H 2 Construction
- Based in
- Millbrae
- On San Francisco permits
- Mar 2012 to Sep 2026
- Last 24 months
- 5 permits filed
21 permits since 2000: 17 completed, 1 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
5 stairs permits: 5 completed. Typically 25 days from filing to permit and 233 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 20, 2025 | Completed final sign-off Dec 2025 | 270 Claremont Bl | tile (e) stairs at front of house, less than 50% repair, no changes, street visible.Details
tile (e) stairs at front of house, less than 50% repair, no changes, street visible. | $1,100 |
| Oct 28, 2024 | Completed final sign-off Dec 2025 | 270 Claremont Bl | rear yard excavation of 18.4cy.relocate stair.1/f:add 1 bed & 1 bath,interior layout reconfig & remodeling 2/f:add 1 bed & 1 bath; layout reconfig. new windows on ne, new w/h, hvac, floor heating, upgrade 200amp service panel.Details
rear yard excavation of 18.4cy.relocate stair.1/f:add 1 bed & 1 bath,interior layout reconfig & remodeling 2/f:add 1 bed & 1 bath; layout reconfig. new windows on ne, new w/h, hvac, floor heating, upgrade 200amp service panel. | $142,000 |
| Feb 3, 2016 | Completed final sign-off Jul 2020 | 267 Clipper St | vertical addition with front & rear roof deck. horizontal 2 story bump out into rear yard. conditioning of 1st floor storage area. add 2 bedrooms, 3 baths, upgrading elect, plumb, mech, addition one parking space via car lift, adding of exterior staircase.Details
vertical addition with front & rear roof deck. horizontal 2 story bump out into rear yard. conditioning of 1st floor storage area. add 2 bedrooms, 3 baths, upgrading elect, plumb, mech, addition one parking space via car lift, adding of exterior staircase. | $400,000 |
| Aug 6, 2014 | Completed final sign-off Dec 2015 | 110 Santa Clara Av | repair the rear stair and upper bedroom balcony. in includes wood dryrot and tile and railing - less than 50% replacementDetails
repair the rear stair and upper bedroom balcony. in includes wood dryrot and tile and railing - less than 50% replacement | $1,000 |
| Mar 9, 2012 | Completed final sign-off Aug 2012 | 60 Ocean Av | tenantimprovement; change of use from retail to exercise gym, (n) ada compliant restrooms, new concrete floor, structural column relocation, miscellaneous interior renovations, remove exterior stairs to rear yard.Details
tenantimprovement; change of use from retail to exercise gym, (n) ada compliant restrooms, new concrete floor, structural column relocation, miscellaneous interior renovations, remove exterior stairs to rear yard. | $47,354 |