Back to bathroom remodel contractors
M F Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2007 to Aug 2026
- Last 24 months
- 9 permits filed
177 permits since 2000: 149 completed, 1 in progress, 11 never finaled, 16 expired or cancelled.
Of the 11 never-finaled permits, 1 is 3 to 5 years old, 5 are 5 to 10 years old, 5 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
43 bathroom remodel permits: 37 completed, 1 never finaled, 5 expired or cancelled. Typically 0 days from filing to permit and 165 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 18, 2025 | Completed final sign-off Jul 2026 | 415 Fillmore St | remodel existing kitchen and two bathrooms new cabinets new counters new tile repair lath and plaster patch with sheet rock. no removal of wallsDetails
remodel existing kitchen and two bathrooms new cabinets new counters new tile repair lath and plaster patch with sheet rock. no removal of walls | $100,000 |
| Sep 28, 2022 | Completed final sign-off Nov 2022 | 170 Day St | rev to pa# 2019-1002-3266: relocate 2 partiton walls, 1 door and bathroom plumbing in 3rd master, replace proposed rear exterior door in 1st floor bedroom windowDetails
rev to pa# 2019-1002-3266: relocate 2 partiton walls, 1 door and bathroom plumbing in 3rd master, replace proposed rear exterior door in 1st floor bedroom window | $10,000 |
| Dec 2, 2020 | Never finaled issued Dec 2020, no final | 296 Clipper St | remodel kitchen and bathroom in existing configuration.Details
remodel kitchen and bathroom in existing configuration. | $40,000 |
| Dec 2, 2020 | Completed final sign-off May 2023 | 2701 Van Ness Av | unit#711: remodel bathroom, no change to configuration.Details
unit#711: remodel bathroom, no change to configuration. | $20,000 |
| Oct 2, 2019 | Completed final sign-off Nov 2022 | 170 Day St | gr fl 3 bedrooms, 2 full baths, stairs to all 3 floors. 2nd fl remodel kitchen, 1/2 bath, relocate living rm, din rm, family rm, new rear deck. convert attic to master bdrm, bath, roof deck, dormers, skylightsDetails
gr fl 3 bedrooms, 2 full baths, stairs to all 3 floors. 2nd fl remodel kitchen, 1/2 bath, relocate living rm, din rm, family rm, new rear deck. convert attic to master bdrm, bath, roof deck, dormers, skylights | $200,000 |
| Sep 5, 2019 | Completed final sign-off Mar 2020 | 350 Capistrano Av | convert existing storage area into living space - add 3 bedrooms and 3 bathrooms; install new exterior sliding door, including new lighting, electrical and plumbing; demo concrete slab floor; install new lowered slab floor to gain code ht req; construct (n) ext & int walls, ceilings and doorsDetails
convert existing storage area into living space - add 3 bedrooms and 3 bathrooms; install new exterior sliding door, including new lighting, electrical and plumbing; demo concrete slab floor; install new lowered slab floor to gain code ht req; construct (n) ext & int walls, ceilings and doors | $100,000 |
| Feb 23, 2018 | Expired or cancelled cancelled Nov 2022 | 268 Clara St | remove wall, door and plumbing fixtures at bath. new wall, door, plumbing fixtures at bathroom, to ada compliant. add walls to conceal plumbing. to comply with eid nov. #201833621. changing f-2 to f-1 (cannabis). alarm/sprinkler deferred.Details
remove wall, door and plumbing fixtures at bath. new wall, door, plumbing fixtures at bathroom, to ada compliant. add walls to conceal plumbing. to comply with eid nov. #201833621. changing f-2 to f-1 (cannabis). alarm/sprinkler deferred. | $20,000 |
| Oct 12, 2017 | Completed final sign-off Aug 2018 | 141 Gough St | #8 - remodel kitchen and bath unit #8Details
#8 - remodel kitchen and bath unit #8 | $15,000 |
| Oct 12, 2017 | Completed final sign-off Aug 2018 | 141 Gough St | #7 - remodel kitchens and baths in unit #7Details
#7 - remodel kitchens and baths in unit #7 | $15,000 |
| Jul 13, 2017 | Completed final sign-off May 2018 | 337 Warren Dr | remove existing walls doors, finishes. new walls, door, install new finishes. remodel kitchen and bath.add media room, bedroom & bathroom on level 1.Details
remove existing walls doors, finishes. new walls, door, install new finishes. remodel kitchen and bath.add media room, bedroom & bathroom on level 1. | $125,000 |
| Jun 5, 2017 | Completed final sign-off Jul 2017 | 708 10th Av | legalize family room, bedroom bathroom and interior stair on 1st fl for existing lower residential unit on 2nd flDetails
legalize family room, bedroom bathroom and interior stair on 1st fl for existing lower residential unit on 2nd fl | $28,000 |
| May 17, 2017 | Expired or cancelled withdrawn Jan 2018 | 183 Bocana St | horizontal addition. remodel & addition of an (e) 4 bedroom, 1 bath sfr with 1305.2 9e) living sq.ft. on 2441 sq.ft. lot. 405 sq.ft. of garage area converted to new living area.Details
horizontal addition. remodel & addition of an (e) 4 bedroom, 1 bath sfr with 1305.2 9e) living sq.ft. on 2441 sq.ft. lot. 405 sq.ft. of garage area converted to new living area. | $350,000 |
| Mar 14, 2017 | Completed final sign-off May 2017 | 149 Kensington Wy | remodel bathroom. relocate laundry. new tub. shower valve, tile & fixtures.Details
remodel bathroom. relocate laundry. new tub. shower valve, tile & fixtures. | $30,000 |
| Sep 29, 2016 | Completed final sign-off Apr 2019 | 52 Yukon St | addition and remodel of an (e) 2 bed, 1 bath single family residence with 899 sq ft (e) living. (e) garage level 697.5 sq ft on 2304 lot. 1351.5 sq ft addition of new living area.Details
addition and remodel of an (e) 2 bed, 1 bath single family residence with 899 sq ft (e) living. (e) garage level 697.5 sq ft on 2304 lot. 1351.5 sq ft addition of new living area. | $350,000 |
| Jul 22, 2016 | Completed final sign-off Dec 2016 | 306 Fell St | remodel kitchen & bathroom (new cabinets) new counters, new tile, new fixtures, upgrade electricalDetails
remodel kitchen & bathroom (new cabinets) new counters, new tile, new fixtures, upgrade electrical | $30,000 |
| Jul 15, 2016 | Completed final sign-off Mar 2017 | 1459 32nd Av | bathroom remodel, like for like, change tub, tile & fixtures.Details
bathroom remodel, like for like, change tub, tile & fixtures. | $25,000 |
| May 12, 2016 | Completed final sign-off Sep 2016 | 1535 Chestnut St | remodel kitchen and 2 bathrooms in unit # 303Details
remodel kitchen and 2 bathrooms in unit # 303 | $50,000 |
| Sep 1, 2015 | Completed final sign-off Sep 2015 | 210 Bocana St | revision to pa 2014 1010 8652 - to reflect (e) as built conditions - modify (e) walls and add 1 bathroom - interior changes onlyDetails
revision to pa 2014 1010 8652 - to reflect (e) as built conditions - modify (e) walls and add 1 bathroom - interior changes only | $10,000 |
| Aug 25, 2015 | Completed final sign-off Dec 2015 | 21 Marview Wy | remodel kitchen & (2) bathrooms. no change to layout of fixtures. new cabinets, counters, flooring, tile & fixtures.Details
remodel kitchen & (2) bathrooms. no change to layout of fixtures. new cabinets, counters, flooring, tile & fixtures. | $30,000 |
| Mar 10, 2015 | Completed final sign-off Mar 2016 | 217 San Carlos St | renovation of upper unit 217 on 3rd floor of extg duplex. relocate extg bedroom, kitchen, and bathroom and add half bath. add interior stair and roof hatch to access new roof deck(392 sq ft)Details
renovation of upper unit 217 on 3rd floor of extg duplex. relocate extg bedroom, kitchen, and bathroom and add half bath. add interior stair and roof hatch to access new roof deck(392 sq ft) | $100,000 |
| Jan 20, 2015 | Completed final sign-off Apr 2015 | 2875 Jackson St | bathroom remodel ; replace tile and fixturs ; no change to fixture locations; to comply with cec 140.0(k)5Details
bathroom remodel ; replace tile and fixturs ; no change to fixture locations; to comply with cec 140.0(k)5 | $10,000 |
| Oct 10, 2014 | Completed final sign-off Sep 2015 | 210 Bocana St | interior remodel, add 1 bath on the 1st fl and add 1 bath on the 3rd fl. relocate bath on the 2nd fl. new roof deck. add windows on side. woodclad windows on front.replace all side and rear windows. level bldg and rebuild entry stairs.Details
interior remodel, add 1 bath on the 1st fl and add 1 bath on the 3rd fl. relocate bath on the 2nd fl. new roof deck. add windows on side. woodclad windows on front.replace all side and rear windows. level bldg and rebuild entry stairs. | $20,000 |
| Aug 15, 2014 | Completed final sign-off Nov 2015 | 215 San Carlos St | renovation of lower unit #215 of extg duplex. relocate extg bedroom, kitchen, bathroom and add half bath on 2nd floor. add interior stair to connect new family room, master bedroom, master bathroom and laundry closet plus or minus sq ft on 1st floor.Details
renovation of lower unit #215 of extg duplex. relocate extg bedroom, kitchen, bathroom and add half bath on 2nd floor. add interior stair to connect new family room, master bedroom, master bathroom and laundry closet plus or minus sq ft on 1st floor. | $80,000 |
| Jul 7, 2014 | Completed final sign-off Dec 2014 | 3916 Sacramento St | remove all trim, casings, doors, plaster, lath and tile; remodel 2 bathrooms and 1 kithcen; repaint, re-finish floors; to comply with cec150(k) 8 & 10Details
remove all trim, casings, doors, plaster, lath and tile; remodel 2 bathrooms and 1 kithcen; repaint, re-finish floors; to comply with cec150(k) 8 & 10 | $50,000 |
| Apr 21, 2014 | Completed final sign-off Jul 2014 | 3918 Sacramento St | kitchen & 2 baths remodel; remove lath & lath plaster; rewire, new plumbing, new sheetrock;, new tile new cabinets new fixtures; replace doors. comply with cec150(k) 8 & 10Details
kitchen & 2 baths remodel; remove lath & lath plaster; rewire, new plumbing, new sheetrock;, new tile new cabinets new fixtures; replace doors. comply with cec150(k) 8 & 10 | $38,000 |
| Jul 31, 2013 | Completed final sign-off Sep 2013 | 85 Ora Wy | bathroom remodel - replace shower valve replace tile, replace vanity & sink, replace light fixtures all in existing locations. new shower, repair broken water pipeDetails
bathroom remodel - replace shower valve replace tile, replace vanity & sink, replace light fixtures all in existing locations. new shower, repair broken water pipe | $14,000 |
| Dec 27, 2012 | Expired or cancelled expired Oct 2016 | 365 25th Av | 365 remodel bathroom remodel & reconfigure kitchen , 367 remodel bathroom remodel kitchen , remove lathr & plaster on interior to min 1hr between unit, install radiant floor heating upgrade electrical & plumbing insall tankless waterh eater.Details
365 remodel bathroom remodel & reconfigure kitchen , 367 remodel bathroom remodel kitchen , remove lathr & plaster on interior to min 1hr between unit, install radiant floor heating upgrade electrical & plumbing insall tankless waterh eater. | $30,000 |
| Sep 17, 2012 | Completed final sign-off Nov 2012 | 2152 15th St | legalize (e) bathroom in attic space in unit 2152.Details
legalize (e) bathroom in attic space in unit 2152. | $5,000 |
| Mar 26, 2012 | Completed final sign-off Dec 2012 | 328 Shotwell St | remodel bathroom (existing) fixtures in present locations to be replaced in same locations, replace tile, install shower pan (fibreglass)Details
remodel bathroom (existing) fixtures in present locations to be replaced in same locations, replace tile, install shower pan (fibreglass) | $10,000 |
| Mar 15, 2012 | Completed final sign-off Nov 2013 | 3318 Folsom St | raise (e) structure 1'-10"above foundation; provide (n) foundatn wall @ basement & interior stair to 1st fl. provide basement level garage door w/ sidewalk curb cut & driway. new basement level bedroom & bath. new exterior steps at front entry to match existing.Details
raise (e) structure 1'-10"above foundation; provide (n) foundatn wall @ basement & interior stair to 1st fl. provide basement level garage door w/ sidewalk curb cut & driway. new basement level bedroom & bath. new exterior steps at front entry to match existing. | $125,000 |
| Jan 3, 2012 | Completed final sign-off Jan 2012 | 2574 41st Av | remodel bathroom. change tub toilet and vanity, remove and install tile. all new lighting must comply with cec 150(k)Details
remodel bathroom. change tub toilet and vanity, remove and install tile. all new lighting must comply with cec 150(k) | $4,500 |
| Oct 11, 2011 | Completed final sign-off Apr 2012 | 224 Ordway St | legalize bedroom & bath @ 1st floor, remodel kitchen & bath, change doors & casing, replace trim & baseboard, repair & replace lath & plaster w/gyp borad, repair & replace "in-kind" windows in living room & bedroom at front on 2nd floor , repair damaged dryrot areas at front.Details
legalize bedroom & bath @ 1st floor, remodel kitchen & bath, change doors & casing, replace trim & baseboard, repair & replace lath & plaster w/gyp borad, repair & replace "in-kind" windows in living room & bedroom at front on 2nd floor , repair damaged dryrot areas at front. | $25,000 |
| Jun 27, 2011 | Completed final sign-off Oct 2011 | 580 Banks St | add family room, bathroom, 2 bedrooms on 1st floor. upgrade existing interior stair. remodel existing kitchen and bath on 2nd fl. replace 13 windows in kindDetails
add family room, bathroom, 2 bedrooms on 1st floor. upgrade existing interior stair. remodel existing kitchen and bath on 2nd fl. replace 13 windows in kind | $50,000 |
| Mar 4, 2011 | Completed final sign-off Nov 2011 | 537 Congo St | remodel kitchen, baths, demo lath & plaster, rewire, replumb, install new gypsum board, comply with his nov #200338890 (repair front stairway)Details
remodel kitchen, baths, demo lath & plaster, rewire, replumb, install new gypsum board, comply with his nov #200338890 (repair front stairway) | $55,000 |
| Dec 1, 2010 | Completed final sign-off Mar 2011 | 3912 Folsom St | remodel kitchen and bath. remove cabinets and fixtures & replace with new. repalce windows at front with wood rear with vinyl, u factor =.40. repair dryrot at front facade. provide high efficency lights or o.s. per cec150(k)Details
remodel kitchen and bath. remove cabinets and fixtures & replace with new. repalce windows at front with wood rear with vinyl, u factor =.40. repair dryrot at front facade. provide high efficency lights or o.s. per cec150(k) | $40,000 |
| Mar 2, 2010 | Completed final sign-off Apr 2010 | 796 Moultrie St | remodel kitchen & bath on bottom unit. stair repair @ rear less than 50%.lighting per cec 150 k . no change ti exhust systemDetails
remodel kitchen & bath on bottom unit. stair repair @ rear less than 50%.lighting per cec 150 k . no change ti exhust system | $15,000 |
| Jan 26, 2010 | Completed final sign-off Mar 2010 | 794 Moultrie St | work on #794 only remodel kitchen & bathroom on top floor unitDetails
work on #794 only remodel kitchen & bathroom on top floor unit | $10,000 |
| Sep 29, 2009 | Completed final sign-off Apr 2010 | 4062 24th St | remodel bathroom in residential unit (plumbing fixtures) replace shower pan, shower valve, tile, replace vanity, replace floor tile, new lightingDetails
remodel bathroom in residential unit (plumbing fixtures) replace shower pan, shower valve, tile, replace vanity, replace floor tile, new lighting | $8,000 |
| Oct 10, 2008 | Completed final sign-off Oct 2008 | 726 Ellsworth St | to comply w/ nov 200874534, to remove kitchen & bath at ground floor.Details
to comply w/ nov 200874534, to remove kitchen & bath at ground floor. | $5,000 |
| Sep 19, 2008 | Completed final sign-off Jul 2009 | 55 Manchester St | remove lath & plaster, rewire, repair plumbing, install gyp board, install new doors & windows @ rear install new trim & casing. remodel kitchens (2) & baths(4) . repair dryrot, paint comply w/nov#2000338855 items 2.3.4.5. reroofDetails
remove lath & plaster, rewire, repair plumbing, install gyp board, install new doors & windows @ rear install new trim & casing. remodel kitchens (2) & baths(4) . repair dryrot, paint comply w/nov#2000338855 items 2.3.4.5. reroof | $75,000 |
| Jul 11, 2008 | Expired or cancelled cancelled Mar 2020 | 3931 24th St | vert & horizontal addition to exist bldg. addition of 1 dwelling and 2 offices; reconfigure and remodel all existing units; top units to include 2 bedrooms, study and 2.5 baths 0Details
vert & horizontal addition to exist bldg. addition of 1 dwelling and 2 offices; reconfigure and remodel all existing units; top units to include 2 bedrooms, study and 2.5 baths 0 | $300,000 |
| Feb 5, 2008 | Expired or cancelled cancelled Jan 2020 | 151 23rd Av | comply with physical inspectio report 3r-5120 to change 2nd & 3rd floor bathrooms & kitchen. add door on 1st floor & 4th floor. convert single bathroom into two batrooms at 2nd & 3rd floor, extend countertop in kitchen. new windows on 2nd & 3rd floor.Details
comply with physical inspectio report 3r-5120 to change 2nd & 3rd floor bathrooms & kitchen. add door on 1st floor & 4th floor. convert single bathroom into two batrooms at 2nd & 3rd floor, extend countertop in kitchen. new windows on 2nd & 3rd floor. | $50,000 |
| Dec 11, 2007 | Completed final sign-off Apr 2008 | 760 Anderson St | kitchen and 2 bath remodel, rmove wall coverings, add insulation add gypboard, replace sliding dodor at rear, new floor coverings and furnace, new vinyl windows not visible from streetDetails
kitchen and 2 bath remodel, rmove wall coverings, add insulation add gypboard, replace sliding dodor at rear, new floor coverings and furnace, new vinyl windows not visible from street | $30,000 |