H 2 Construction
- Based in
- Millbrae
- On San Francisco permits
- Mar 2012 to Sep 2026
- Last 24 months
- 5 permits filed
21 permits since 2000: 17 completed, 1 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
2 roof deck permits: 2 completed. Typically 314 days from filing to permit and 706 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 21, 2017 | Completed final sign-off Jan 2019 | 780 Duncan St | to comply withnov 200343508: remodel (e) 2 story sfr w/2 car garage. conversion of 441.9 sq ft of (e) garage enclosure of 61.1 sq ft of covered entryway. add of 1/2 bath. legalize of (e) roof deck and remove windscreens replace with railings, fillfillment of corrective action of novDetails
to comply withnov 200343508: remodel (e) 2 story sfr w/2 car garage. conversion of 441.9 sq ft of (e) garage enclosure of 61.1 sq ft of covered entryway. add of 1/2 bath. legalize of (e) roof deck and remove windscreens replace with railings, fillfillment of corrective action of nov | $200,000 |
| Feb 3, 2016 | Completed final sign-off Jul 2020 | 267 Clipper St | vertical addition with front & rear roof deck. horizontal 2 story bump out into rear yard. conditioning of 1st floor storage area. add 2 bedrooms, 3 baths, upgrading elect, plumb, mech, addition one parking space via car lift, adding of exterior staircase.Details
vertical addition with front & rear roof deck. horizontal 2 story bump out into rear yard. conditioning of 1st floor storage area. add 2 bedrooms, 3 baths, upgrading elect, plumb, mech, addition one parking space via car lift, adding of exterior staircase. | $400,000 |