Back to bathroom remodel contractors
H 2 Construction
- Based in
- Millbrae
- On San Francisco permits
- Mar 2012 to Sep 2026
- Last 24 months
- 5 permits filed
21 permits since 2000: 17 completed, 1 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 7 completed, 1 never finaled. Typically 101 days from filing to permit and 358 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 28, 2024 | Completed final sign-off Dec 2025 | 270 Claremont Bl | rear yard excavation of 18.4cy.relocate stair.1/f:add 1 bed & 1 bath,interior layout reconfig & remodeling 2/f:add 1 bed & 1 bath; layout reconfig. new windows on ne, new w/h, hvac, floor heating, upgrade 200amp service panel.Details
rear yard excavation of 18.4cy.relocate stair.1/f:add 1 bed & 1 bath,interior layout reconfig & remodeling 2/f:add 1 bed & 1 bath; layout reconfig. new windows on ne, new w/h, hvac, floor heating, upgrade 200amp service panel. | $142,000 |
| Apr 13, 2022 | Never finaled filed Apr 2022, never issued | 119 Girard St | to comply with his nov's 202289105 & 202289274. add heating system, repair bathroom floor tile, clear hallway, add smoke detectors, repair toilet, clean floorDetails
to comply with his nov's 202289105 & 202289274. add heating system, repair bathroom floor tile, clear hallway, add smoke detectors, repair toilet, clean floor | $6,000 |
| Nov 21, 2017 | Completed final sign-off Jan 2019 | 780 Duncan St | to comply withnov 200343508: remodel (e) 2 story sfr w/2 car garage. conversion of 441.9 sq ft of (e) garage enclosure of 61.1 sq ft of covered entryway. add of 1/2 bath. legalize of (e) roof deck and remove windscreens replace with railings, fillfillment of corrective action of novDetails
to comply withnov 200343508: remodel (e) 2 story sfr w/2 car garage. conversion of 441.9 sq ft of (e) garage enclosure of 61.1 sq ft of covered entryway. add of 1/2 bath. legalize of (e) roof deck and remove windscreens replace with railings, fillfillment of corrective action of nov | $200,000 |
| Jul 10, 2017 | Completed final sign-off Oct 2018 | 215 Bradford St | remodel (e) kitchen, add skylight, remove load bearing wall on 2/f, add post & beam. remodel (e) upstairs bath, add bath on g/f. update electrical with nema 5-15.Details
remodel (e) kitchen, add skylight, remove load bearing wall on 2/f, add post & beam. remodel (e) upstairs bath, add bath on g/f. update electrical with nema 5-15. | $34,000 |
| Feb 3, 2016 | Completed final sign-off Jul 2020 | 267 Clipper St | vertical addition with front & rear roof deck. horizontal 2 story bump out into rear yard. conditioning of 1st floor storage area. add 2 bedrooms, 3 baths, upgrading elect, plumb, mech, addition one parking space via car lift, adding of exterior staircase.Details
vertical addition with front & rear roof deck. horizontal 2 story bump out into rear yard. conditioning of 1st floor storage area. add 2 bedrooms, 3 baths, upgrading elect, plumb, mech, addition one parking space via car lift, adding of exterior staircase. | $400,000 |
| Jul 10, 2015 | Completed final sign-off Sep 2016 | 18 Jade Pl | remodel & alteration 3 br; additon of interior partitions, floors,finishes. upgrade mep; remodel kit & bath. add 2 bedrooms, 1 office, 2 baths. replace e decking. railing, roofing. remove b/f rear deck & replace 1/f deck & replace e windows/drsDetails
remodel & alteration 3 br; additon of interior partitions, floors,finishes. upgrade mep; remodel kit & bath. add 2 bedrooms, 1 office, 2 baths. replace e decking. railing, roofing. remove b/f rear deck & replace 1/f deck & replace e windows/drs | $175,000 |
| Jul 23, 2014 | Completed final sign-off Apr 2016 | 110 Santa Clara Av | revision to pa #2013/1230/5275. reconfigure entertainment room, half bathroom and laundry room at basement level. reconfigure existing bathrooms and master bathroom at first and second level.Details
revision to pa #2013/1230/5275. reconfigure entertainment room, half bathroom and laundry room at basement level. reconfigure existing bathrooms and master bathroom at first and second level. | |
| Dec 30, 2013 | Completed final sign-off Apr 2016 | 110 Santa Clara Av | 1)add a entertainment area, a half bathroom with laundry area and wet bar at basement level. 2)remodel extg bathrooms and kitchen area at 1st , 2nd level. 3) replace all the windows in kind with wood frame material windows.Details
1)add a entertainment area, a half bathroom with laundry area and wet bar at basement level. 2)remodel extg bathrooms and kitchen area at 1st , 2nd level. 3) replace all the windows in kind with wood frame material windows. | $70,000 |