Gregory Loughran Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2016 to Feb 2024
- Last 24 months
- 0 permits filed
34 permits since 2000: 31 completed, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
6 deck permits: 5 completed, 1 expired or cancelled. Typically 18 days from filing to permit and 331 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 8, 2022 | Completed final sign-off Nov 2023 | 269 29th Av | architectural design revision to 202205265117. reconfigure 1/f and 2/f interior spaces. relocate the skylight window and protect it with a firewall. add a utility room to (e) b/m (not a living space). remove (e) backyard access stairs. adjust rear deck design. replace windows and doors in kind atDetails
architectural design revision to 202205265117. reconfigure 1/f and 2/f interior spaces. relocate the skylight window and protect it with a firewall. add a utility room to (e) b/m (not a living space). remove (e) backyard access stairs. adjust rear deck design. replace windows and doors in kind at | |
| Oct 18, 2022 | Completed final sign-off Dec 2023 | 440 36th Av | remodel of sfd. new windows, doors, lighting, plumbing fixures, finishes. infill deck stair, new laundry room, new entry gate. bathroom and kitchen remodel.Details
remodel of sfd. new windows, doors, lighting, plumbing fixures, finishes. infill deck stair, new laundry room, new entry gate. bathroom and kitchen remodel. | $250,000 |
| May 26, 2022 | Completed final sign-off Nov 2023 | 269 29th Av | (n) deck @ rear. 1st/f: infill light well to creatr bigger power rm, infill an alcove @ north side of the bldg. recofigure 1st/f space to create mew dinning, family rm. 2nd/f: add an entry btw kid room #2 & kids playroom. recofigure master bath and common bath. infill light wells 2nd fl.Details
(n) deck @ rear. 1st/f: infill light well to creatr bigger power rm, infill an alcove @ north side of the bldg. recofigure 1st/f space to create mew dinning, family rm. 2nd/f: add an entry btw kid room #2 & kids playroom. recofigure master bath and common bath. infill light wells 2nd fl. | $220,000 |
| Jun 20, 2018 | Completed final sign-off Aug 2018 | 114 Virginia Av | per inspectors request, revision to note for permit 201709127737. change language from "repair" to "replace" for rear deck due to structural failureDetails
per inspectors request, revision to note for permit 201709127737. change language from "repair" to "replace" for rear deck due to structural failure | |
| May 17, 2018 | Expired or cancelled suspend Jun 2018 | 145 Missouri St | to comply with nov #201858781 dated 4/27/18, 2nd floor kitchen & rear deck remodel. replace front fence & gate. maher naDetails
to comply with nov #201858781 dated 4/27/18, 2nd floor kitchen & rear deck remodel. replace front fence & gate. maher na | $15,000 |
| Sep 12, 2017 | Completed final sign-off Aug 2018 | 114 Virginia Av | 1st fl: remove (e) stairs, add (n) stairs, add bedroom, remodel family rm, add (2) bathrooms. 2nd fl: remodel (e) two bathrooms, bedrooms, enclose lightwell to add (n) office, remodel kitchen. new windows. repair deck.Details
1st fl: remove (e) stairs, add (n) stairs, add bedroom, remodel family rm, add (2) bathrooms. 2nd fl: remodel (e) two bathrooms, bedrooms, enclose lightwell to add (n) office, remodel kitchen. new windows. repair deck. | $100,000 |