Block 1383, lot 009
151 23rd Av
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 16, 2008 | Completed final sign-off Jun 2008 | 151 23rd Av | 1)comply with attached 3r-report dated 09/18/07.2)add partition wall between (e) bathroom to add bathroom at 2nd and 3rd floor per plan to document (e) 3)alter master bedroom doorway. 4)reconfigure 4th floor stair per plan.Details
1)comply with attached 3r-report dated 09/18/07.2)add partition wall between (e) bathroom to add bathroom at 2nd and 3rd floor per plan to document (e) 3)alter master bedroom doorway. 4)reconfigure 4th floor stair per plan. | $21,700 | |
| Feb 5, 2008 | Expired or cancelled cancelled Jan 2026 | 151 23rd Av | comply with physical insp report 3r-5120 to change 2nd & 3rd floor bathrooms & kitchens. add door on 1st floor & 4th floor, vonvert single bathroom into two bathrooms at 2nd & 3rd floor, extend countertop in kitchens.Details
comply with physical insp report 3r-5120 to change 2nd & 3rd floor bathrooms & kitchens. add door on 1st floor & 4th floor, vonvert single bathroom into two bathrooms at 2nd & 3rd floor, extend countertop in kitchens. | ||
| Feb 5, 2008 | Expired or cancelled cancelled Jan 2020 | 151 23rd Av | M F Construction | comply with physical inspectio report 3r-5120 to change 2nd & 3rd floor bathrooms & kitchen. add door on 1st floor & 4th floor. convert single bathroom into two batrooms at 2nd & 3rd floor, extend countertop in kitchen. new windows on 2nd & 3rd floor.Details
comply with physical inspectio report 3r-5120 to change 2nd & 3rd floor bathrooms & kitchen. add door on 1st floor & 4th floor. convert single bathroom into two batrooms at 2nd & 3rd floor, extend countertop in kitchen. new windows on 2nd & 3rd floor. | $50,000 |
| Oct 31, 2005 | Completed final sign-off May 2006 | 151 23rd Av | Ruby Plumbing & Electrical | rev. addition fie sprinkler systewm from 2nd floor to 4th floor per plan nfpa.13 1999 for applic. #2005/08/23/0980Details
rev. addition fie sprinkler systewm from 2nd floor to 4th floor per plan nfpa.13 1999 for applic. #2005/08/23/0980 | $4,500 |
| Aug 23, 2005 | Completed final sign-off May 2006 | 151 23rd Av | Ruby Plumbing & Electrical | install fire sprinkler system per plan nfpa 131999, total new heads 20.Details
install fire sprinkler system per plan nfpa 131999, total new heads 20. | $9,800 |
| Mar 29, 2005 | Completed final sign-off May 2006 | 151 23rd Av | Sun Shing Construction Co | bedrm & bath at grnd flr. stairs connecting grnd flr to 1st flr unit no. 1. (n) bathrm at 2nd flr (Details
bedrm & bath at grnd flr. stairs connecting grnd flr to 1st flr unit no. 1. (n) bathrm at 2nd flr ( | $150,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Ruby Plumbing & Electrical (2), M F Construction, Sun Shing Construction Co
- Architects
- John Hood
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.