, Inc. | replace 3 windows to vinyl double pane windows. side & rear. same size. u-factor 0.40 max. side & rear facing. no windows are being replaces in bedrooms.Details
replace 3 windows to vinyl double pane windows. side & rear. same size. u-factor 0.40 max. side & rear facing. no windows are being replaces in bedrooms. | $1,000 |
| Jan 27, 2010 | Completed final sign-off May 2010 | 145 Gough St | Sure, Inc. | unit #1 -replace cabinets & countertops in kitchen. replace bathtub, replace tiles in bathroom, replace vanity & medicine cabinets. 50% watt in h.e. lights @ kitchen, h.e. lights or "manual on" o.s. @ bath.Details
unit #1 -replace cabinets & countertops in kitchen. replace bathtub, replace tiles in bathroom, replace vanity & medicine cabinets. 50% watt in h.e. lights @ kitchen, h.e. lights or "manual on" o.s. @ bath. | $10,000 |
| Jan 27, 2004 | Expired or cancelled expired Dec 2006 | 141 Gough St | remove sink and bath tub at grd fl.remove illegal g/f unit comply nov 200226734.Details
remove sink and bath tub at grd fl.remove illegal g/f unit comply nov 200226734. | $2,500 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.