Gregory Loughran Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2016 to Feb 2024
- Last 24 months
- 0 permits filed
34 permits since 2000: 31 completed, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
8 stairs permits: 7 completed, 1 expired or cancelled. Typically 26 days from filing to permit and 360 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 1, 2023 | Completed final sign-off Nov 2023 | 269 29th Av | replace extg brick entry stairs in kind. no change to layout or designDetails
replace extg brick entry stairs in kind. no change to layout or design | $15,000 |
| Dec 8, 2022 | Completed final sign-off Nov 2023 | 269 29th Av | architectural design revision to 202205265117. reconfigure 1/f and 2/f interior spaces. relocate the skylight window and protect it with a firewall. add a utility room to (e) b/m (not a living space). remove (e) backyard access stairs. adjust rear deck design. replace windows and doors in kind atDetails
architectural design revision to 202205265117. reconfigure 1/f and 2/f interior spaces. relocate the skylight window and protect it with a firewall. add a utility room to (e) b/m (not a living space). remove (e) backyard access stairs. adjust rear deck design. replace windows and doors in kind at | |
| Oct 18, 2022 | Completed final sign-off Dec 2023 | 440 36th Av | remodel of sfd. new windows, doors, lighting, plumbing fixures, finishes. infill deck stair, new laundry room, new entry gate. bathroom and kitchen remodel.Details
remodel of sfd. new windows, doors, lighting, plumbing fixures, finishes. infill deck stair, new laundry room, new entry gate. bathroom and kitchen remodel. | $250,000 |
| Jan 9, 2020 | Completed final sign-off Jul 2021 | 1520 06th Av | convert 584 sf of storage space to habitable area with bedroom, playrm and 2 baths and laundry in the lower fl. add new stairs from upper to lower floor, convert (e) bath to pwder rm, add 6' concrete patio at rear of `Details
convert 584 sf of storage space to habitable area with bedroom, playrm and 2 baths and laundry in the lower fl. add new stairs from upper to lower floor, convert (e) bath to pwder rm, add 6' concrete patio at rear of ` | $300,000 |
| Jan 16, 2019 | Completed final sign-off Jul 2023 | 2347 16th Av | renovation to include repair replace concrete slab foundation, replace add new windows 1st level, replace e interior stair, replace furnace. add shearwalls at second floor.Details
renovation to include repair replace concrete slab foundation, replace add new windows 1st level, replace e interior stair, replace furnace. add shearwalls at second floor. | $65,000 |
| Sep 12, 2017 | Completed final sign-off Aug 2018 | 114 Virginia Av | 1st fl: remove (e) stairs, add (n) stairs, add bedroom, remodel family rm, add (2) bathrooms. 2nd fl: remodel (e) two bathrooms, bedrooms, enclose lightwell to add (n) office, remodel kitchen. new windows. repair deck.Details
1st fl: remove (e) stairs, add (n) stairs, add bedroom, remodel family rm, add (2) bathrooms. 2nd fl: remodel (e) two bathrooms, bedrooms, enclose lightwell to add (n) office, remodel kitchen. new windows. repair deck. | $100,000 |
| Aug 1, 2017 | Expired or cancelled withdrawn Feb 2018 | 1247 Harrison St | revision to pa #201701096737. partial demo of (e) mezzanine, rebuild part of mezzanine - no new sq ft. demo (e) stair - build (n) stair. remodel electrical fixtures and switches. new guardrail at mezzanine. ** maher: n/a **Details
revision to pa #201701096737. partial demo of (e) mezzanine, rebuild part of mezzanine - no new sq ft. demo (e) stair - build (n) stair. remodel electrical fixtures and switches. new guardrail at mezzanine. ** maher: n/a ** | |
| Jan 9, 2017 | Completed final sign-off Jun 2019 | 1247 Harrison St | unit #11 - new partial height wall & door at den, new soffit @ stair & den, remodeled electrical @ living room, den, bedroom, new railings at mezzanine. arch/elec plans n/a maher ordinanceDetails
unit #11 - new partial height wall & door at den, new soffit @ stair & den, remodeled electrical @ living room, den, bedroom, new railings at mezzanine. arch/elec plans n/a maher ordinance | $8,000 |