M F Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2007 to Aug 2026
- Last 24 months
- 9 permits filed
177 permits since 2000: 149 completed, 1 in progress, 11 never finaled, 16 expired or cancelled.
Of the 11 never-finaled permits, 1 is 3 to 5 years old, 5 are 5 to 10 years old, 5 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
5 roof deck permits: 4 completed, 1 expired or cancelled. Typically 45 days from filing to permit and 302 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 2, 2019 | Completed final sign-off Nov 2022 | 170 Day St | gr fl 3 bedrooms, 2 full baths, stairs to all 3 floors. 2nd fl remodel kitchen, 1/2 bath, relocate living rm, din rm, family rm, new rear deck. convert attic to master bdrm, bath, roof deck, dormers, skylightsDetails
gr fl 3 bedrooms, 2 full baths, stairs to all 3 floors. 2nd fl remodel kitchen, 1/2 bath, relocate living rm, din rm, family rm, new rear deck. convert attic to master bdrm, bath, roof deck, dormers, skylights | $200,000 |
| Oct 3, 2017 | Expired or cancelled withdrawn Jan 2019 | 1627 Beach St | renovation of (e) 2 family residence. no vertical or horizontal addition. new stairs down from unit 1 to new occupied rooms in (e) storage. unit 2: new internal stairs thru new rolling skylite to new roof deck on penthouse.Details
renovation of (e) 2 family residence. no vertical or horizontal addition. new stairs down from unit 1 to new occupied rooms in (e) storage. unit 2: new internal stairs thru new rolling skylite to new roof deck on penthouse. | $100,000 |
| Dec 14, 2016 | Completed final sign-off Jan 2017 | 2645 Broderick St | replace roof deck in (e) size & location less than 50%Details
replace roof deck in (e) size & location less than 50% | $25,000 |
| Mar 10, 2015 | Completed final sign-off Mar 2016 | 217 San Carlos St | renovation of upper unit 217 on 3rd floor of extg duplex. relocate extg bedroom, kitchen, and bathroom and add half bath. add interior stair and roof hatch to access new roof deck(392 sq ft)Details
renovation of upper unit 217 on 3rd floor of extg duplex. relocate extg bedroom, kitchen, and bathroom and add half bath. add interior stair and roof hatch to access new roof deck(392 sq ft) | $100,000 |
| Oct 10, 2014 | Completed final sign-off Sep 2015 | 210 Bocana St | interior remodel, add 1 bath on the 1st fl and add 1 bath on the 3rd fl. relocate bath on the 2nd fl. new roof deck. add windows on side. woodclad windows on front.replace all side and rear windows. level bldg and rebuild entry stairs.Details
interior remodel, add 1 bath on the 1st fl and add 1 bath on the 3rd fl. relocate bath on the 2nd fl. new roof deck. add windows on side. woodclad windows on front.replace all side and rear windows. level bldg and rebuild entry stairs. | $20,000 |