Block 3072A, lot 001
110 Santa Clara Ave
- City’s use
- Single Family Residential
- Built
- 1925
- Stories
- 3
- Units
- 1
- Rooms
- 4 bedrooms, 3 bathrooms
- Building
- 3,065 sq ft
- Lot
- 5,471 sq ft
- Zoning
- RH1D
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 22, 2017 | Completed final sign-off Aug 2017 | 110 Santa Clara Av | Tom Lee Roofing Inc. | re-roofingDetails
re-roofing | $45,000 |
| Aug 27, 2014 | Completed final sign-off Nov 2014 | 110 Santa Clara Av | Green Metro Inc | revision to structural and calcs for basement plan and 1st floor framing plan. revise a connection for beam detail. rererence: pa# 2013-1230-5175 & pa# 2014-0723-2006.Details
revision to structural and calcs for basement plan and 1st floor framing plan. revise a connection for beam detail. rererence: pa# 2013-1230-5175 & pa# 2014-0723-2006. | |
| Aug 6, 2014 | Completed final sign-off Dec 2015 | 110 Santa Clara Av | Green Metro Inc, H 2 Construction | repair the rear stair and upper bedroom balcony. in includes wood dryrot and tile and railing - less than 50% replacementDetails
repair the rear stair and upper bedroom balcony. in includes wood dryrot and tile and railing - less than 50% replacement | $1,000 |
| Jul 23, 2014 | Completed final sign-off Apr 2016 | 110 Santa Clara Av | Green Metro Inc, H 2 Construction | revision to pa #2013/1230/5275. reconfigure entertainment room, half bathroom and laundry room at basement level. reconfigure existing bathrooms and master bathroom at first and second level.Details
revision to pa #2013/1230/5275. reconfigure entertainment room, half bathroom and laundry room at basement level. reconfigure existing bathrooms and master bathroom at first and second level. | |
| Dec 30, 2013 | Completed final sign-off Apr 2016 | 110 Santa Clara Av | Green Metro Inc, H 2 Construction | 1)add a entertainment area, a half bathroom with laundry area and wet bar at basement level. 2)remodel extg bathrooms and kitchen area at 1st , 2nd level. 3) replace all the windows in kind with wood frame material windows.Details
1)add a entertainment area, a half bathroom with laundry area and wet bar at basement level. 2)remodel extg bathrooms and kitchen area at 1st , 2nd level. 3) replace all the windows in kind with wood frame material windows. | $70,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Green Metro Inc (4), H 2 Construction (3), Tom Lee Roofing Inc.
- Engineers
- Moses Huang
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.