Back to kitchen remodel contractors
H 2 Construction
- Based in
- Millbrae
- On San Francisco permits
- Mar 2012 to Sep 2026
- Last 24 months
- 5 permits filed
21 permits since 2000: 17 completed, 1 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 2 completed, 1 in progress. Typically 73 days from filing to permit and 554 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 9, 2026 | In progress issued Sep 2026 | 3172 Sacramento St | kitchen remodel. repair in kind, no change in layout, new cabinets, new countertop and appliances.Details
kitchen remodel. repair in kind, no change in layout, new cabinets, new countertop and appliances. | $12,700 |
| Jul 10, 2017 | Completed final sign-off Oct 2018 | 215 Bradford St | remodel (e) kitchen, add skylight, remove load bearing wall on 2/f, add post & beam. remodel (e) upstairs bath, add bath on g/f. update electrical with nema 5-15.Details
remodel (e) kitchen, add skylight, remove load bearing wall on 2/f, add post & beam. remodel (e) upstairs bath, add bath on g/f. update electrical with nema 5-15. | $34,000 |
| Dec 30, 2013 | Completed final sign-off Apr 2016 | 110 Santa Clara Av | 1)add a entertainment area, a half bathroom with laundry area and wet bar at basement level. 2)remodel extg bathrooms and kitchen area at 1st , 2nd level. 3) replace all the windows in kind with wood frame material windows.Details
1)add a entertainment area, a half bathroom with laundry area and wet bar at basement level. 2)remodel extg bathrooms and kitchen area at 1st , 2nd level. 3) replace all the windows in kind with wood frame material windows. | $70,000 |